巖部後面 的英文怎麼說

中文拼音 [yánhòumiàn]
巖部後面 英文
posterior surface of petrous part
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : Ⅰ名詞1 (部分; 部位) part; section; division; region 2 (部門; 機關或組織單位的名稱) unit; mini...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. Based on the analysis of thermal contact metamorphic aureoles, granitoid interior structure, quartz axis fabric and strain characters in the different rock unites of yuanshishan granitoid and its wall rocks, the emplacement mechanism of yanshishan granitoid was studied. the magmatic explictite dynamic was advanced in light of regional stress and magma dynamic research. those conclusion was synthesized to ascertain the emplacement mechanism - granitic magma ascended in dikes with the minimum critical width of the magma ascending channels about 2. 213. 88m and located in the core of yindianshan dome with the passive style of dyke explictite ; the later unite is a kind of multiple emplacement mechanism with the character of active emplacement of ballooning

    同時運用漿動力學原理從另一個角度探討其侵位驅動力。綜上指出:經分凝后的活動性漿在深側向擠壓和浮力的聯合驅動下,沿深大斷裂以最小臨界寬度為2 . 213 . 88m的裂隙脈動上侵,整體以墻擴展的方式被動定位於銀殿山穹窿的核,但期屋前單元具有主動侵位的特點應為一種復合定位機制。
  2. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    ,對土工程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載力問題進行了實用化的探討,提出了考慮地基變形的地基承載力上程計算方法;對基於彈塑性理論分析的地基承載力國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載力界限荷載p _ ( 1 / 4 ) ,並與國內外土力學專著及地基基礎設計規范中的條形基礎(平問題)的界限荷載p _ ( 1 / 4 ) ,進行了對比,從而定量上解釋了目前設計規范引用土力學承載力公式值偏於保守的這一情況;根據本文作者多年從事現場地基工程振動試驗及相關課題的研究工作,本文以截頭錐模型模擬地基,對地基(基)承載力的動測法進行了研究,為各類地基(包括基) ,匯總了動力分析和檢測川的參數:針對日前土工程界應用樁基設計規范中的難點? ?樁端基承載力的確定問題,從石室內單軸抗壓強度確定、基於彈塑性模型的有限單元法計算、土力學計算及深斤載荷試驗四方進行了深入討論;本文作者根據多年現場載荷試驗的工程實踐,對深井荷試驗裝置的核心分? ?反力裝置,設計了側壁支撐反力加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  3. Benthic foraminifer fauna, ams14c dating and acoustic sub - bottom profile was analyzed in the core ey02 - 2 and ey02 - 1 drilled from the muddy deposit in the middle southern yellow sea and the mid - shelf of north east china sea. considering the results of core qc2 ? dz4 and the standard oxygen isotope curves, we discussed the late - quaterenary paleo - environment evolution, benthic foraminifer fauna, paleo - climate, the climate events and water mass in postglacial period, average sedimentation rates, paleo - water depth, origin of sediments, average sea level rise rate in the shelf of south yellow sea and east china sea. at last we discussed the condition of sea level rise in the east china, green house effect and the protection of coastal zone

    本文根據南黃海中泥質區和東海中陸架的兩個鉆孔芯的古生物、 ams ~ ( 14 ) c測年、淺地層剖等,參考qc _ 2 、 dz _ 4成果及標準氧同位素曲線探討了黃東海陸架晚第四紀古環境演化、底棲動物群特徵、古氣候、冰期以來氣候事件、古水團、沉積速率、古水深、沉積物源、海平平均上升率,討論目前中國東海平上升的狀況、溫室效應及海岸帶保護。
  4. I was so amaz d with the thing it self, having never felt the like, or discours d with any one that had, that i was like one dead or stupify d ; and the motion of the earth made my stomach sick like one that was toss d at sea ; but the noise of the falling of the rock awak d me as it were, and rousing me from the stupify d condition i was in, fill d me with horror, and i thought of nothing then but the hill falling upon my tent and all my houshold goods, and burying all at once ; and this sunk my very soul within me a second time

    完成圍墻后的第二天,我幾乎一下子前功盡棄,而且差點送命。事情是這樣的:正當我在帳篷的山洞口忙著幹活時,突然發生了一件可怕的事情,把我嚇得魂不附體。山洞頂上突然倒塌下大量的泥土和石塊,從壁上也有泥土和石頭滾下來,把我豎在洞里的兩根柱子一下子都壓斷了,發出了可怕的爆裂聲,我驚慌失措,全不知道究竟發生了什麼事,以為只不過像上回那樣發生了塌方,洞頂有一分塌了下來。
  5. The rock anchor beam is the most difficult and demanded in excavating underground factory, its quality will affect its safety of performing later, as a result, a better quality and smaller crushedregion is demanded

