壩 的英文怎麼說
中文拼音 [bà]
壩
英文
名詞1. (攔水建築物) dam2. (固堤建築物) dyke; embankment 3. [方言] (沙灘; 沙洲) sandbar; sandbank4. (平地或平原, 多用於地名) flatland; plain -
Basin evolution and hydrocarbon potential in songpan - aba area
阿壩地區盆地演化及油氣遠景Journal of aba teachers college
阿壩師范高等專科學校學報The study includes the hole color tv imagery system for drill hole, even - pole bore - hole acoustic system and acoustic meter, bore - hole multi - point consolidation apparatus, the quick camera computer - aid image for high rocky slope, image technology for layer analysis, safety monitoring technology for the section close to the dam, software for processing and forecasting the slope monitoring data, high precision geodesy monitoring automation system, etc. all the study results are new, advanced and practical, which has applied in the project and gained the obvious benefits
鉆孔彩色電視孔壁成像系統、直接橫波測井研究偶極子井下聲系和聲波儀、鉆孔多點滲壓儀及壓模系統、巖質高邊坡快速攝像微機地質素描成圖、層析成像技術、近壩庫段安全監測技術、邊坡監測數據處理預報軟體研究、高精度大地測量監測自動化系統等項目,研究成果內容新、先進、實用,已在工程中應用,效益顯著。After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification
本文採用水利水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。After the first flood, we planted 300 olive and almond trees behind each dam.
第一次洪水之後,我們在每個水壩後面補種了300棵橄欖樹和巴日杏樹。It only took 38 months from construction preparation at the end of october, 2001 to the first unit operating on december 20, 2004, which antedated the construction time limit by 7 months
樂灘電站從2001年10月底開始施工準備到2004年12月20日首臺機組投產發電,僅用38個月的時間,比合理工期提前了7個月,並在此期間,搶回因廠壩部份地基巖溶地質問題延誤的5個月工期。Archaeology research of salt industry at zhongba ruins
中壩遺址的鹽業考古研究Through the ree charactheristics being studied, it suggests that the xenoliths from hannuoba, ximeng, and puning area have no the trend of lree enrichment, which ratios of lree / hree approximate 1. therefore, it is not different from archean lithospheric mantle
稀土元素地球化學研究表明,漢諾壩、錫盟、普寧等地區包體則無lree富集的趨勢, lree hree接近於1 ,因此它們與太古代巖石圈地幔不同,稀土元素特徵表明它們遭受了強烈虧損。The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage
錦屏一級電站位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。Study and application of plate dam for meeting argent water retaining
板壩式應急擋水子堤方案的研究與應用The author holds that, in order to achieve a hypernormal and longspan development of aba prefecture, several tactics and thoughts should be set tip : the thought of the common development of all the nationalities ; the diversified development in the form of the combination of self - exertion and state support the combination of conventional development aril unconventional development ; the establishment, of the sense of reformation and opening ; the reinforcement of national unity and mutual aid ; the realization of common prosperity in the courses of reform
摘要阿壩州要超常規大跨度發展,筆者認為要特別注意樹立幾個策略思想;各民族共同發展思想;自我努力和國家扶持相結合多樣化友展;常規發展和非常規發展相結合;要樹立改革開放意識,更新觀念,增強民族團結互助在改革中實現共同繁榮。After like near future arrowroot continent dam flies a shop sign afresh go situation and to the limit of one ' s capacity rises should notice early days goes situation, if be pulled considerably, magnify again quantity, be about vigilance is banker shipment ( this time may be a few longer, banker is sucked prepare time to grow more, shipment time is long ), island visitting extensive region goes situation ( be about in first time to the limit of one ' s capacity first shipment ) if early days is to pass dish of full share, ( at present the individual thinks to have treasure new the sources of energy ) in the to the limit of one ' s capacity when breaking through strong line or resistance line but follow - up, that ability is really true the quantity adds valence to rise dropping is not must to the limit of one ' s capacity, and shrink the volume drops consequence is more serious, because early days banker already gave money, basically be, use odd amount to be bungled again dish, medicinal powder door meet disastrous
如近期葛洲壩重新開牌后的走勢而放量上升要注重前期走勢,假如大幅拉升后再放大量,就要警惕是莊家出貨(這個時間可能比較長一些,莊家吸籌時間越長,出貨時間就長) ,看看寰島走勢(在第一次放量就要先出貨了)假如前期是經過盤整的股票, (目前個人認為有寶新能源)在突破勁線或阻力線時放量就可跟進,那才是真真正正的量增價升下跌不是一定要放量,而縮量下跌後果更嚴重,主要是因為前期莊家已出完貨,利用剩餘數量再砸一下盤,散戶就會損失慘重!Stress analysis of the rock fill dam with asphaltic concrete core wall
冶勒堆石壩瀝青混凝土心墻型式及尺寸研究The old aswan dam was a barrage.
老的阿斯旺壩是一個攔河閘。Work began on the aswan dam in nineteen sixty
阿斯旺大壩的建築工作從20世紀六十年代開始。The aswan dam helps to control the river nile in egypt
阿斯旺水壩有助於控制埃及的尼羅河水。Egypt ' s leadership in the arab was cemented by the aswan high dam
阿斯旺大壩鞏固了埃及在阿拉伯世界的領袖地位。Aswan high dam, egypt
印度阿斯旺水壩Aswan high dam egypt
印度阿斯旺水壩Study on influences of asymmetry on arch dam foundation
拱壩基礎不對稱性影響研究分享友人