巖層錯斷 的英文怎麼說

中文拼音 [yáncéngcuòduàn]
巖層錯斷 英文
leap
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : Ⅰ形容詞1 (錯誤; 不正確) wrong; mistaken; erroneous 2 (用於否定: 壞; 差) bad; poor 3 (交叉; ...
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  1. Field investigations found that epigenetic reworking deformation fracture include 3 types, named normal relief fracture, fracture filled mud and epigenetic reworking of disturbed belts. and epigenetic reworking of rock mass structural also includes gradual deformation of the blocks that are made up of different attitudes structural planes besides normal relief. through field geological investigations, the features of rock mass structural planes are generalized, especially development laws of interlayer shearing belts, instrastratal shearing belts, faults and base crack

    在已有研究成果基礎上,總結了壩區玄武相特徵和構造應力場對體結構的影響;通過現場調查,總結了3種類型淺表生變形破裂,即正常卸荷型破裂、鬆弛夾泥型破裂和緩傾角動帶表生改造;通過野外地質調查,總結了動帶、動帶、和基體裂隙的發育規律。
  2. Sliding structures are recognized appling multiple ways, and they occur in sections in the shape of flowers. the main sliding fault has the characteristics of straightness and sectionality in plane view. in the main displacement belt or its adjacent areas, an echelon faults and an echelon folds appeared

    應用多種標志識別走滑構造,主要表現為剖面上出現花狀構造,主走滑平面上呈平直狀和分段性,在主位移帶內或其毗鄰地區出現雁列及雁列褶皺,在主幹裂帶兩側的褶皺構造可見火山體被開,位移2 4km ,在鉆井心樣品中見到明顯的走滑構造運動形跡。
  3. The preferences are analyzed, pipe ’ s parameters such as depth, thickness, pipe diameter, and mechanical property of material ; soil parameters such as soil types, internal friction angle, pipe - soil interaction ; fault ’ s parameters such as fault types, fault throw, fault drop, fault - pipe angle, mechanical property of material ; load types such as gravity force, linear displacement load, seismic load and seismic wave. some conclusions are drawn from the calculating results : when buried pipes cross fault, pipe ’ s embedded depth should be shallow, and big pipe diameter and thick wall should be selected. avoid the site where fault moves severe, and select suitable pipe - fault angle

    在有限元三維模型建立中考慮的因素有:管道自身參數如管道埋置深度、管壁厚度、管徑、管道材料等;土材料參數如土體類型、土的內摩擦角、管土相互作用等;考慮有類型,距,動距離,與管道的交角,材料的考慮等;荷載分別考慮靜荷載,動荷載,其中動荷載包括線性位移加載、地震力加載和地震波加載等。
  4. The dislocation interfaces of early stage were controlled by the slide of the ne fold. the dominant dislocation interfaces, in the dam area, is the one of the second stage, which resulted from the slide of the lava layer and lagerkluftes from nw to se because of the affect of the majiaheba faultage ' s thrusting overriding to the dam area from nw to se. the dislocation interfaces of the third stage were the result of the overprint of the structure of ne to the one of nw

    早期階段形成的動帶受控于北東向縱彎褶皺的間彎滑機制;第二階段形成的動帶在壩區佔主導地位,它們是由於北東向馬家河壩由北西向南東的滑脫逆沖推覆影響壩區,並造成壩區向南東緩傾的沿原生構造面向南東滑動的結果;第三階段形成的動帶則是由於北西向構造疊加於早期北東向構造之上而致。
  5. To know the rupture course and rupture range, we simulated the process of rupture on the overlaying soil with soft interlayer by plane strain finite element method in this paper

    摘要為了了解軟夾對基上覆土破裂的影響,確定土的破裂范圍,採用平面應變有限元法,模擬了有軟夾的上覆土動時的破裂過程。
  6. Study on influence of fault dislocation on a core rockfill dam

    動對心墻堆石壩的影響研究
  7. Based on the analysis, we gave an example to study the dynamic contact with friction of the intermittent joint, and got some essential rules : the friction coefficient could n ' t influence the distributing of dynamic stress on the contact surface, and the roading rates affected evidently on the dynamic characteristic on the contact surface. in the last part, this paper made respectively use of the time - history method and the response spectrum method to analyze the dynamic response of the rock slope on baise hydraulic power plant, and got the coincident resultant. simultaneously, the contact theory was applied to study the stability of the intermittent joints

    基於上述的接觸理論和接觸分析結果,本文在最後一部分中分別利用動力時程法和反應譜法對百色水電站尾水渠的質邊坡進行動力響應分析,兩者計算方法得出比較一致的結果,同時採用動力摩擦接觸理論重點分析了對于邊坡的穩定影響,認為的存在會使得坡的穩定性降低,在地震等動力荷載的作用下對于將發生張開、閉合和動現象,尤其是動力荷載和其他荷載如滲流力等的耦合作用將會對產生極為不利的後果,進而影響坡的整體動力穩定,應該要引起足夠的重視。
  8. I ts d am height i s 2 87m, equipped capacitor 12000mw and permian emei mountain basalt is the main strata in dam site. field investigations show that there are discontinuities such as interlayer shearing belts, instrastratal shearing belts, faults and base crack. the discontinuities control the stability of rock mass against high arch dam shoulders anti - sliding stability which is the main engineering geological problems in dam site

    壩區地主要為二疊系峨眉山玄武,調查表明,玄武中存在由緩傾角的間、動帶和、裂隙構成的體結構體系,對壩區的主要工程地質問題,尤其壩肩抗力體的抗滑穩定性具有重要的控製作用。
分享友人