尾礦場 的英文怎麼說
中文拼音 [wěikuàngchǎng]
尾礦場
英文
tail house-
Surveying of geological sections of tailings dams and its effect on seepage field calculation
尾礦壩地質剖面概化及其對滲流場計算的影響Article 33 whoever stores in open air metallurgical slag, residue of chemical industry, cinder of burned coal, ettle, ore tailings or other industrial solid waste shall build special installations and sites for the purpose
第三十三條露天貯存冶煉渣、化工渣、燃煤灰渣、廢礦石、尾礦和其他工業固體廢物的,應當設置專用的貯存設施、場所。Unsteady seepage analysis of tailings dams considering coupling of stress and seepage fields
考慮應力場與滲流場耦合的尾礦壩非穩定滲流分析Thebasic evaluation process, method and stages involved in the structure of environment riskevaluation of tailingdam type of stacking area were introduced. a concrete method forenvironment risk evaluation of phosphogypsum stacking area was introduced by a example. areference and a comparison were offered to the environment risk evaluation of largeandmedium scale of chemical industry waste stacking area by the method
對尾礦壩類渣場的環境風險評價框架結構中涉及的各個階段及基本評價過程與方法作了簡要的介紹,並通過實例介紹如何進行磷石膏渣場的環境風險評價工作,具有典型性和參照性,可作為國內大中型化工廢物渣場環境風險評價的參照和類比。Seepage field, seepage deformation and seepage control measures of hydraulic engineering, ground water resources, and irrigation and drainage
水工建築物、尾礦壩及灰壩的滲流場、滲透變形和滲控措施,地下水資源開發評估,農田水利,堤壩安全監測。In view of the problems of the environment pollution and land occupization by the deposition of large quantities of tailings on the ground and in combination with the development orientation of national and international mining and the market demand, the underground mining techndogy research in the direction of non - waste is proposed so as to finally realize the coordinated development of mine resource development and environment protection
針對國內大量尾砂堆置地面污染環境、佔用土地等問題,結合國內外采礦發展方向和市場需求,提出了地下礦山無廢料開采技術的研究方向,最終實現礦山資源開發與環境保護協同發展。Study on the comprehensive technology of presupporting of roof and walls in tailings back - fill mining
尾砂充填采礦法采場預控頂護幫綜合技術研究For the complex topographical tailings dam, neither the complicated and changeable seepage field nor the action of three direction seepage factors at the same time can be fully reflected in the two - dimension model ; as a result the real seepage field cannot be acquired
摘要對于復雜地形的尾礦壩,由於二維模型不能充分反映復雜多變的滲流域,也不能考慮到三個方向滲流因素同時作用的影響,從而無法體現真正的滲流場。Numerical analysis of seepage field in mijiangou tailings dam to be designed to increase the dam height
米箭溝尾礦壩加高方案滲流場數值分析分享友人