巖塊體 的英文怎麼說

中文拼音 [yánkuāi]
巖塊體 英文
rock mass
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : 名詞(古時佩帶的玉器) penannular jade ring (worn as an ornament in ancient china)
  • : 體構詞成分。
  1. The above analysis shows some results as follows : generally the discontinuities including bedding planes are favor to the stability of slope, which means that most of the slopes will not suffer large sliding failure ; most of the high slopes situated in the interest area are stable. however there are some potential unstable wedges which can be identified based on the key block theory ; some suggestions for reinforcing high slope are presented based on the stability analysis and environmental friendly consideration

    結果表明:該區邊坡條件對邊坡整穩定性有利;區內高陡邊坡以穩定及基本穩定為主,不穩定邊坡較少,但潛在局部不穩定較多;依據邊坡的工程地質特徵及穩定性評價結果,對該區高陡邊坡的防治提出了建議。
  2. Finally, author have discussed the relationship transformation process of the honghe fault shear mode and block movement, proofed that the eta - type tectonic system was formed in miocene epoch

    討論了紅河斷裂剪切方式的轉變過程與運動的關系,論證了歹字形構造系形成於約20ma的中新世時期。
  3. The mine zone is sandwiched between an overlying block of flows, pillow lavas and minor pyroclastics, and underlying agglomerates, tuffs, and more massive diabase bodies.

    含礦帶夾在上覆的流、枕狀流和少量火山碎屑與下伏的集、凝灰狀輝綠之間。
  4. The study on the movability of the face - contacted blocks in overlying strata above the longwall face in datong

    大同采場覆面接觸可動性判定研究
  5. ( 5 ) analysing the stability of block after excavation in zhegu mount tunnel by using block theory

    ( 5 )運用理論分析了隧道開挖后圍穩定問題。
  6. Block theory and its application in the stability analyses of country rock of the tunnel in linglong gold mine

    理論在玲瓏金礦巷道圍穩定性分析中的應用
  7. The block theory, which has developed and improved this years, is a method of studying the rock mass work " s stability. this method has been applied to several fields and has made much progress

    理論是近年來發展和完善起來的一種工程穩定性分析研究方法,其研究方法已經較為成熟,各種分析方法也均有較大進展。
  8. 3d elasto - visco - plastic hierarchical block element method for rock mass

    的三維彈粘塑性階譜單元法
  9. The significance of element abundances of rocks in the study of geochemical blocks

    石化學元素豐度在地球化學研究中的意義
  10. The main contents of testing the strength of subgrade abamurus using earthquake wave velocity are as follows : the influence of the lithology and strength of flag stones and the shape of block upon wave velocity, the influence of the strength of cement mortar upon earthquake wave velocity, the estimation standards of the strength and completion of abamurus. this paper puts forward an accurate no - destructive testing using the different reflect of elastic wave velocity for abamurus stones, the strength of mortar, the plumpness of mortar and the type of abamurus, on the basis of laboratory tests and field tests. it can be used to accurately distinguish the completion of abamurus

    地震波速法檢測路基擋墻強度,研究的主要內容有:片石性和強度及對波速的影響;水泥砂漿強度對墻波速的影響;擋墻整強度和完整性的評估標準。應用彈性波速度對擋土墻石材、砂漿強度、砂漿飽滿度及擋墻類型的不同反映,在室內外模型試驗和現場生產試驗的基礎上,提出了一種正確的無損檢測法,可以正確判別漿砂片石擋墻墻身的完整性。
  11. This paper adopts the land use state in2000a ( l : 3 + 104 ), the soil chart ( 1 : 6 + 104 ) and hectometer contour relief map ( include three chongqing area ) of chongqing and geology map ( l : 6 + 104 ) of sichuan province as basic analytical data, measure landscape patches into 7 types including cultivated land, orchard, forestland, unused land, grassland, resident and industry land, water bodies according to land use state basing on land use types, make the landscape map of chongqing karst area by gis software

    本研究是以重慶市1 : 30萬的土地利用現狀圖( 2000年版) 、 1 : 60萬的土壤圖以及重慶市百米等高距的地形圖和四川省(包括重慶市) 1 : 60萬的地質圖作為基本分析圖件。在土地利用類型的基礎上,依據土地利用現狀劃分了耕地、園地、林地、未利用地、草地、居民工礦用地和水域7類景觀嵌類型,再藉助于gis軟生成重慶溶區景觀圖。
  12. Research on key blocks in the surrounding rock mass of underground powerhouse, the three gorges project

