吊裝架 的英文怎麼說

中文拼音 [diàozhuāngjià]
吊裝架 英文
mast-up
  • : hangsuspend
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ名詞1 (用來放置東西或支撐物體等的東西; 架子) frame; rack; shelf; stand 2 (毆打; 爭吵) fight;...
  • 吊裝 : [建築] hoisting吊裝車 sling cart; 吊裝工 slinger; 吊裝豎井 emplacement hole; 吊裝套管 emplacement casing
  1. Technical requirement for lifeboat davit installation

    置技術條件
  2. Fourth, the paper treats two kinds of hoisting projects of high alititude construction in bulk and member assembly, hositing machine and plan layout, setting up scaffold and joints, and installing trunks, branches and joints etc. then in detail discusses the method which applys total station to measure three - dimensional coordinate of dendriform structure, including selecting survey sign points, creating survey system and converting survey coordinate system etc. the paper also deep research on the welding performance, welding method, welding process, welding stress and control, welding strain and rectification, weld defects analysis and weld quality inspection, and so on complicated heterogeneity steel weld proplems

    接著系統的論述了高空散法和分單元安法兩種樹狀結構方案,樹狀結構機械及平面布置,樹狀結構胎及節點的搭設,以及樹狀結構樹干、樹枝和節點的工藝等諸多工藝問題。詳細的論述了採用全站儀對樹狀結構進行空間三維坐標測量的方法,包括測量標志點的選取、測量系統的建立及測量坐標的轉換等問題。深入地研究了樹狀結構可焊性、焊接方法、焊接工藝、焊接應力及控制、焊接變形及矯正、焊接缺陷分析及焊接質量檢查等復雜的異種鋼焊接問題。
  3. Treatment of hoisting problem of oblique pyramidic latticed frame

    一起斜放四角錐網問題的處理
  4. The drills included rescue rubber dinghies moving in formation, a vertical landing by a rescue helicopter, evacuation of victims by amphibious vehicles, saving people in rapid water through the use of rubber dinghies, vertical evacuation of victims, use of a rope - gun, setting up a rope - bridge over a valley or stream, vertical descent from great heights, and a display of advanced earthquake rescue equipment

    演習的項目包括救生橡皮艇水上分列式直升機垂降救援水陸兩用車撤離災民橡皮艇急流水中救援垂直地形傷患拖拋繩槍救援溪谷單索設高空垂降,及多項先進的地震救援配靜態展示。
  5. The design of hoisting cableway in wudang mountain xuan regnal palace according to the characteristic and requirements of cableway design in the view and in line with the principle of advanced technology, reasonable economy, safety and appliance, includes the general arrangement of cableways, calculation of skyline and wookline, checking computation of the support and the anchorage, productivity calculation

    摘要根據景區空索道設計的特點及要求,本著技術先進、經濟合理、安全適用的原則,對武當山南巖宮玄帝殿索道進行設計,包括索道總體布置、承載索與工作索設計、支與錨碇的驗算,並進行生產率的計算。
  6. Abstract : in view of, in the modification and maintenance of petro - chemical unit, the limited working space and inability of available hoisting equipment to meet hoisting installation requirements, a simple and reliable hoisting tool used is introduced taking account of the construction conditions

    文摘:在石油化工置大型設備的技術改造和檢修作業中,針對現場施工空間小、現有設備無法滿足施工要求的情況,介紹了因地制宜設置簡單可靠的機具,完成作業的方法?門旋轉作業法的成功應用。
  7. During its storage, transportation, maintenance and service, the solid rocket motor ( srm ) may encounter many incidents such as being dropped onto the ground while being hoisted up, crashing when vehicle turns over during transportation, being struck heavily in takeoff or landing accident while being carried by airplane, impacting with launch platform or buildings when there is abnormality during launch of multiple - stage rocket. impact of great intensity takes place in such accidents, which will lead to srm ignition or explosion

    固體火箭發動機在貯存、運輸、維護及使用過程中可能遇到各種意外機械撞擊激勵,例如:過程中跌落,運輸過程中因交通事故發生翻覆碰撞,機載固體導彈掛飛時因載機發生起降事故導致高速沖撞,多級火箭發射初期因發射異常與發射或地面建築物發生碰撞等,固體火箭發動機將受到劇烈機械撞擊載荷作用,導致其著火燃燒甚至爆炸。
  8. A helicopter lowered a paramedic, who attached nancy to a life - support hoist

    直升機放下了一位醫務人員,醫務人員將南茜系在生命維持起置上。
  9. After an introduction to the research on the software for the design of the variant steel arched girder construction, the creation of the structural model, the structure of the supporting seat, the design of the variant arched girder, and the measures taken to ensure the stability of the plane surface of the arched girder, the thesis goes to study the methods for the hoisting and the angle setting of the long - span arched girders, as well as the bolting of the axle pin in the hinge support

