堰頂 的英文怎麼說

中文拼音 [yàndǐng]
堰頂 英文
weir crest
  • : 名詞(較低的擋水建築物) weir
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  1. Abstract : this paper introduces the scheme, deep cut of foundation pit to bury pipe, which is adopted for wenjiayan seawall in qiantang rever. compared with the scheme of withstanding pipe, this scheme has the advantage of saving investment, simple construction and time + - saving. it is convenient to check the anti - seep installation between water pipe and seawall

    文摘:本文通過錢塘江聞家海塘深基坑開挖埋管,替代原設計管方案,具有工程投資省、施工簡單、工期短,且便於檢查取水管與海塘之間防滲措施
  2. Standards for municipal wastewater discharge measurement. broad - crested weir

    城市排水流量槽測量標準.寬
  3. Liquid flow measurement in open channels. round - nose horizontal broad - crested weirs

    明渠液體流量測量.圓頭水平寬
  4. Methods of measurement of liquid flow in open channels - weirs and flumes - rectangular broad - crested weirs

    明渠流量測量.第4部分:溢流和斜槽.第4e節:矩形寬
  5. Methods of measurement of liquid flow in open channels - weirs and flumes - round nose horizontal broad - crested weirs

    明渠流量測量.第4部分:溢流和斜槽.第4f節:圓端水平寬
  6. It is widely applied to the stove top, shove head, stove door and burmer brick, the binding of cooling - tube and groove bottom of the molten steel mouth of the heat stove, meantime empopyed in the field of the step stove bottom, the fir - proof wall of the circular stove, the cover, the protruding tape and sand sealing mouth of the equal - heating stove, the triangle, the spray gun and meltingiron groove of electric stove and also including fire - resistant material used in the refine stove and the stove door

    加熱爐的爐、爐頭、爐門、燒嘴磚、水冷管包紮、出鋼槽槽底、步進爐爐底、環形爐檔火墻、均熱爐的爐蓋、凸出帶、砂封口、中間包包蓋、電爐三角區、鐵水包襯里、爐外精煉用噴槍,底吹氧煙道、鐵水溝蓋、檔渣、高爐中各種耐用火料襯里煉焦爐爐門等。
  7. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊梁、底梁等的應力和變形,並對比吊箱圍板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  8. ( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge. ( 3 ) calculate the altitude of downriver cofferdam, and make it meet the require of energy dissipation and erosion prevention. ( 4 ) calculate some average velocity of flow through some sections, including contracted section in stilling basins behind upriver cofferdam, if the hydraulic jump happen in lower reaches of the river. the program will calculate the average velocity of flow of contracted section and the length of the apron

    主要設計內容包括:計算上游圍后消力池的尺寸;驗證泄洪初期壩面高程是否能夠滿足消能防沖需要;計算下游圍堰頂高程,使其滿足泄洪期圍和壩體過流的消能防沖和工程進度的需要;計算部分斷面平均流速,包括:上游圍后消力池中收縮斷面的斷面平均流速;壩首和壩末的斷面平均流速;當下遊河道發生水躍時,計算下遊河道的收縮斷面平均流速及需要鋪設護坦的長度。
  9. In this paper a date from some real projects are used to analyse the facors that will affect the energy dissipation and erosion prevention. such as flood discharge across the cofferdam, crest elevation, downriver cofferdam, roughness coefficient and the gradient of the surface of dam, and so on. in this paper, the program based on hydraulics is checkout by the tankeng waterpower project in zhejiang. the results prove that this program can be used to design any project where there is no obvious side shrinking phenomena

    本文結合工程實際對影響圍和壩體消能防沖的各種因素,包括過流量、壩面高程、下游圍堰頂高程、壩面糙率、壩面坡度等進行了分析,並藉助水力學知識和計算機語言編寫了圍和壩體的優化計算程序,並利用浙江灘坑水電站工程對所提出優化計算程序進行了驗證,證明了該程序在沒有明顯的側收縮的影響下,計算結果與實際情況較為吻合。
  10. Methods of measurement of liquid flow in open channels - weirs and flumes - v - shaped broad crested weirs

    明渠流量測量.第4部分:溢流和斜槽.第4i節: v形寬
  11. Hydraulics research on flood - releasing during construction period of heightened scheme of dangjiangkou dam

    丹江口大壩加高堰頂溢流段施工渡汛試驗研究
  12. Liquid flow measurement in open channels by weirs and flumes. rectangular braod - crested weirs

    用溢流和水槽測定明渠中的水流量.矩形寬溢流
分享友人