塔柱 的英文怎麼說

中文拼音 [zhù]
塔柱 英文
pylon
  1. The all-welded, a-frame pylon straddles the deck.

    全焊接的A形框架式的塔柱與橋面叉開。
  2. The natural bornite has stains and spots on the surface, showing a beautiful picture against a golden yellow background. yunnan tea is finely made, good in quality, and has a good assrtmnent. popular products include dianhong, dianliu, puercha, tuocha and qizhibing. the city of spring plants many varieties of flowers all the year round. now total number amounts to 400

    在雲南民族村裡,吉祥的傣寨白,壯觀的白族大理三,高聳的彝族圖騰,源遠流長的納西東巴文化,佤族的木鼓布朗族的婚俗基諾族的太陽鼓拉祜族的蘆笙舞奇特的摩梭人母系社會形態驚險的傈傈族上必杜活動以及風趣的亞洲群象表演,精美獨特的民族風味美食,會令您陶醉其中,流連忘返。
  3. The girder is braced against an erection bracket.

    梁支撐在塔柱上的一個施工托架上。
  4. The towers are 170 ft above the caisson.

    沉井以上的塔柱高度為170英尺。
  5. The towers are normally constructed of cellular sections.

    塔柱通常做成空腹斷面。
  6. This drilling adopts crank connecting link and walking beam percussion mechanism, which make the drilling possess two percussive functions, normal drilling takes connecting link impact as main mode, when encountering special situation and the connecting link impact can not drill, it can transform into hoisting impact, the stroke length can be modulated, it realizes automatic percussive drilling due to continuous operating of connecting link percussive mechanism, these can enhance drilling efficiency and relieve labor intensity ; it adopts pumping reverse circulation to drain slag, which not only resolves the drilling difficulty in special stratum such as pebble and gravel stratum and hard stratum, but also resolves the problem that the percussive drill ' s efficiency is low ; it adopts spur gear differential mechanism as double cylinders lazy tongs of main hoist, which not only ensures the balance state of drilling tool, but also reduces the mechanical design, and reduces the cost ; the bottom plate traveling motion of this drilling machine adopts walking type ; the drilling tower adopts hydraulic pressure uprising, and reduces the assistant operating time

    該鉆機採用曲柄連桿、游梁式沖擊機構,使鉆機具有兩種沖擊功能;正常鉆進以連桿沖擊為主,遇到特殊情況,用連桿沖擊不能鉆進時,可轉為卷揚沖擊,沖程可調,因連桿沖擊機構連續工作,所以實現了自動沖擊鉆進,可提高鉆進效率,減輕勞動強度;採用泵吸反循環的方式排渣,既能有效解決卵礫石地層、堅硬地層等特殊地層鉆進的困難,又很好地解決了沖擊鉆機效率低下的問題;採用直齒圓齒輪差速機構作為主卷揚的雙筒同步機構,既保證了鉆具處于平衡狀態,又大大簡化了該機構設計,降低了成本;該鉆機底盤行走移位採用步履式;鉆採用液壓起立,減少了輔助作業時間。
  7. The cables intersect the tower or pylon at different heights.

    鋼索在橋塔柱的不同高度上相交。
  8. Abstract : this paper expounds the main construction method of west cable tower of chongqing egongyan yangtze river suspension bridge, and gives a detailed description of construction technology of climbing form system with an inner climbing scaffold

    文摘:介紹重慶長江鵝公巖大橋懸索橋西主要施工方法,對西塔柱內爬架爬模系統施工工藝作了詳細闡述。
  9. Cables and towers are small and, therefore, easy to fabricate and erect.

    鋼索與塔柱均小,因此,易於製作與安裝。
  10. Generally ship lift structure is consisted of two or four huge reinforced concrete tube towers and a single - story machinery building on the top of tube towers. because the tube towers is demanded to support the large loads, the lateral stiffness of tube towers is a few hundred times as solid as that of the top machinery building and cause the sudden change of the stiffness. this change would cause insentive seismic whipping effect of the top building. the aseismic methods are difficultly used to reduce seismic responses of the top building of ship lift structure. the feasibility of develop an intelligent vibration control system is explored in the paper

    這樣,在塔柱頂部鋼筋混凝土平臺就會產生側移剛度的突變。這種巨大的剛度突變會引起升船機頂部廠房強烈的地震鞭梢效應,使得升船機頂部廠房地震反應的控制就成為升船結構抗震設計中的關鍵問題之一。由於採用常規的結構振動控制方法難以較好地解決升船機頂部廠房地震鞭梢效應,因此這就為智能振動控制技術的發展和應用提供了可能。
  11. Specifications for port rail - mounted high mast type crane

    港口高塔柱式軌道起重機技術條件
  12. The shantou bay suspension bridge is the first mordern suspension bridge in china its substructures are mainly towers and anchorages this paper presents some of the key techniques of the substructures construction , including the cable anchorage system setup , the hydrated heat control in the anchorage , construction of the foundation and bearing plate of the tower in the ocean , the control of tower construction , etc

    汕頭海灣大橋是我國第一座現代懸索橋下部結構主要包括索和錨碇本文介紹了該橋下部結構施工的一些關鍵技術環節,包括主纜錨碇錨固系統的安裝,大體積混凝土的溫控防裂,主基礎和承臺的海上施工,塔柱滑模施工控制等
  13. A new bridge structure cooperated by the single - towered cable - stayed structure and the rigid frame structure was presented. many aspects of jinma bridge are researched and analyzed, such as the design method, configuration of the superstructure, section choice of the tower, design and construction methods of the deep - water bases, the stiffness of the cooperated rigid frames, strengthening way in the tower. it is concluded that this new structure is the economical, aesthetic and suitable project for the large - span situation

    主要內容和結論如下: 1 、提出了獨斜拉橋與兩側剛構相連接的新型協作體系斜拉橋結構形式,並對該橋的方案比選、設計思路、橋面系結構形式、塔柱截面設計、深水基礎的設計及施工方法、協作剛構的剛度選取、塔柱的直束加固等方面作了詳細地計算分析和比較。
  14. It is necessary to study the construction technology of concrete cable bent towers. the dissertation introduces construction sequence, construction methods ( supporter construction, slip - form construction, climbing formwork and turn - over formwork construction ), anti - overturning measures of the tilted tower, crossbeams " construction and its bracing structure

    本文主要介紹了混凝土塔柱的施工順序、施工方法(支架法、滑模法、爬模法和翻模法) 、傾斜塔柱的施工抗傾措施、橫梁施工及支撐系統。
  15. Numerical evaluation of the strip foundation beams under the pillars of the box - type hoist tower

    箱形井塔柱列下條形基礎梁的數值計算分析
  16. The all - welded, a - frame pylon straddles the deck

    全焊接的a形框架式的塔柱與橋面叉開。
  17. Built in world war two as an anti - aircraft base to repel german bombers, the derelict platform was taken over 40 years ago by retired army major paddy roy bates who went to live there with his family

    不過這個「海國」是戰爭時代建早的堡壘,座落於北海中的兩根混凝土塔柱之上。 「海國」的前身是一個建於二戰時期抵禦德國轟炸的防空基地。
  18. ? an approximately one - light - year tall " pillar " of cold hydrogen towers above the wall of the molecular cloud

    頂部? ?一個大約一光年高的冷氫「塔柱」處在分子云墻的上面。
  19. [ top ] ? an approximately one - light - year tall " pillar " of cold hydrogen towers above the wall of the molecular cloud

    頂部? ?一個大約一光年高的冷氫「塔柱」處在分子云墻的上面。
  20. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土索施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張拉帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;索施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
分享友人