    三峽工程地下廠房圍關鍵研究
  13. On the basis of appraising a traditional method, the method of the stereographic projection and proportionally stereographic projection of a solid volume, this paper has introduced such methods as determination of dominant discontinuities, kinematic tests for rock - mass failure modes, geometrical judgment of a removable block, and determination of a key block, extending perfecting the traditional method, and thus making it has better suitability or availability and practicality

    摘要本文在評價用傳統方法即赤平極射投影和實比例投影方法分析節理邊坡穩定性的基礎上,結合具工程實例引進了優勢結構面的確定、破壞模式的運動學判釋、可移動的幾何判定和關鍵的確定等方法,使傳統方法得到拓寬和完善,從而具有更好的適用性和可操作性。
  14. Simulating tension crack of rock masses by block element method

    結構拉裂的單元法模擬
  15. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站壩區的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡的結構特徵及岸坡淺表生改造特徵,建立了岸坡淺表生改造與岸坡演化模式,分析研究了的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整穩定性進行了系統分析、計算與評價;應用理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  16. ( 2 ) statistical character and engineering control effect of short and intermittent structural plane ( iiia and iiib level ) of dam abutment has been systemically studied. and this kind of structural plane took important effect to appraise whether latent discrete boundary of massif could be formed and rock mass quality

    ( 2 )系統研究了壩肩短小、斷續性結構面(分類中的_ a類和_ b )的統計特徵及其工程式控制制效應,闡明了此類結構面對能否構成壩肩的潛在分離邊界以及對質量的評價起著重要作用。
  17. The authors hold that the joint actions of numerous factors such as the upper mantle uplifted zone ( the mantle thinned zone of lithosphere ), the upper mantle anomalous area ( relatively low - velocity area ), the uplifted zone of intracrustal high - conductivity layer, the deep fault ( shear zone of lithosphere ), the margin of the crust - upper mantle uneven masses, the basement uplifted area reflected by gravity high, the magmatic belt and tectonic intersection reflected by skipped magnetic field, control the distribution of auriferous skarn deposits and copper ( associated with gold ) skarn deposits

    作者認為,上地幔隆起帶(石圈地幔減薄帶) 、上地幔異常區(相對低速區) 、殼內高導層隆起帶、深斷裂(石圈剪切帶) 、地殼上地幔不均勻性的邊緣、重力高反映的基底隆起區、跳躍磁場反映的漿帶和構造交匯處等諸多因素的共同作用控制著含金夕卡礦床和銅伴生金夕卡礦床的分佈。
  18. Probabilistic analysis on blocks sliding of large - span tunnel

    大跨度隧道工程滑落的概率分析
  19. 4. achieved the high - speed colliding experiment of landslide for the first time, the paper studies the volume distributing ruler of different velocity segment after collide, fits the experiment data via extreme function, obtains the value range of the shape parameter, thereby gets the distributing function of all part of landslide after collide. on the base of above, the paper studies the accelerating effect of partial rock - mass because of colliding, and acquires the relation between accelerating volume and overall volume, and colliding velocity

    ( 4 )首次進行了滑坡的高速碰撞模型實驗,研究了碰撞解后不同速度段積的分佈規律,並應用峰值extreme函數對實驗結果進行了數據擬合,確定出了各形狀參數的取值范圍,從而得到了滑坡高速碰撞后不同的分佈函數,並在此基礎上研究了滑坡碰撞後部分的加速運西南交通大學博士研究生學位論文第2頁動效應,得出了獲得加速的比例與滑坡總積及碰撞速度的關系。
  20. In the light of all kinds of structural faces and their assembles along tunnel, the place and growth depth of instable cuneiform body in tunnel wall rock could be predicted, then its volume and weight of instable cuneiform body are estimated based on the equator plane projecting method and the solid body ratio geometry method, which offers reliable geologic data for designing corresponding supporting measure

    摘要利用赤平投影法和實比例幾何法分析隧洞圍穩定性,根據隧洞沿線所遇結構面相互組合形式,預測隧洞圍不穩定楔形的位置及其發育深度,從而估算不穩定楔形積和重量,為設計相應的支護措施提供可靠的地質依據。
分享友人