墻體工程 的英文怎麼說
中文拼音 [tǐgōngchéng]
墻體工程
英文
walling work-
By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper
本文結合常州新閘防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。In order to solve the problem of engineering roadblock of abnormity wall template design, program alternatives, construction techniques and engineering roadblock, this paper discusses the difficulty of hyperbola template construction on the innovation of traditional simple curve zoom type huge template by combining the three dimensional space hyperbola rinse concrete wall in art performance theater of qingdao art center project construction, provides a method to design and choose heteromorphy component template
摘要為了解決異形墻體模板設計、方案選擇及施工工藝等技術難題,筆者結合青島市藝術中心工程藝術表演劇場三維空間雙曲線清水砼墻施工,在傳統的單曲線可調式大模板的基礎上進行了創新,很好的解決了雙曲線模板施工的技術難點,為異型構件模板的設計、選擇開拓了又一條思路。Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years
建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。The epoxy resin floor can be divided into skidproof and anti - static, etc. tiffany is equipped with a strong force of professionals, experienced engineers and workers as well as advanced production facilities. it is mainly engaged in the processing of anti - static, erosion - proof, skidproof, high - strength floors and water - proof surfaces. tiffany s aim is " advanced technology, high - quality products and best service "
公司擁有一批高素質的專業人才和一支富有實際經驗的施工隊伍,設備先進,主要承接電子電器、精密機械儀器、食品、符合gmp標準的醫藥等行業的防靜電、防腐、防滑、高強度地面處理和墻體處理工程。" prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting
「預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排樁兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排樁多錨支護,只是由肋梁代替了開挖前施工的排樁從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊坡工程中成功應用。On the basis of the characteristic of the industry waste slag, which is high added to the hsfab, different kinds of catalyzing methods are adopted to make the waste residue more active. the additive f, developed by the author can obviously improve the mechanics characteristic and durability of hsfab, especially the restraining of the drying shrinkage. based on the study of technics parameters and the problems in the manufacture, hf - 1100 series full - automatic hydraulic pressure wall brick presses is chosed to solve the problems, such as low molding pressure, low efficiency and the certified product ration
在hsfab的研究方面,通過兩種體系hsfab (即「水泥?鋼渣?粉煤灰?爐渣」和「石灰?鋼渣?粉煤灰?爐渣」體系)的配方優化設計,使之具有良好的社會、經濟和環境效益;在高摻量工業廢渣的前提下,根據各種原料的特性,對其採用不同的活化技術,使其具有較高的活性;自研的外加劑f ,對hsfab製品的物理力學性能和耐久性能均有明顯的改善作用,尤其是對製品的乾燥收縮性能有顯著的抑制作用;通過對工藝參數的研究,結合實際生產普遍存在的問題,選取了hf - 1100系列全自動液壓墻體磚壓機,有效地解決了傳統制磚過程中常見的成型壓力低、生產效率低、產品合格率低(即「三低」現象)等問題。This paper related to a practical project that a high school is big bay building with teaching, experiment and studying, aim at the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), and the building loading much ( the building " self - weight is over the 9. 0 kn / m2 ). compared to r. c. rectangle columns, studying the aseismic performance of the r. c. special - shaped columns pure frame structure, the r. c. special - shaped columns frame - truss structure and the r. c. special - shaped columns frame - shear wall structure
本文,結合某中學大開間教學實驗綜合樓的具體工程,就抗震設防烈度較高地區( 8度)和抗震不利的建築場地(類場地) ,並且建築物所受荷載較大的情況(建築物自重超過9 . 0kn m ~ 2 ) ,通過與矩形柱分析比較的方式,研究了異型柱純框架結構、異型柱框架-桁架結構,以及異型柱框架-剪力墻結構的抗震性能。Prestressed cable truss has some characters of transparency, safety, simplicity, dexterity, and beauty. due to these peculiarities there is a splendid prospect when the structure is used in the glass curtain. therefore, it is becoming warm and important problems to study its structural components and behaviors
預應力索桁支承體系具有通透、安全、靈活、工藝感強以及環保節能等諸多特點,決定了該體系在點式玻璃幕墻中具有廣闊的應用前景,因此,對其受力性能進行研究,日益成為結構工程學科研究的重要方向和熱點問題。This paper analyzed the features of the curtain wall structure and the needs of cae for construction curtain wall structure analysis. based on the studies on the cae system for curtain wall structure analysis and its core technologies, a professional cae software special for the construction curtain wall structure analysis is developed
本文從建築幕墻結構特點出發,圍繞建築幕墻結構計算機輔助工程分析需求,對建築幕墻結構計算機輔助工程分析系統及其關鍵實現技術作了較為深入的研究,並開發了適合建築幕墻結構分析的專用輔助工程分析軟體。Based on cae system for construction curtain wall structure analysis, it presented a kind of parametric design language w - spdl and the architecture of its processor especially for construction curtain wall structure analysis, which can greatly enhance compound features of the system. it is also helpful to further developing for the system, batch commands processing, parametric design of structure analysis and simplifying the operation flows
