堵口 的英文怎麼說

中文拼音 [kǒu]
堵口 英文
buster
  • : Ⅰ動詞(堵塞) stop up; block up Ⅱ形容詞(悶) stifled; suffocated; oppressed Ⅲ名詞1 [書面語] (墻...
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  1. Under extreme conditions of rapid coke forming materials, pore mouth blockage can occur.

    在快速形成焦炭材料的極端情況下,孔會發生塞。
  2. An auxiliary ejector with as little blockage in the ducting as possible is placed behind the inlet of the diffuser duct.

    一個輔助引射器,在通道中要以盡可能小的塞面積布置在擴壓器進之後。
  3. Police are investigating reports that all but one of the building ' s emergency doors were blocked

    警方對此進行了調查后報告說,情況發生時大樓里除一扇緊急出外其餘都被塞了。
  4. Victor ' s stuck in traffic over on fifth avenue

    維克托的車被在了第五街
  5. Whose mouths must be stopped, who subvert whole houses, teaching things which they ought not, for filthy lucre ' s sake

    11這些人的總要住。他們因貪不義之財,將不該教導的教導人,敗壞人的全家。
  6. The negro was an old man with neat grizzled hair, in a linen jacket, who stood barring the door with his body.

    那黑人已上了年紀,灰白的頭發梳得整整齊齊,身穿亞麻茄克衫,他用身子在門
  7. All ideas of stopping holes and hemming in the german intruders are vicious.

    一切想要塞缺和圍困德國侵略軍的辦法都是錯誤的。
  8. As is well known, intersections are the bottlenecks of urban road network. a lot of traffic accidents and jams occur at the intersection and hereabouts

    交叉是城市道路網的瓶頸,很多的事故發生在平面交叉及其附近,多數的交通塞現象也發生在其附近。
  9. Laboratory glassware ; interchangeable ground stoppers

    實驗室玻璃器具.可互換的磨
  10. He answered hurriedly. “ i was towing this junker when i saw a pickup truck stuck over there on that railroad crossing

    他匆忙回答道: 「我正吊著這輛破車,看到一輛皮卡在火車道叉
  11. In fownes s street, dilly dedalus, straining her sight upward from chardenal s first french primer, saw sunshades spanned and wheelspokes spinning in the glare john henry menton, filling the doorway of commercial buildings, stared from winebig oyster eyes, holding a fat gold hunter watch not looked at in his fat left hand not feeling it. where the foreleg of king billy s horse pawed the air mrs breen plucked her hastening husband back from under the hoofs of the outriders

    約翰亨利門側在商業大廈門,瞪著一雙用酒浸大了般的牡蠣眼睛,肥肥的左手搽著一塊厚實的雙蓋金錶213 ,他並不看表,對它也無所察覺,在比利王的坐騎214抬起前蹄抓撓虛空的地方,布林太太一把拽回她丈夫他差點兒匆匆地沖到騎馬侍從的馬蹄底下。
  12. At that hour of the night the narrow, damp well of a court, with its pestiferous water closets, its fountain, its back view ot the kitchen stove and the collection of plants with which the portress used to litter the place, was drenched in dark mist ; but the two walls, rising pierced with windows on either hand, were flaming with light, since the property room and the firemen s office were situated on the ground floor, with the managerial bureau on the left, and on the right and upstairs the dressing rooms of the company

    這時候,狹窄的院子很潮濕,乍看上去像一井的井底,周圍是臭氣熏人的廁所,水頭,廚房的爐灶,還有女門房胡亂堆放在那裡的草木。這一切統統籠罩在黑色煙霧之中然而,開在兩墻上的各扇窗戶裏面卻燈火輝煌。樓下是存放道具的倉庫和消防處,左邊是辦公室右邊和樓上是演員化妝室。
  13. Before charging work is started, the drill holo is plugged.

    開始裝藥以前,先將炮眼下端眼死。
  14. Jack managed to pry away a large stone blocking the entrance.

    傑克設法移開了住門的大石頭。
  15. According to the feature that deformation resulted from water absorption and mildew appear mainly on the rabbet surface of ccf, this paper adopts rsst to spray a special waterproof sealant on rabbet surface of ccf, so that the sealant can get into fiberboard to certain extent by means of capillarity and penetration, blockage the holes between fibers and capillary, cut up passage of water and change the properties of soakage and sorption to water in capillarity and fiber. at the same time, solidified sealant can form a compact waterproof pellicle on rabbet surface so as to prevent water and humidity from fiber ' s expansion and mildewing

    針對吸水變形、霉變主要發生在地板企表面的特徵,採用企表面全封閉法,在復合強化地板企表面噴塗特殊的防水封閉劑,使其依靠毛細管作用及滲透作用進入板內一定深度,塞木纖維之間的空隙及毛細孔通道,截斷水分傳遞的渠道,並改變毛細孔壁及纖維的表面性質以不利於水的浸潤與吸附,同時其固化后能在企表面形成一層緻密的憎水薄膜,防止水分、濕氣從企侵入板內引起木纖維膨脹變形、發霉等現象。
  16. U - shape absorption tubes with side arms and ground stoppers

    帶側面手柄和磨塞的型吸收管
  17. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多門、多庫容、多水閘)的龍水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍水力計算,為堵口合龍提供科學依據。
  18. Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex

    海堤和水閘的修建都是圍海工程先期施工的部分,堵口則是海堤修築的最後階段,堵口合龍成敗關繫到圍海工程成敗,由於此階段所遇到的水力條件十分惡劣,門落差可達2 3m ,流速最大可達到6 8m / s ,且水流極其復雜,根據我國《圍海工程技術規范》規定圍海堵口必須進行龍水力計算。
  19. Unshaped refractory products. determination of the extrusion resistance of the taphole clays

    散裝耐火材料製品.堵口泥抗擠壓的測定
  20. Generally reclamation engineering includes seawall, sluice and final closure

    圍海工程一般包括海堤、水閘、堵口三部分。
分享友人