填築壩 的英文怎麼說

中文拼音 [tián]
填築壩 英文
embankment dam
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石的導流渡汛標準、導流方式及其選擇、施工期渡汛及分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石特點有關的問題進行研究,為工程建設提供一定的參考。
  2. Filling construction design of uockfill dam with face slab in shuanggou water power station

    雙溝水電站面板堆石施工設計
  3. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地區混凝土面板堆石均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地區修建大型面板堆石的成功記錄,解決了一系列國內外均無先例的難題。
  4. Hydraulic fill dams are built of sand and silt brought into the dam in a stream of water, usually through a pipe.

    水力沖通常是用一根管子利用水流把砂和粉沙運到體處
  5. According to their building material, dams are described as concrete, earth fill, rock fill, hydraulic fill and so on.

    按照所用材料,可以把稱為混凝土、堆石,水力沖等等。
  6. Damming technique by sand - earth exchange with filtering fabrics and cushion with long tubular sackcloth

    抽沙充土工織物反濾布長管袋褥墊技術
  7. It founds natural heightening theory for warping dams and puts forward specific way of diversion, measures for preventing dam eroded and design for energy dissipation and flood storage of cofferdams and sedimentation and dewatering through exploration and study on deposition in front of natural formed dam and the techniques of building dam through hydraulic filling

    通過對天然聚湫體前的淤積和「水力沖技術的探索和研究,創立了淤地體自然加高的理論,並提出了具體的導流方式、體防沖措施及圍堰消能蓄洪、留淤脫水設計。
  8. It has accumulated much experience in the choice of earth rockfill dam ' s material, division of dam ' s body, stabilization of dam, seepage, settlement, analysis of stress and strain, treatment of foundation, criterion of reclamation and machine of construction and so on

    在土石材料,體分區,體穩定,滲流,沉降及應力應變分析,基礎處理,標準,施工機具等一系列關鍵技術上,已經積累了豐富的經驗。
  9. Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction

    採用非線性靜、動力有限元分析程序對圍的4個典型剖面進行了靜、動力模擬模擬,模擬計算了體自至蓄水運行和發生7地震各階段體及基的變形以及應力分佈,地震應力響應和地震引起的超靜振動孔隙水壓力分佈以及永久變形。判斷了體和基中出現裂縫、塑性區以及地震液化的可能性。
  10. Trial production blasts of the rock filling materials for shuibuya concrete face rockfill dam

    水布埡混凝土面板堆石料開采爆破試驗
  11. ( 2 ) combined with engineering practice of shuicheng reservoir, and use the value engineering technology to analyze the technological and economical benefit of the mining technology of its rock - fill material. this is the first time the value engineering was used in the construction of the medium - sized hydraulic engineering in yunnan province, and has gained great success

    ( 2 )結合水城水庫工程實踐,用價值工程技術經濟分析方法對水四川大學工程碩十學位論文城水庫大堆石料開采工藝進行價值分析,這在雲南省的中型水利工程施工中是有首次,並且取得了巨大成功。
  12. Extruded concrete curb technology was introduced in 20th congress icold held in beijing in year 2000, this method draw more attention for its improving the compaction of transition material, excellent performance of slope protection, and convenient construction. this extruded concrete curb technology was developed in ita dam construction in brazil, the ita method consists of building and extruded concrete curb by using an extruding machine before the construction of a layer of the transition material, then spread and level the transition material in layers inside the curb, and compact the layer by vib ' ratory roller horizontally

    巴西工程界在埃塔( ita )面板堆石建設中,借鑒道路園林工程中道沿機的擠壓滑模原理,創造性使用邊墻施工法,在每一層墊層料之前,用擠壓式邊墻機製作出一個半透水混凝土小墻,然後在其內側按設計鋪料,用振動碾平面碾壓,合格后重復以上工序。
  13. Thirdly, because the depth of the seepage prevention wall of xia ban di dam project has the value of 85m which is the maximum depth in the dam projects in our country, the stress state of the seepage prevention wall is very complicated, the influence of nine modulus for nine kinds of seepage prevention wall material on the stress and displacement of the seepage prevention wall is studied and the rule of the change of stress and displacement with the change of characteristic parameters for seepage prevention wall under time of engineering completion and water impounding operation period is given in this paper

    第三,鑒于大基礎混凝土防滲墻深度達85m ,厚度僅為1 . 0m ,防滲規模和工程難度為國內之最,墻體應力比較復雜,本文研究了大施工竣工期、水庫蓄水運行期防滲墻的應力和變形隨墻體參數的變化而變化的規律,為大安全設計及防滲墻墻體材料的選擇提供了理論依據。
  14. So far as the mixing material for building the earth - rock fill dam with clay core for shiquanhe hydropower station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of ( 46 ~ 54 ) : ( 54 ~ 46 ) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core

    摘要由於獅泉河水電站粘土心墻土石摻合料的最大幹密度受反濾料與粘土料的摻合比例、反濾料含砂率的影響較大,因此擬通過本試驗確定摻合質量比在( 46 ~ 54 ) : ( 54 ~ 46 )范圍變化時,反濾料含砂量變化對最大幹密度的影響程度及相關參數,從而確定心墻摻合料的實際壓實度。
  15. May, 1997, weihai jinfeng real estate company of huaneng comprehensive industrial co. shandong branch began to fill out the sea and build the dam in barren beach and wild mountain range in the east of bathing beach, and fire the first battle of building golden bay hotel

    金海灣大事記1997年5月,華能綜合產業山東公司下屬威海金峰房地產公司在威海國際海水浴場東側荒灘野嶺之地上,開始,打響了建設金海灣國際飯店的第一仗。
  16. Embankment technology for concrete faced rockfill dam of upper reservoir of bailianhe pumped - storage power station

    白蓮河抽水蓄能電站上庫面板堆石技術
  17. Construction division and stage division scheme for embankment of concrete faced rockfill dam of bailianhe pumped - storage power station

    白蓮河電站面板堆石分區分期方案分析
  18. The static loads were placed step by step in time sequence in order to simulate the construction conditions of the dam during the calculation. the results of the analysis show that excess pore water pressure would not appear in the design section during the analysis results that the dam was statically stable and the construction process was reasonable

    在靜力分析過程中採用在時域上逐步加載的方法,模擬了體的施工過程,計算結果表明,設計斷面在貯灰過程中不會產生很高的超靜孔壓,體靜力穩定狀態較好,施工進度合理。
  19. The surface deformation monitoring of the side - wall by combination of the forward intersection method with the analytical trigonometric elevation measurement demonstrates that the plane deformation and vertical deformation of the side - wall are small, and the quality of dam filling and side - wall construction is satisfactory

    用能夠滿足精度要求的前方交會法與解析三角高程測量法結合的方法對邊墻表面變形進行監測,結果表明,邊墻平面位移和垂直位移均較小,大和邊墻施工質量可靠。
  20. The gravelly soil is a better kind of damming material. it ' s usually used as impervious core and also as dam shell

    礫質上是一種良好的材料,既能作防滲材料,又能填築壩殼。
分享友人