削石坡 的英文怎麼說

中文拼音 [xiāodàn]
削石坡 英文
rock cut slope
  • : 削動詞1. (用刀斜著去掉物體的表層) pare [peel] with a knife 2. (乒乓球的一種打法) cut; chop
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • 石坡 : rock slope
  1. There are some disadvantages on traditional construction method of the transition material 2b on upstream face of concrete face rockfill dam, i. e. overtopping, slope - cutting and incline compaction

    混凝土面板堆壩上游面傳統的墊層料超填、、斜碾壓的施工方法存在許多弊端。
  2. By the phenomenon came from critical sand - gravel granular mixtures slope experiment, the falling causation, form, scale, and preventing principal in sliding - sand slope were discussed. the causation can be drawn : the slope received sands from the slope top continuously ; non - uniform degree and granular size in strong weathering environment may be changing ; and the restrain in slope foot was weakened. these factors, cause the fal

    結合乾燥沙臨界單面實驗現象觀察,對溜砂災害的產生原因、崩塌特性及防治原則進行了討論,提出溜砂崩塌的三個主要成因:寒凍風化引起上部沙粒來源的持續不斷;面的風化作用使顆粒進一步均勻、細化,造成原來處于亞臨界而穩定的面達到臨界而容易失穩;腳對牽引式崩塌的制衡作用弱,易受腳干擾而誘發。
  3. 5. for frozen erosion the good measure is to cut slop and lining with coarse gravel ; meanwhile, adjust the canal operating to less the frozen

    ( 5 )對于凍融和凍脹較為嚴重的渠段則宜採用后鋪碎護岸;為減輕凍融侵蝕,同時採取適當的調度方式。
  4. In this paper the friction piles are used in zipingpu multi - purpose dam construction project, the spillway in the side slope is covered with overburden, the horizontal area is from sp. 0 + 200m to sp. 0 + 280m, the elevation is about from el. 810m to el. 950m, there is hard and integral rock under the overburden, which provides enough anchor ability, and it ' s requirement to set the friction pile at the appropriate place ; in order to improve the slope stability that suitable excavation or weeding off the disadvantage load on the landslide are good measures, for the scarp it ' s better to reduce the slope

    摘要紫坪鋪水利樞紐工程溢洪道樁號0 + 200 ~ 0 + 280 、高程810 ~ 950m范圍的內側邊為覆蓋層邊體下部有較為完整堅硬的巖,具備提供足夠錨固力的條件,在適當的位置可以考慮設置抗滑樁,再通過適量的開挖提高邊穩定性,或將滑體上部不利於穩定的荷載挖除,對于陡面可以將緩,則效果會更好。
  5. In operation construction of retaining wall in san sang san

    位於鰲?建造工程中的土斜
  6. Slope cutting and soil nail construction

    位於鰲?土斜工程
  7. Formation of cut slope at ngau hom shek

    在鰲?興建中的土斜
分享友人