圍護墻材料 的英文怎麼說

中文拼音 [wéicáiliào]
圍護墻材料 英文
wall-enclosure material
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • : 名詞1 (木料) timber 2 (泛指可以直接製成成品的東西; 材料) material 3 (供寫作或參考的資料) ma...
  • : 名詞1 (材料; 原料) material; stuff 2 (喂牲口用的穀物) feed; fodder 3 (料器) glassware 4 (...
  • 材料 : 1. (原料) material 2. (資料) data; material 3. (適于做某種事的人才) makings; stuff
  1. In the mean time it occur d to me that it would require a vast deal of time for me to do this, and that i must be contented to run the venture where i was, till i had form d a camp for my self, and had secur d it so as to remove to it : so with this resolution i compos d my self for a time, and resolv d that i would go to work with all speed to build me a wall with piles and cables, c

    同時,我也想到,建個新家耗費時日,目前還不得不冒險住在這里。以後,等我建造好一個新的營地,並也像這兒一樣保起來,才能再搬過去。這樣決定之後,我心裏安定多了,並決定以最快的速度,用木樁和纜索之類的照這兒的樣子築一道,再把帳篷搭在里。
  2. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石堰基礎處理與施工技術;大江截流上下游土石堰平拋墊底研究;二期堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌的結構與支研究;特大型水輪發電機組的科學研究。
  3. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石堰基礎處理與施工技術;大江截流上下游土石堰平拋墊底研究;二期堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌的結構與支研究;特大型水輪發電機組的科學研究。
  4. It usually consists of c - section steel wall studs and gypsum wallboard. wallboard are intended primarily for architecture purposes, but they may also provide effective restraining action for wall stud

    體一般由體密立柱(一般為卷邊槽鋼) 、(例如石膏板、定向板)組成。
  5. The light steel framing building adopts the cold - formed steel as the bearing framework and light material as the enclosing structure. as its strength - weight ratio is comparably high and it could be formed according to the design, the cold - formed steel has obvious integrate economic benefits

    冷彎薄壁住宅鋼結構以冷彎c型鋼龍骨結構體系為代表,採用經濟型冷彎型鋼為承重骨架,以輕型結構所構成。
  6. When there is original stage support only, the load ratio of surrounding rock gets more and more bigger with the increasing of crust stress, correspondingly, the load ratio of initial stage support gets smaller. when the initial stage support and the second support act each other, the load ratio of surrounding rock is more than fifty percent, and it has little change with the increasing of crust stress. the whole analysis of the surrounding rock and support shows that the bottom arch of liner and the feet of liner have serious stress concentration, so do the sidewalls and the foot of a wall of the surrounding rock

    通過屈曲理論分析結果對比表明,彈性屈曲和突變失穩分析的結果比非線性屈曲分析的結果要大得多,非線性分析由於考慮了非線性和幾何非線性,因而結果與實際接近實際;當只有初期支時,隨著地應力的增加,巖的荷載分擔率增大,相應地,初期支的荷載分擔率就減小了;當有初期支和二次襯砌共同作用時,巖的荷載分擔率在50以上,這一分擔率隨地應力的增加其變化不大;支和巖體的整體分析表明,襯砌底拱及拱腳處應力集中嚴重,隧道巖體側巖的應力集中也較大。
分享友人