    論文首先對變異鋼拱結構設計可採用的軟體、結構模型的建立、支座構造形式、變異拱梁的設計,以及保證拱梁平面外穩定所採取的措施等進行了研究,然後研究了大跨度變異鋼拱弧形梁、角度的調整、鉸支座穿軸銷等的施工方法,最後對施工完成後的位移進行了實際量測。
  10. The work high above the ground can be reduced efficiently and the installing quality of support can be ensured through installing on ground and erecting entirely

    充分利用制式器材在地面拼,整體,有效地減少了高空作業,保證了支的安精度和拼質量。
  11. These common methods include high altitude assemble construction in bulk, life - on segment by segment, integral life - on, integral hoisting, integral erect etc. some of these methods need a lot of falsework and others depend on devices for life - on or hoisting

    的發展也要求施工方法不斷更新和提高,以滿足工程技術和經濟的要求,從滿搭腳手鋪設高空散,到分片、整體、整體提升、整體頂升。
  12. Referring to some type of the structure such as plane truss, grid truss and grid shell, the author dissertates the common construction technique including whole installation, integral propping up, integral lifting, high altitude construction in bulk, member assembly and sliding construction

    結合大跨度鋼結構的各種形式,如平面桁、網、網殼等,概要的論述了其一般的施工方法、工藝和技術要點,包括整體法、整體頂升法、整體提升法、高空散法、分單元法和高空滑移法。
  13. During the 3d finite element calculation, try to simulate different procedure of the construction ( like sunk well in - filling, main cable erection, box girder hoist, bridge flooring and opening to traffic ). and then, reveal the regulation of deformation and displacement on the foundation and soil during different period. after got these, this thesis put great attention on the analysis of the reason which cause the horizontal displacement of the cable saddle, as well as the regulation of the pressure ' s changing in the soil located on the front side of the sunk well foundation

    在三維有限元計算中,對不同工況(沉井充填、錨體澆築、主纜設、箱梁、橋面鋪以及通車運營)下的施工過程作了模擬,全面揭示了各工況下錨碇沉井基礎與地基土的變形變位規律,著重分析了影響散索鞍水平位移的因素以及不同工況下沉井前測地基土水平向抗力變化規律,並提出了不同深度地基土水平向抗力與水平位移間的擬合關系。
  14. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、索無應力長度計算、空纜線形與預偏量計算、絲股設線形計算、索夾安位置計算和加勁梁線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  15. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並鋼筋骨入模;拆式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  16. There are many materials and members to be hoisted during construction of the suspension bridge, unfortunately, the out - spread overhead curved cable makes it impossible for hoisting the stiffening girder with normal cable - supported lift. in order to ensure the construction proceeded smoothly, a multifunctional overhead cableway system is developed, thus accommodating all the hoisting tasks for the superstructure ( stiffening girder )

    懸索橋施工中需要的材料和構件很多,豐都長江大橋懸索橋主纜採用空間外張式,使加勁梁的不能採用一般的纜載機形式,為使施工的順利進行,本橋施工中開發了多功能高索道施工方案,以一副索道完成了多種工作,全面解決了上部結構(包括加勁梁)的多項作業。
  17. The common disadvantage of these methods is that the proceeding of construction need large space as a result the other parts of the structure construction ca n ' t go on at the same time

    前者需要大量的腳手料,後者依賴、提升設備;而且大都存在佔用室內施工面,難以同步進行室內施工。因此,逐條積累滑移法應運而生。
  18. The fan can be mounted in ways hanging on the ceiling or fixing on the wall. upon request of users

    本風機可採用懸掛式安或支承托安,上水泥預埋安;並可根據用戶要求生產。
  19. The paper describes the main techniques in the integral sliding construction for large span structure, which includes jacking scheme, plan layout, assembly, transport and stacking of components, setting of sliding system, setting of track, conformation of falsework, traction facility etc. discusses emphatically the sliding falsework, which includes the material, conformation, manufacture, welding and assembling of the shape steel tape falsework

    系統分析了大跨度鋼桁整體滑移施工中的起重機具的選擇與布置、施工平面布置、桁結構拼單元及滑移單元劃分、滑移施工方案及工藝流程、桁的連接、拼運輸、及堆放、滑移軌道布置、滑移滾輪構造、延伸平臺布置以及滑移牽引系統等諸多工藝問題。
  20. ( 2 ) using tractor as power, makes it mobile and agile, and, the tractor can be used to do another work if it is not used to drive the tunnel. the tractor with simple hoist implement can assemble the wind tunnel by use of the oil cylinder of tractor itself without another special implement

    ( 2 )使用拖拉機為動力,機動靈活,實驗時,使用一根傳動軸連接拖拉機和風洞實現動力傳遞,實驗后脫開連接不影響拖拉機其它方面的使用,同時,拖拉機配備簡易的吊裝架后利用液壓懸掛可以風洞,從而不必為風洞配備專用設備。
分享友人