墻模板 的英文怎麼說
中文拼音 [móbǎn]
墻模板
英文
wall form-
An acclimatised britisher he had seen that summer eve from the footplate of an engine cab of the loop line railway company while the rain refrained from falling glimpses, as it were, through the windows of loveful households in dublin city and urban district of scenes truly rural of happiness of the better land with dockrell s wallpaper at one and ninepence a dozen, innocent british born bairns lisping prayers to the sacred infant, youthful scholars grappling with their pensums, model young ladies playing on the pianoforte or anon all with fervour reciting the family rosary round the crackling yulelog while in the boreens and green lanes the colleens with their swains strolled what times the strains of the organtoned melodeon britannia metalbound with four acting stops and twelvefold bellows, a sacrifice, greatest bargain ever.
那個夏天的傍晚,當雨住了的時候,他站在環行線鐵道公司機豐駕駛室的踏板上,隔著都柏林市內和郊區那些恩愛之家的窗戶,瞥見幸福的地地道道牧歌式的鄉間生活,墻上糊的是由多克雷爾120店裡買來的每打一先令九便士的墻紙。這里,在英國出生的天真爛漫的娃娃們,口不清地對聖嬰作著禱告年輕學子們拼死拼活地用著功模範的淑女們彈著鋼琴,或圍著噼噼啪啪燃燒著的那截聖誕夜圓木,闔家念誦玫瑰經。Considering the special structure of multi - ribbed slab, founding diphase body mechanical model of compound material, strengthening rib beam and rib pillar by equivalent volume ratio of concrete and slice brick, the paper drew elastic compution constant and shear constant. based on the things, the paper simplified isotropy compution model to wall, gave practical design formula of elastic mold and shear mold, provided necessary parameter for practical design formula of elastic rigidity. finally the calculating results agree well with the text results
結合密肋復合墻板的特殊構造,建立墻板的復合材料二相體力學模型,按照混凝土與砌塊體積比不變原則對肋梁肋柱同時加強,得出墻板的彈性計算常數及剪切常數,在此基礎上,進一步將墻板簡化為各向同性的計算模型,給出墻板彈性模量及剪切模量實用計算公式,為密肋復合墻板的實用彈性剛度計算公式提供必要的參數。Reduce the use of timber by using alternative structural solutions ( e. g. metal hoarding, system form - work, metal form - work, semi - pre - cast flooring system, pre - cast roofing, dry walls and other structural means such as steel structural section, left - in formwork, etc. )
改用其他結構方案(例如金屬圍板、標準化模板、金屬模板、半預制樓板系統、預制天面、干墻及其他結構措施,如鋼造結構架和內留的模板等) ,藉此減少使用木材Tom partly uncovered a dismal caricature of a house with two gable ends to it and a corkscrew of smoke issuing from the chimney
湯姆略微挪開左手,石板上畫的是座房子,畫得既不好又模模糊糊,兩個山墻頭,還有一縷炊煙從煙囪里裊裊升起。Based on the numerical simulation and accuracy analysis to previous slab ' s test with the ansys program, the study of composite wall, with various detail design under potential load action respectively or jointly is carried on and the wall ' s atress behavior and failure mode is obtained, also the influence to wall ' s stiffness and bearing capacity by kinds of factors, including wall ' s shear span ratio, member ' s section, bar arrangement, etc. based on the hammer blow test and stiffness test, a 1 / 3 scale ten - bay model ' s modality parameter and elastic deformation characteristic is analyzed
在對密肋復合墻板運用ansys ~ ( ( ? ) )程序進行數值模擬、分析驗證的基礎上,對典型組合墻體在不同連接構造和不同荷載效應組合作用下的受力形態和破壞模式進行研究;計算分析了復合墻體剪跨比、邊框柱截面尺寸、邊框柱配筋大小以及墻板內肋梁肋柱配筋等諸多因素對密肋復合墻體承載力及剛度的影響,得出其變化規律。In order to solve the problem of engineering roadblock of abnormity wall template design, program alternatives, construction techniques and engineering roadblock, this paper discusses the difficulty of hyperbola template construction on the innovation of traditional simple curve zoom type huge template by combining the three dimensional space hyperbola rinse concrete wall in art performance theater of qingdao art center project construction, provides a method to design and choose heteromorphy component template
摘要為了解決異形墻體模板設計、方案選擇及施工工藝等技術難題,筆者結合青島市藝術中心工程藝術表演劇場三維空間雙曲線清水砼墻施工,在傳統的單曲線可調式大模板的基礎上進行了創新,很好的解決了雙曲線模板施工的技術難點,為異型構件模板的設計、選擇開拓了又一條思路。Design and construction of space hyperbola rinse concrete wall
空間雙曲線清水混凝土墻模板設計與施工The grey walls were divided into artificial paneling by strips of white-enameled pine.
