坑蓋 的英文怎麼說

中文拼音 [kēng]
坑蓋 英文
pit cover
  • : 蓋名詞(姓氏) a surname
  1. Capping each backfilled pit with uncontaminated mud effectively isolating the contaminated mud from the surrounding marine environment

    利用未受污染淤泥覆每個已回填的泥,以有效地分隔污泥和附近的海洋環境。
  2. At length i resolv d to try a pit - fall, so i dug several large pits in the earth, in places where i had observ d the goats used to feed, and over these pits i plac d hurdles of my own baking too, with a great weight upon them ; and several times i put ears of barley, and dry rice, without setting the trap, and i could easily perceive that the goats had gone in and eaten up the corn, for i could see the mark of their feet

    於是,我在山羊經常吃草的地方掘了幾個大陷,在上幾塊自製木條格子,再在上面壓了一些很重的東西。開始幾次,我在復好的陷上面放了一些大麥穗子和干米,但有意未裝上機關。我一看就知道,山羊曾走進去吃過穀物,因為上面留下了它們的腳櫻末了,有一天晚上,我一下子在三個陷阱里都安了機關。
  3. The major activities involved during the construction stage of the project are cut and fill earthworks, slope works, earth retaining walls, irrigation buffer lake, detention ponds and tanks, sand bunkers and golf course capping and turfing

    2 . 3 . 1在工程項目的施工期內,主要的工程活動包括挖填土方工程斜坡工程護土墻灌溉緩沖湖靜水塘缸沙及高爾夫球場的加草皮鋪設。
  4. Sfc marvin p. martin - facing 1st platoon, the slope was almost a forest, but directly in front of our pits, the rise was bare for a short distance

    馬文p .馬丁上士? ? 1排面對的山坡幾乎完全被森林所覆,但在我們所在散兵的正前方高地有一段距離是無遮蔽的。
  5. Civil engineering - land development - disposal of contaminated mud - management and capping of contaminated mud pit iv

    土木工程土地發展卸置污染泥料第四個污染泥料卸置的管理及覆工程
  6. From chixingshan, datongshan to shamaushan system, in total, we collect 16 places ground water and surface water. they are mainly takengxi water source, lujiaokeng water source, yangyi and yangsan water sources of yangmingshan and waisuangxi water source. they supply raw water for the tap water of highland area residents in shilin, tienmu, yangmingshan, beitou and suangxi and supplied water to a population more than 50, 000 and with wide coverage

    從七星山大屯山到紗帽山系,總共匯集了16處地面水及地下湧泉,主要包括大溪水源鹿角水源陽明山第一第三水源及外雙溪水源,供應士林天母陽明山北投雙溪等高地區民眾用水,供水人口超過5萬人,涵范圍甚廣,其重要性不容忽視。
  7. Pierre glanced into the pit and saw that the factory lad was lying there with his knees up close to his head, and one shoulder higher than the other

    皮埃爾朝裡望了一眼,看到工場伙計屈腿臥著,膝抵著頭朝上蜷著。一邊肩膀高一邊肩膀低。
  8. A solid - waste containment system can be simplified as a slope which contains a layer of geomembrane ( which is simplified as interlayer slope in the rest part ). shaking table model test and numerical analysis have been done to study the seismic stability of interlayer slope based on the two - part wedge theory in this paper. many factors which affect the slope stability ratio, including horizontal seismic coefficient, slope angle, soil - geomembrane interaction coefficient, slope length, layer thickness and soil character, have been took into consideration

    填埋場防滲基的邊坡可以簡化成含土工膜夾層的土坡(以下簡稱夾層土坡) ,本文根據「雙滑楔體」理論思想,對夾層土坡的地震穩定性問題進行了較為系統的模型試驗和數值分析,著重考慮了水平地震系數、夾層土坡坡角、土工膜與覆層土體摩擦系數、夾層邊坡長度和厚度、夾層土坡覆層土體性質等因素對土坡安全系數的影響,並對地震作用下夾層土坡的永久變形進行了初步的研究,給出了對實際工程設計有參考價值的結論。
  9. Figure 1. 2 preliminary layout for a multi - pit contained aquatic disposal facility in the east of sha chau area

    圖1 . 2沙洲東部多式的水中覆卸置設施的初步設計
  10. The purpose of the assessment was to thoroughly evaluate both the south brothers and east of sha chau facilities in terms of the acceptability of predicted impacts to water quality, marine ecology, fisheries, hazard to health, noise and cultural heritage from dredging, backfilling and capping of the pits, as well as the residual impacts and those from concurrent activities

    這評估的目的是深入評估磨刀洲南部及沙洲東部設施,就挖掘回填及封對水質海洋生態漁業健康危害噪音及文化遺產可能造成的影響,並對剩餘影響及同期進行其他相關活動時的影響,作出全面評估。
  11. Kcrc will adopt robust measures to mitigate the noise impact. these will include stringent contractual requirements for use of the quietest equipment available, confining noisy works to daytime, dividing the site into small work zones, not allowing noisy equipment to work at the same time in adjacent zones and installing decking under which noisy work can be shielded from the public

    這些措施包括:于合約內嚴格規定承建商使用最寧靜的機器進行工程;限制高噪音工程只能于日間進行;把工地劃分成多個小區;規定高噪音機器不可於相連的小區同時使用;以及在道上上鐵板,以阻隔噪音。
  12. Then they came near, and spake before the king concerning the king ' s decree ; hast thou not signed a decree, that every man that shall ask a petition of any god or man within thirty days, save of thee, o king, shall be cast into the den of lions

    但6 : 12他們便進到王前、題王的禁令、說、王阿、三十日內不拘何人、若在王以外或向神或向人求甚麼必被扔在獅子中、王不是在這禁令上了玉璽麼。
  13. Figure 1. 3 preliminary layout for a multi - pit contained aquatic disposal facility at the south brothers

    圖1 . 3磨刀洲南部多式的水中覆卸置設施的初步設計
分享友人