嵌巖灌注樁 的英文怎麼說

中文拼音 [qiànyánguànzhùzhuāng]
嵌巖灌注樁 英文
piles set into rock
  • : 嵌名詞(用於地名) a word used in place name
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : Ⅰ動詞1 (輸水澆土) irrigate 2 (倒進去; 注入) pour in; fill 3 (飲酒; 勉強他人飲酒) drink wine...
  • : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  • 灌注 : pour into; priming; flood灌注機 bottler placer
  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試施工工藝的檢測和身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基承載實驗表明了荷載與摩擦阻力之間的關系,並對溶地區的嵌巖灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明側摩阻和支盤端阻起很重要的作用,端阻力所佔比例甚少。這與設計基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆孔端下的體強度和結構穩定性方面進行模擬計算和定量研究。
  2. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥層中鉆孔提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根身內埋設量測元件試的單豎向靜載荷試驗資料,分析了各試驗特別是常規沖孔在昔格達泥中的軸向力、側摩阻和端阻力的分佈和發揮規律;二是在討論現行規范對承載力的計算公式的基礎上,探討了在昔格達泥層中的沖孔的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達層中的應用效果,提出了相應的參數選取,從而為壓力漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用型以及指導施工提供了依據。
  3. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆孔施工中,在不同地質條件下,水上鉆機平臺的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜面上鉆孔面上鉆孔孔底標高問題作了探討
  4. Bearing behavior experiment of large diameter rock - socketed cast - in - place piles

    大直徑嵌巖灌注樁承載力的試驗研究
  5. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對溶地段鉆孔的施工工藝、荷載傳遞機理、持力層頂板厚度及深度等方面作一些探討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  6. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于溶地區鉆孔的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對溶地段基的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工試驗及力學、有限元分析,對溶地區鉆孔的施工工藝、荷載傳遞機理、持力層厚度及深度等方面做一些探討性研究。
  7. Factors influencing quality of grouted baserock - inserting pile

    試論鉆孔的工程質量
  8. Main characteristics of bearing capacity of cast - in - place pile under vertical load have been expounded by introduction to engineering course and analysis of experiment result. and application of test pile in concrete design has been probed

    摘要通過對工程試過程介紹及對結果的分析,總結了豎向荷載作用下嵌巖灌注樁承載力的主要特點,並對試在具體設計中的應用進行了探討。
  9. And the clear and complete calculation methods of the piles in soft - rock in the standards have not yet been found. on the basis of testing study on bearing properties of bored pile in xigeda - mudstone in xichang - panzhihua expressway project, this paper works in three aspects

    對以該泥層為持力層的嵌巖灌注樁基礎未見專門研究文獻,現行各規范對極軟中的基亦沒有明確完整的計算方法。
  10. Piles set into rock

    深基礎嵌巖灌注樁
  11. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘探手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對溶地區鉆孔的施工工藝、荷載傳遞機理、持力層頂板厚度及深度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  12. Application of pile underpinning technology in line three of guangzhou metro

    鉆孔微型鋼管基托換工程中的應用