堵水閘門 的英文怎麼說

中文拼音 [shuǐzhámén]
堵水閘門 英文
bulkhead gate
  • : Ⅰ動詞(堵塞) stop up; block up Ⅱ形容詞(悶) stifled; suffocated; oppressed Ⅲ名詞1 [書面語] (墻...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • : Ⅰ名詞1 (房屋、車船等的出入口 ) entrance; exit; door; gate 2 (形狀或作用像門的東西) switch; va...
  • 閘門 : 1 (水閘) sluice gate; gate; water gate2 (船閘) lock gate3 [機械工程] throttle valve; strobe; ...
  1. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善口工程龍口力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪、計算時段的變化、多口、多庫容、多)的龍口力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口力計算,為口合龍提供科學依據。
  2. Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex

    海堤和的修建都是圍海工程先期施工的部分,口則是海堤修築的最後階段,口合龍成敗關繫到圍海工程成敗,由於此階段所遇到的力條件十分惡劣,口落差可達2 3m ,流速最大可達到6 8m / s ,且流極其復雜,根據我國《圍海工程技術規范》規定圍海口必須進行龍口力計算。
  3. Design of gates for diversion tunnels and gate lowering at zipingpu water conservancy project

    紫坪鋪利樞紐工程導流洞封設計及下紀實