基於建築幕墻結構計算機輔助工程分析系統,建立了一套適合建築幕墻結構分析的參數化設計語言w - spdl ,並提出了一種開放性w - spdl宏處理器體系結構,提高了系統綜合性能,並為基於系統進行二次開發、批命令處理、結構分析參數化設計以及簡化用戶操作流程等提供了支持。First, based on the analysis of the cae software available and cae needs for construction curtain wall structure analysis, this paper put forward a 4 - layer software architecture blue print for curtain wall structure analysis cae system with autocad as the graphics - processing platform
本文首先在分析了國內外同類軟體發展現狀的基礎上,針對建築幕墻結構特點及其計算機輔助工程分析需求,基於autocad圖形處理平臺,提出了一種四層體系結構的建築幕墻結構計算機輔助工程分析系統總體方案。Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed
本文緊密結合溪洛渡水電工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開挖順序對大型地下洞室群圍巖穩定性的影響。As a whole, the research work of this dissertation can be summarized follows : 1. in accordance with my design patent, namely, reinforced earth retaining wall of r c net, and based on the analysis of the work mechanism, failure pattern, bearing capacity and stability of the reinforced earth, a new concept is expounded, namely, the reinforced earth wall which is thought of as a compound structure increase not only c but also ~ in comparison with non - reinforced earth. some bearing capacity formula are first introduced under the circumstances that the reinforced earth wall fails because of the breakage of material or inadequate cohesion between reinforcements and soil
歸納起來,具體的研究和所獲得的一些重要成果如下: 1 、結合本人的設計專利? 「鋼筋混凝土網格式加筋擋墻」及工程實踐,在對加筋土的加筋機理、破壞模式、承載力和穩定性等方面進行深入分析的基礎上,提出了一個新概念,即經過加筋后的土體作為復合結構與原土體相比,不僅提高了內聚力,而且也提高內摩擦角;並在此前提下首次導出拉力破壞和粘著破壞兩種情形下的承載力公式,然後進行了穩定性分析。Hada mountain embankment dam is located at strong motion earthquake area with 7 degree. it is a sand - fill dam with clay core, stability of the dam under earthquake and the preventive of foundation liquescence is very important for the dam design
哈達山土壩是位於七度地震區,坐落在厚覆蓋層上的粘土心墻砂殼壩,壩體的抗震穩定、基礎的抗震液化是本工程的技術關鍵問題。Model sywly - 75 physics high to foam polyethylene insulating, aluminum pipe other conductor coaxial cable suitable for catv backbone project, its interior conductor adopt bastion of iron make aluminium, other conductor adopt aluminum pipe, the two have the same hot coefficient of expansion and modulus of elasticity, woods reduce in cable conductor draw the troubles that are led to the fact
Sywly - 75型物理高發泡聚乙烯絕緣、鋁管外導體同軸電纜適用於catv主幹線工程,其內導體採用銅墻鐵壁包鋁,外導體採用鋁管,兩者具有相同的熱膨脹系數和彈性模數,林減少了由電纜內導體拉拔所造成的故障。Used for construction, such as drilling salls, pipe installation, processing hole of air - conditioned and pc hole of stone slab
主要用於建築工程,如墻體,樓板中的空調孔,進排水管孔,排氣孔等。The pre - stressed anchor supporting structure with beam and column is analyzed theoretical in this paper, combined with theoretical study and design of such supporting structure, which is one of the plan projects of construction science and technology in hunan province. the topic provides engineering aiming with practical and concise computation method, and also provides the advice for structure with proper theory foundation and schemes to some extent
本文結合湖南省建設科技計劃項目「永久性肋樑柱錨桿擋土墻設計關鍵問題及計算軟體開發」 ,對預應力肋樑柱錨桿支擋結構進行了理論分析,提供了適合於工程的、比較簡捷的實用計算方法,同時也為該類支擋結構設計提供一定的理論依據和設計建議。Discussion of the crack in the wall of ben jiaji second lifting water hinge construction
賁家集提水二站樞紐工程墻體裂縫探討Kiln guiding - rail bricks, supporting suspension bricks and ultra - thin extruded batts are recently developed for the phenomenon of pollution and pulverization caused by using insulation bricks or high - temperature refractory wool in the kilns. they are made from cordierite and mullite with a high strength. they can cover the kiln wall structure made of refractory fiber, greatly reduce pollution and pulverization, remarkably save the energy, easy to be constructed on worksite, and the aspect is beautiful and novel. they are ideal material for large - scale shuttle - kiln or computerized puadrate kiln
窯體道軌磚及支撐吊磚和超薄中空板是針對目前窯爐採用傳統耐火材料在使用過程中由於組多原因造成落臟或粉化現象而開發生產;它是堇青石-莫來石材料製造而成,強度大,熱穩定性佳、覆蓋耐火纖維製品組成窯爐墻體結構,它能大大減輕落臟與粉化現象,節能效果十分明顯、施工方便、整體美觀新超是高級大型梭式或電腦方窯等窯爐的理想材料。During this period, the company accepted the internal and external decorating projects for yantai civil aviation building, the glass curtain wall project for the building of bank of china in jinan ( it lies in the most flourishing commercial area. it is a 25 - story building with a height of about 100 meters. the project costs about 10 million rmb ), the external vertical decorating project for jinan real estate building ( the project is a key construction project in jinan city
2000年至今公司在總體規模、施工能力及管理水平上再上新臺階,在此期間,公司憑實力先後承接了煙臺民航大廈內外裝工程、濟南市中銀大廈玻璃幕墻工程(該工程位於濟南市最繁華商業區,共25層,高度約100米,專項造價約1000萬元) 、濟南市房產大廈外立面裝飾工程(該工程為濟南市政府重點建設項目,共26層,高度約150米,專項造價約1300萬元,公司為此動用了同濟大學專家設計力量及國內一流的施工隊伍) 、人民銀行濟南分行金庫單元幕墻窗工程等。分享友人