    在水電站地下廠房開挖中,錨梁開挖難度大、質量要求高,該位成型質量的好壞將直接影響今廠房內吊車的運行安全。錨梁開挖要求其具有良好的開挖輪廓和較小的破壞范圍。
  6. The further study shows that the sandstones at the bottom of the lower ganchaigou formation, which is a tr lithostratigraphic unit, were deposited in different stages of base level cycle, and they are not chronostratigraphic unit. so, to identify different sequences, especially high order sequences in analysis of terrestrial stratigraphic sequences, the sequence distribution feature must be fully consided. this view has practical significance for recognizing forming, evolution and filling history of qaidam baisn correctly, and has both theorical and practical meaning for directing further oil exploration

    研究還表明,傳統石地層單位中下乾柴溝組底的砂代表了基準變化旋迴不同階段沉積的產物,它們屬于不同的成因單位,也非等時地層單位,因此,在進行陸相層序地層分析時,各級層序尤其是高級層序的識別要充分考慮上的層序展布特點,這一觀點對正確認識柴達木盆地的形成演化和沉積充填歷史,指導今的勘探具有一定的理論和實際意義。
  7. This cold snap formed layers of jumbled rocks and other materials that a glacier carried and then dropped to the ground when the ice melted sometime between 2. 45 billion and 2. 2 billion years ago

    在這次寒冷的短冷期,冰河中挾帶的屑與其他物質,於24億5000萬年前與22億年前之間冰川融化之際,散亂遺留于地,日成為地層的一份。
  8. These landslides go with fluidization peculiarity different degree in course of their motion, and their speed and distance increase several times because of the fiuidization, thereby the disaster area greatly broaden. on the base of above, the paper studies systematically the fluidization of large high - speed rockslides in all its aspects : analyzed the aerodynamic effect in the short - range on the base of the wind turmel experiment, studied the effect of falling into pieces when landslides collides mountain ; studied the accelerating effect through high - speed collide experiment of landslides model ; and the paper reappear the overall process including set - out, collide in the short range, debris flow in the long - range of touzhai large landslide via distinct element method ( dem ), studied the flow law and equation of different type of debris flow resulted from large landslide. as a sample to apply, the paper analyzed fluidization mechanism of touzhai landslide

    基於這一點,本文對大型高速質滑坡的流體化現象進行了全而系統的研究:通過風洞模型實驗,研究了大型高速滑坡凌空飛行階段的空氣動力學效應,研究了飛行中滑坡體在與途中不動山體發塵碰撞時的解體破碎效應,通過滑坡體高速碰撞模型實驗研究了滑坡體解體破碎體的加速運動效應,並應用離散單元法再現了雲南頭寨溝大型滑坡啟動高速、近程碰撞、遠程碎屑流運動的全過程,研究了體解體破碎后形成不同類型碎屑流的運動規律及運動方程,並對頭寨滑坡流體化運動機理進行了實例分析,取得了以下主要結論和成果: ( 1 )對于大型高速滑坡,大多在啟程活動階段已獲得了高速,這使得這類滑坡在其離開剪出口之以凌空飛行的形式向前運動,在其飛行過程中,滑坡體與空氣強烈作用,並產生空氣動力學效應,滑坡體在因碰撞而產生的解體破碎效應及體的加速運動效應的作用下,在遠程活動階段,以高速碎屑流的形式向前運動。
  9. In general, some practical and useful fitting equations are deduced after researches on static and dynamic tests of composite cemented clays and corresponding regression analysis, which can be referred at the shortage of test data. the dynamic interaction between composite cement pile foundations and structures as well as the seismic settlement of superstructures are analyzed with the conversed seismic acceleration pr

    將地震曲線進行反演施加於基,通過對水泥攪拌樁復合地基和上建築結構動力相互作用以及建築結構的震后變形的分析研究,得到了一些對抗震設計有意義的結論,為今累似工程合理地進行地基處理和結構抗震設計提供了良好的參考作用。
  10. This wall being describ d before, i purposely omit what was said in the journal ; it is sufficient to observe, that i was no less time than from the 3rd of january to the 14th of april, working, finishing, and perfecting this wall, tho it was no more than about 24 yards in length, being a half circle from one place in the rock to another place about eight yards from it, the door of the cave being in the center behind it

    這里只提一下:從一月三日至四月十四日,我一直在修築這座圍墻。最終于完成了,並盡可能做得完滿。圍墻呈半圓形,從壁的一邊,圍向另一邊,兩處相距約八碼,圍墻全長僅二十四碼,洞的門正好處于圍墻中
分享友人