冬季停工 的英文怎麼說

中文拼音 [dōngtínggōng]
冬季停工 英文
winter shutdown
  • : Ⅰ動詞1 (停止) stop; halt; cease; pause 2 (停留) stay; remain; stop off [over]: 船在錨地停了一...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個況的測試,即夏製冷況的測試、供熱況的測試、夏?過渡測試和?夏過渡測試;另外在夏況的測試中還進行了變流量測試,在況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了(夏)況埋管吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡地下一二層埋管溫度恢復情形,得出熱泵系統機一周內地溫恢復特別快。
分享友人