  1. And combining with compound analysis, this thesis has calculated and estimated the deformation and stability of slopes of the cliff debris and residual soil slope project on the project site at k15 + 183 of yong ' an section of yong - zhang highway ; ( 3 ) in the course of the cut slope excavation inner displacement has been in control of real time field monitoring

    同時邊後期頂會出現回彈現象。 3 、數值計算成果表明,隨著階數的增加,大小主應力在邊內也進行不斷的調整。邊處大小主應力值nlfep程序結果與ansys計算結果較為相似,兩者吻合性較好。
  2. It reveals that the slope stability is mainly controlled by a set of joingts nearly parallel to the slope surface with a moderate to gentle dip angel. obvisouly, its persistence ration is the most important factor among all th e charatcteristics related to the stability analysis. on the other hand, the nature slopes and the excavated ones show a series superficial deformation and failure phenomena related to unloading process and time - dependent deformation, which are all described and recorded in detail in author ' s work

    經過現場地質調查發現,邊中一組sn向中緩傾角結構面對邊的失穩具有控制意義,它的存在導致了邊可能的失穩模式為平面滑動,即當被剝蝕或進行切時,發生沿邊內sn向中緩傾節理滑移,沿后緣陡裂張的一種滑動失穩模式。
  3. Topics include : site investigation ( with emphasis on in situ testing ), shallow ( footings and raftings ) and deep ( piles and caissons ) foundations, excavation support systems, groundwater control, slope stability, soil improvement ( compaction, soil reinforcement, etc. ), and construction monitoring

    主題包含有工址調查(強調現地試驗) 、淺基礎(基式基礎與筏式基礎)和深基礎(樁基礎與沉箱) 、之支撐系統、地下水控制、邊穩定、土壤改良(夯實與土壤加勁等)和施工監測等。
  4. Through contrasting the characteristics of stress field inside the slope before and after the excavation, the results show that the horizontal stress upside the slope and the shear stress pointing to the outside slope near the foot change clearly

    通過對比前後邊內部的應力場特徵,發現:在影響邊穩定的指標性應力中,邊上部的水平應力受影響較大;在成附近,指向體外的剪應力顯著增加。
  5. By calculated and analysed of the lanedslide stability, it is conclused that the big fissure , clayey sail of ground water - level fluctuation and digged base of slope formed an unstable slope

    通過穩定性的定量計算與定性分析可知,體上的大裂縫與地下水變動帶在處剪出聯合組成的滑面穩定性最差,此滑將來的滑動破壞剪出口將在附近產生。