岸上設備 的英文怎麼說
中文拼音 [ànshàngshèbèi]
岸上設備
英文
onshore facilities- 岸 : Ⅰ名詞(水邊的陸地) bank; shore; coast Ⅱ形容詞[書面語] (態度嚴峻或高傲) lofty
- 上 : 上名詞[語言學] (指上聲) falling-rising tone
- 設 : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
- 備 : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
- 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
-
By hydraulic modeling, this paper describes studies on the stability of a floating bulkhead operating in standing water and flowing water, and it ' s hydrodynamic stability characteristics that distinguish in standing water from in flowing water ; and direct measurements of the forces acting on the model floating body during floating and sinking is taken. as a result, the rotation stress curves are produced and analyzed ; to provide data for optimum operation schedule analyses of the sluice, the relationship of the impact forces acting on the side wall of the gate and the running speed is studied ; the reasons of unstably uplifting of the bulkhead are discussed and the method to solve the problem is also given in this paper
本文結合常州新閘防洪控制工程水工模型試驗,系統分析了浮箱門在靜水和動水中的穩定性及其影響因素,指出靜水穩性和動水穩性的不同特點;試驗測定了浮箱門動水運行時的受力情況,給出並分析了定位過程轉動力的變化過程曲線;根據浮箱門啟閉速度與門體和岸墻之間撞擊力大小的關系,選擇合理的動力設備,為設計和工程實踐提供可靠依據;分析浮箱門難以穩定上浮的原因,並給出解決方案。En 1473 installation and equipment for liquefied natural gas. design of onshore installations
液化天然氣裝置和設備.岸上裝置的設計At cheung sha upper beach, hong kong s longest stretch of white sand, are changing facilities, toilets and a refreshment kiosk, while overlooking the lower beach is the stoep, a mediterranean and south african restaurant popular for barbecues
再沿海岸向西走,幾公裡外,還有另外兩個沙白如珍珠的海灘-長沙上灘及長沙下灘。兩個海灘都有更衣室洗手間及小食店的設備,也有供應燒烤野餐的餐廳。Coast guard says they found fishing equipment on the chinese boat, along with fish that had just been caught
海岸警衛隊說,他們在中國漁船上發現了捕魚設備和剛剛捕獲的魚。Yiulian dockyards, founded in 1989, is situated at the west port of shenzhen, 20 nautical miles away from hong kong. thanks to the very special and ideal position, shekou yiulian can get abundant supplies of skilled and semi - skilled labour and have an easy access to spare parts and materials from hong kong and other places. the company covers a working area of more than 700, 000 sqm
公司位於深圳西部港區,距離香港20海里,地理環境優越,目前擁有長達651米的碼頭岸線, 7萬噸級和3萬噸級浮船塢各一座,配備交通船、拖輪、門吊、海上浮吊和各類齊全的生產設施,是中國十大修船廠之一,也是華南地區最大和最好的修船廠之一。2 notwithstanding clause 2. 1 above the gear and equipment, including outboard motors, are covered subject to the provisions of this insurance while in place of storage or repair ashore
盡管有上述第2條第1款的規定,當船舶在岸上的倉庫或修理地點時,對設備及船具的保險,包括船外馬達,都可依據本保險的規定承保。Prohibition of container loading unloading by shore - based equipment clause
禁止以岸上設備裝卸貨櫃條款The mrcc is manned 24 hours a day by professional staff and is equipped with comprehensive communication equipment and a shore - based global maritime distress and safety system. it co - ordinates search and rescue operations in conjunction with other government departments and international ships on the high seas
該中心每天24小時均有專業人員駐守,配備完善的通訊設備和岸上全球海上遇險和安全系統,協調其他政府部門和公海上的國際船舶進行搜救行動。The mrcc is manned 24 hours a day by professional staff and is equipped with comprehensive communication equipment and a shore - based global maritime distress and safety system. it coordinates search and rescue operations in conjunction with other government departments and international ships on the high seas
該中心每天24小時均有專業人員駐守,配備完善的通訊設備,以及岸上全球海上遇險和安全系統,聯同其他政府部門和公海上各國船舶協調搜救行動。John whiteside, author of the phoenix agenda, describes an important project at digital equipment corporation that required collaboration between engineers from the company s west coast laboratories and east coast production group
John whiteside , phoenix agenda的作者,在數位設備會議上描述了一個重要的專案,該專案需要公司西海岸實驗室與東海岸生產部門的工程師之間的共同合作。In this dissertation, based on the maintenance mode of cosco container lines, the author retrospect the development of technical manage, analyzes the management mode, maintenance system and cost control system of coscon by comparing with the latest development in the world, and absorbing its experience. the author argues the following steps to optimize the technical management of coscon fleet : project the management base center ; introduce the index of standard and performance ; detail the cost estimation ; evaluate the performance of major equipment ; adopt the computer system and strategic outlook
在此基礎上,作者從以下幾個角度對中遠集運船舶機務管理模式進行了優化: 1 、架構出以岸基為中心的中遠集運船隊機務管理新模型; 2 、創立了設備管理標準和設備工況指數; 3 、細化了設備維護費用的測算方法; 4 、提出了設備維護重要工程的效能評估方案; 5 、提出了船舶維修保養體系改進思路; 6 、強調了船岸通信系統建設和計算機應用; 7 、進行了機務管理問題的戰略思考。Installations and equipment for liquefied natural gas - design of onshore installations with a storage capacity between 5 t and 200 t ; german version en 13645 : 2001
液態天然氣裝置和設備.儲存容量為5噸至200噸的岸上裝分享友人