分組裝拆器 的英文怎麼說

中文拼音 [fēnzhuāngchài]
分組裝拆器 英文
packet assembler/disassembler pad
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : 拆動詞[方言] (排泄大小便) excrete
  • : 名詞1. (器具) implement; utensil; ware 2. (器官) organ 3. (度量; 才能) capacity; talent 4. (姓氏) a surname
  • 組裝 : package; assembling; packaging組裝車間 composing room; 組裝船 fabricated ship; 組裝生產 assembly ...
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節成。文中介紹的採用胎具製作和綁扎鋼筋,底腹板和頂板別綁扎並吊鋼筋骨架入模;式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向段、腹板水平層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. Based on remaining the dismantling and loading, we make full of the equipped instrument, and fall the whole cycle into three modules : speed - adjusting module, pressure module and multi - execution instrument module. we must compile the related plc control program and pc control program, and redesign the control cabinet and re - fix the electric cycle. we complete the auto - control of the hydraulic experiment table through the loading and recapitulate debugging

    在保留其元件可性的基礎上,我們充利用現有液壓實驗臺的液壓元件,對其基本迴路進行重新合,為調速、壓力和多執行元件控制迴路三個模塊,並編制可編程式控制制程序和上位機數據採集程序控制迴路動作,重新設計該實驗臺的電氣控制櫃,並進行現場接線和安調試,實現所有教學必須實驗迴路的自動控制。
  3. This system tests 19 parameters such as the pressure of fore and after main fluid pumps and every sub fluid pumps ", force of pedal, turn angle of steering wheel, speed of every wheels and car body, and calculates 9 correlation analyses according to the gb112676 - 1999 " automobile system structure, capability and test methods " and gb7258 - 1997 " technical regulation of automobile safety ", also it can generate data report automatically

    該系統對汽車制動過程中前後液壓總泵出口液壓、各制動泵進口液壓、腳踏板力、方向盤轉角、各車輪轉速、車體速度等共計19個物理量進行測試。系統硬體由便攜式計算機、數據採集以及相應傳感成。硬體設計中採用了模塊化設計思想,使得測試系統體積小、重量輕、抗振動、安卸方便、易於維護、可以進行隨車實測試驗。
  4. An acceptable alternative is to use a demountable system which allows the filters and downstream distribution system to be removed, dried and steam sterilized between sessions. disinfection after re - assembly to kill dislodged organisms should be carried out

    一種可接受的替代方法是採用可卸系統,使得過濾和下水配系統能在每次使用之間卸、乾燥和蒸汽滅菌,然後在重新之後執行消毒,殺死游移的有機物。
分享友人