灰色的墻壁用漆白的松木條隔成鑲板的模樣。Based on tests of nine 1 / 2 - scaled model slabs under vertical loads, the paper analyzed load - deformation curve and proposed limit value of height - width ratio under axial loads. 2. based on aseismic tests, the paper put forward a model of concrete frame, silica brick and a combination of the two, proposed that the silica brick works as a 45 compression bar, analyzed the factors which may influence bearing capacity of the slab and advised a formula including the numbers of bays and of storeys of the frame
通過對墻板模型的抗震性能試驗研究,建立了由鋼筋混凝土框格、砌塊以及兩者協同作用三個部分組成的承載力極限狀態下的理論簡化計算模型;提出了墻板中填充塊等效斜壓桿寬度按45度計算的統一量化標準;分析了影響墻板承載力的主要影響因素,給出了表達墻板框格層數和跨數不同的斜截面承載力實用設計計算公式。By changing the ratio of raw materials and template, we obtained macroporous sio2 materials with different diameters of porosity. when template content ( weight ratio ) is ca. 30 %, sem images showed that pore sizes were in the range of 160nm - 500nm with isolate porosities ; when template content ( weight ratio ) is 50 % - 60 %, pore sizes were in the range of 0
通過掃描電鏡觀察,孔徑范圍基本在大孔范圍:當模板劑含量(重量比)為總量的30時,得到具有孤立的孔道結構,孔道間相互交叉較少,孔徑大小在160nm - 500nm之間,平均墻厚度為600nm的大孔材料;當模板劑含量為50 - 60時,得到孔徑大小在5 . 5 m 6 . 2 m之間,平均墻厚度為2 m ,具有交叉孔道結構的大孔材料。The construction techniques for as - cast - finish concrete wall of units no. 15 - no. 18 in right bank powerhouse of three - gorges project was introduced, including measurement mark testing, sheathing board construction, steel bar construction, concrete pouring, and so on
摘要從測量標識測設、模板施工、鋼筋施工、混凝土澆築等幾個方面介紹了三峽右岸電站廠房15 ~ 18號機組主廠房墻體清水混凝土墻施工技術。By adoption of a series of construction techniques, such as doka sheathing board pasted with finland board, affixing double - sided gum at the bottom of the sheathing board, controlling depot exterior with angle steel, and mending fissures with epoxy resin putty, the quality of as - cast - finish concrete can meet the requirement of construction anti good technical effect can be achieved
通過採取多卡模板外貼芬蘭板、模板底口粘貼雙面膠、角鋼控制收倉面、環氧樹脂膩子補縫等一系列的施工技術工藝,使清水混凝土墻施工達到預期質量要求和工藝效果,滿足了設計要求。It is show that non - demoulding shear wall in which the cold - draw steel wire is taken as reinforcement has great capacity of resisting seismic and quality in the area of seismic
試驗及分析表明:免拆模板剪力墻墻片單元在墻片單元之中使用冷拔鋼絲網片作為配筋時具有良好的抗震性能,可以滿足地震區的設計要求。The structure system of non - demoulding formwork board and shear wall are a new type structure resisting seismic. the development of which is to acquire a construct system instead of tradition brick masonries
免拆模板及其剪力墻體系是一種節能的新型抗震結構體系,它的提出旨在找到一種替代傳統的磚混結構的建築體系。Erection of footing formwork for retaining wall no. 45 at cheung sha
于長沙豎設擋土墻編號45的基腳模板The main work done in this paper is as follows : ( 1 ) simulate the temperature field of basement wall by ansys software, sum up the characteristics of the temperature field of basement wall, and analyze the influence of the types of the molding board, environmental change and cement content ; ( 2 ) the whole simulation analysis process of early - age concrete stress field is realized by sub - development of ansys, and cts - ansys software is developed with fortran ; ( 3 ) based on the cause of cracking, the influence of the thickness of the wall, length, bar arrangement, mix proportion, expanding agent, etc, on the wall stress due to concrete creep and temperature change is analyzed
本文主要進行了以下幾個方面的研究: ( 1 )利用ansys軟體,模擬了施工期地下室側墻溫度場,總結了地下室側墻溫度場分佈的特點,分析了模板類型、環境變化和水泥用量等對墻體溫度場的影響; ( 2 )以大型通用有限元軟體ansys為平臺進行二次開發,運用visualfortran語言編寫了cts - ansys程序,實現了施工期混凝土徐變溫度應力的模擬計算; ( 3 )從裂縫形成的原因出發,分析了地下室側墻厚度、長度、配筋率、配合比、膨脹劑等因素對墻體徐變溫度應力的影響。For example, a drywall partition system was used instead of the conventional brick construction and leave - in metal formwork used for the concreting of floor slab
此項目大量應用低廢料量技術,包括採用乾墻間隔系統取代傳統磚墻結構,地臺灌漿亦使用了內留模板。Spatial bar element with shear deformation taking into consideration is used to simulate column and beam members, and spatial wall elements is used to simulate shear wall
Fswas系統的結構分析模塊採用了考慮剪切變形的空間梁單元和空間墻單元兩種基本單元來分別模擬梁、柱構件和剪力墻、樓板。Wall form installation please see attached sketch no. - 4. expended cement mortar shall be used for sealing after form dismantled and pull bolts removed
墻板模板安裝見附圖4 。在模板拆除對拉螺栓拿出后,採用微膨脹水泥砂漿封堵。The design and construction on the formwork of the arc external wall of the chinese century altar basement
中華世紀壇地下室弧形外墻模板設計與施工分享友人