岸基處理 的英文怎麼說

中文拼音 [ànchǔ]
岸基處理 英文
shore-based processing
  • : Ⅰ名詞(水邊的陸地) bank; shore; coast Ⅱ形容詞[書面語] (態度嚴峻或高傲) lofty
  • : 處名詞1 (地方) place 2 (方面; 某一點) part; point 3 (機關或機關里一個部門) department; offi...
  • : Ⅰ名詞1 (物質組織的條紋) texture; grain (in wood skin etc ) 2 (道理;事理) reason; logic; tru...
  1. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是本一致的,各部位的泥沙沉積比例變化本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,本成正比關系; ( 3 )在口門,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲線則可能于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  2. This paper presents the process of soft ground treatment for coast revetment in the comprehensive improvement construction of coastline from quay no. 3 to tongyi quay at xiamen island, and the construction technology for treatment of the ground at intertidal zone by way of underwater vacuum precompacting and combined heap load precompacting

    摘要介紹廈門島第三碼頭至同益碼頭段線綜合整治工程中的護工程礎軟過程,在潮間帶採用水下真空預壓聯合堆載預壓軟施工工藝。
  3. With the increasing requirements for detecting distance, photoelectric module, including light source and modulation, can be put under water to reduce the loss of light power in the optical fiber transmission and transmit the detected signal to the signal processing workstation on the shore. optical transceivers must be applied to realize the low - rate optical communication between the workstation on the shore and the long - distance photoelectric modules under water

    隨著光纖水聽器陣列技術的發展,可將光源與調制部分作為遠程光電模塊置於水下,減少光纖傳輸過程中光波信號的損耗,而直接將光纖的探測信號傳回工作站進行,以增加光纖水聽器的探測距離。
  4. Because of deposit the ground form, wide soft soil and large thickness, we should use the methods to set up the standard design., such as to change and fill out a stone, lump block of stone of the strong rammer and split off the thick liquid of note and so on

    摘要深圳市港灣大道沿線屬前海灣沿海漫灘沉積地貌,軟土層分佈范圍廣、厚度大、性狀極差,闡述該路採用的換填塊石、劈裂注漿、插板排水堆載預壓、強夯塊石墩等地方法,進行了標準設計。
  5. The application of treatment soft foundation by shallow - dense sand piles on the river bank

    短密砂樁在河道駁軟土地中的應用
  6. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在丘橋和南州橋位置各築一節制閘(而丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入水源地的截污工程; ( 2 )引水工程:是截污工程的配套工程,利用下游長蕩湖來補充水量,並對3個引水工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略水源地一併納入保護體系中; ( 3 )濕地生態工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品地以及污泥置。
  7. The retaining wall reclining on the slight slope built on soft foundation is usually used in protecting the shore of river, the contradiction between the lack of impartiality in stress of the base and the small stress allowed by the foundation as well as the lack of stabilization of the breast wall is a hard nut to crack in the engineering. in the paper, a tenon - base is added under the base of the retaining wall, on the study of the choice of the parameters and formulas used in calculation and the research of theory used in calculation, method used to deal with the load, etc, the writer gives a way to crack the nut mentioned above paragraphs and presents a qualitative and quantitative analysis about them, such as the equivalent inner friction - angle ( d ) and the passive press of the clay ( ep ), etc. in the end of the paper, using modern optimization method, a design of the retaining wall reclining on the slight slope built on soft foundation is done, the result is economical, and accords with the fact

    上的仰斜式擋土墻在水利工程河道護中經常遇到,仰斜式擋土墻底偏心應力較大和軟土地容許承載力偏小的矛盾以及擋土墻抗滑穩定不足是工程中難以解決的難題。本文在對仰斜式擋土墻設計中有關計算參數的選擇、公式的選用應該注意的問題進行了研究,對河道護礎上的仰斜式擋土墻採用凸榫的方法,就其計算論、設計驗算中各荷載的具體方法進行了較為細致的研究,提出了解決軟礎上的水工仰斜式擋土墻難以解決的難題的方法,並對有水情況下粘土等效內摩擦角_ d 、凸榫被動土壓力e _ p等在計算中的取值提出了定性和定量的分析。最後利用現代優化方法對軟礎上的水工仰斜式擋土墻進行了結構優化設計,得出了符合實際的結果,與其它重力式擋土墻形式進行比較,取得了明顯的經濟效益。
  8. Light source and the signal processing device are placed on the shore in the optical fiber hydrophone system using phase - generated - carrier technique, which make the wet end with no electronic devices

    採用相位載波調制解調技術( pgc )的陣光纖水聽器信號檢測方案將光源與信號都放在上,系統濕端全光纖化。
  9. The light well point drainage method in combination with other measures was successfully used in the treatment of the deformable earth body on the southern side of the outlet channel of the right - bank diversion tunnel at the goupitan hydropower station to make the earth body stable, ensuring the smooth construction of the right guide wall and the foundation pit of the outlet channel

    在構皮灘水電站右導流隧洞出口明渠南側土質變形體抗滑治中採用輕型井點降水法並輔以其配套措施取得成功,使其于穩定狀態,確保了該出口明渠右導墻與明渠坑的順利施工。
  10. In the course of practical research, it has summarized out the rational visual scene data base modeling flow, and put forward the three - dimensional real sense topographical modeling method based on simple electronic sea chart contour information and three - dimensional object producing method, including three - dimensional building on the bank, assisting navigation marks, foundations of shipping model and the processing method of light quality data

    在實際研究過程中,總結出了一套科學合的視景數據庫建模流程。並提出了於簡易電子海圖等高線信息的三維真實感地形建模方法,以及三維物體模型生成方法,包括三維上建築、助航標志和船舶模型的建立,其中還介紹了燈質數據方法。
  11. In the same year, the government also set up the straits exchange foundation, which represents the government in handling cross - strait matters such as authentication of documents, joint law enforcement, and protection of intellectual property rights

    又同時成立財團法人海峽交流金會,代表政府與大陸交涉交流中產生之相關問題,例如兩文書認證共同打擊犯罪共同進行著作權保護等等。
  12. The port of zhangjiagang handled 15 million tons of cargo with its 20 ten - thousand - ton berthes and 10 regular routes to japan, singapore, hongkong, the mediterranean and other countries in europe and america. the overall water freight capabilities have been enhanced significantly with the completion of ten - thousand - ton oil tanker berth in port of liujia, the opening of the route from port of changshou to city of nantong and other expansion projects. additionally, the city is served two airports, shuofang airport in the west and guangfu united airlines airport in the south

    港口建設初具規模,地長江下游的張家港,已建20w上萬噸級泊位,年吞吐能力達1500萬噸,已開通到歐美地中海,日本新加坡香港等10多條航線太倉市境內的瀏家港,水深直,全長11 . 5公里,且臨近吳淞口,是建設上海分流港的想之地,萬噸級油輪碼頭已本建成。
  13. In the research of numerical modeling on coastal engineering, there have been a lot of research works in numerical computation and post - processing presentation on numerical modeling. however, in data preparation for numerical modeling, the works to be done remain manual. thus, it ' s important and helpful to work out a solution in data preparation for numerical modeling based on comgis

    目前在海動力數值模擬研究領域,數值模擬計算和數值模擬后方面都有大量的研究成果,而數值模擬前方面卻還停留在依靠人工方法讀取紙質地圖數據的階段,因而於組件式地信息系統技術來研究和實現一個前應用系統,滿足海工程專業的實際需要是非常必要的。
分享友人