岸控測量 的英文怎麼說

中文拼音 [ànkòngliáng]
岸控測量 英文
shore-controlled survey
  • : Ⅰ名詞(水邊的陸地) bank; shore; coast Ⅱ形容詞[書面語] (態度嚴峻或高傲) lofty
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
  1. The main contents include : water environment, marine sediment and the trend monitoring of marine life quality ; at the same time, to consolidate the monitoring of the functional zones, such as seashore bathing places, oceanic reserves, marine aquafarms ; to set up the seashell monitoring and controlling zones in the sea areas of both pingtan and yunxiao at the first time ; to carry out the statistical monitoring of polder, exploiting sea sand, spartin aallerni flora, terrestrial sewages, etc., to carry out monitoring of the total quantity of pollutants into the offshore marine areas in the min river, the jiulong river as well as the municipal sewages of xinlin industry in xiamen and jiaocheng in ningde ; to carry out the red tide monitoring in the offshore marine areas of fujian province ; to implement time - lapse, pointing and continuous red tide monitoring of high frequency and high intensity in the sandu gulf, the min river estuary and offshore marine areas of xiamen

    主要內容包括水環境、海洋沉積物和海洋生物質的全海域環境趨勢性監,同時加強了海水浴場、海洋保護區、海水增養殖區等功能區監;首次在平潭和雲霄海域設置了貝類監區;開展了圍填海、海砂開采、互花米草、陸源排污口統計監;並在閩江、九龍江、廈門杏林工業排污口、寧德蕉城市政排污口鄰近海域開展污染物入海總;在全省近海域開展赤潮監視監,對三都灣、閩江口、廈門近海域赤潮監區實施高頻率、高密度的定時定點連續監
  2. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定分析: (一扣根據實資料首次建立了河贖流路泥沙沉積分配的回歸計算式,據此可以預估計算河口不同區域泥沙的沉淤; 、 5 )本項研究首次論證了河口三角洲線動態平衡的概念,並建立了黃河河口來沙與造陸面積的相關關系,得出了當河口多年平均來沙維持在3 . 45億t時其河口三角洲線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調的概念,並對其宏觀優化調模式進行了初步探討。
  3. The system is designed to collect the height of water of the measured points, control the slacker of the river and process the data in the distance

    該系統主要用於實現對河流沿點處的水位數據採集、閘門狀態的遠程和對各點處的水閘進行遠程制。
分享友人