工作壓力上限 的英文怎麼說

中文拼音 [gōngzuòshàngxiàn]
工作壓力上限 英文
maximum working pressure
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 壓構詞成分。
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 上名詞[語言學] (指上聲) falling-rising tone
  • : Ⅰ名詞(指定的范圍; 限度) limit; bounds Ⅱ動詞(指定范圍, 不許超過) set a limit; limit; restrict
  1. In view of bearing capacity of the elastoplastic theory analysis, the author made a comparison between the achieved bearing capacity limit load pi / 4 of round base ( space problem ) and the limit load pi / 4 of bar groundwork foundation design ( plane problem ) from soil mechanics at home and abroad as well as foundation criterion, and explained why the value of formula in present design criterion from soil mechanics is inclined to be conservative. in the light of the author ' s many years experience of vibration test on the spot and the research work of relevant projects, the author worked over the dynamic pile testing of the bearing capacity of foundation and batholith, and gathered the parameter of dynamic analysis and testing. the author also talked over the difficult point of pile foundation design criteria in present batholith engineering world, i. e. the confirmation of batholith bearing capacity of pile end, from the following aspects : a ) confirmation of single axis counter - pressure strength of rock in house ; b ) f. e. m calculation of elastoplastic model ; c ) calculation of soil mechanics ; d ) deep well load test

    然後,對巖土程領域至今尚未解決,甚至不為人注意的考慮地基變形的地基承載問題進行了實用化的探討,提出了考慮地基變形的地基承載程計算方法;對基於彈塑性理論分析的地基承載國內尚未見報道的空間問題得到了圓形基礎(空間問題)的承載荷載p _ ( 1 / 4 ) ,並與國內外土學專著及地基基礎設計規范中的條形基礎(平面問題)的界荷載p _ ( 1 / 4 ) ,進行了對比,從而定量解釋了目前設計規范引用土學承載公式值偏於保守的這一情況;根據本文者多年從事現場地基程振動試驗及相關課題的研究,本文以截頭錐模型模擬地基,對地基(巖基)承載的動測法進行了研究,為各類地基(包括巖基) ,匯總了動分析和檢測川的參數:針對日前巖土程界應用樁基設計規范中的難點? ?樁端巖基承載的確定問題,從巖石室內單軸抗強度確定、基於彈塑性模型的有單元法計算、土學計算及深斤載荷試驗四方面進行了深入討論;本文者根據多年現場載荷試驗的程實踐,對深井荷試驗裝置的核心部分? ?反裝置,設計了側壁支撐反加載系統,該加載系統具有實用、簡便、穩定及安個等優點。
  2. On the basis of investigations into the progressive yield process and the possible failure modes of rcc gravity dams, the quasi - elasticity design limit state of the ctrtical stability criterion is proposed and the real working state of the dams designed according to the ctriterion is discussed. a check formula using the material strength reducing factor as the safety index and a simplified formula similar to against sliding stability fromula are derived. finally, the corresponding design safety factors are given by using fem calculations with various influence parameters to be taken into account

    本文在研究碾混凝土重壩漸進破壞過程和可能失穩方式的基礎,提出了以準彈性臨界為穩定臨界準則的設計極狀態,分析了按該準則設計的大壩的實際狀態,導出了以準彈性強度儲備系數為設計安全指標的審查公式以及形式與抗剪斷公式相同的簡化公式,探討了定量計算考慮各種因素影響的相應設計安全系數的合理取值,並與現行規范方法進行了比較
  3. The paper studies the surface geometry of globoidal indexing cam by applying the theory of conjugate surfaces and the method of coordinate transformation, presents the equations related to the main inducement curvature of the cam profiles, analysis and deduces the equations of two circumscription curves, which judge if the conjugate surface could mesh properly. some calculate examples and conclusion are given. the surface equation of the globoidal cam and conjugate equation are established

    論文首先在分析空間嚙合原理基礎,採用坐標變換法推導出弧面分度凸輪的廓面方程、嚙合方程和角計算公式,對弧面分度凸輪的嚙合特性進行了深入的分析和研究,對判斷曲面能否正確嚙合的依據如兩類界線方程以及誘導主曲率等進行推導,並給出算例。
  4. ( 2 ) respectively by elastic theory analyses and methods of structural mechanics, transverse static analytical equations for flexible pipeline rigid pipeline are established whose outcomes are applied in numerical example to compare those with that by finite element method. ( 3 ) considering interaction of filled soil, pipeline and foundation, with an eye to non - linear soil model, in view of the initial geo - stress field and the effects of interface between soil and pipeline, and by finite element method the calculational model and method are built for transverse stress in pipeline. then, by the great finite element analytical software ansys, those outcomes are applied in calculation example of positive buried pipe to educe the distribution of circumjacent soil pressure and stresses on cross section and to compare it with that calculated by conventional ways before those outcomes are applied in engineering case of positive buried pipe with flexible filled materials to confirm distribution of soil pressures after the measure for reduction and to compare it with measurements. as a result, the model set up in this paper is proved to be applicable after all above - mentioned analyses

    本文基於彈性理論和有元原理與方法,分析了埋式地下管道橫向學計算方法和性狀並探討了埋式地下管道的減荷等問題: ( 1 )在分析現有幾種典型的管道垂直土計算方法的基礎,探討了影響垂直土的主要因素以及改進的方法; ( 2 )分別通過彈性理論分析法和結構學的方法,建立了地下管道柔性圓環和剛性管涵的橫向靜計算方程,並應用在算例中,把所得結果和有元方法所得結果進行對比分析; ( 3 )考慮填土、管道和基礎的共同用、土體的非線性特性、初始應場以及土體和管道的接觸面因素的影響,利用有元的思路,建立了地下管道橫向學有元計算模型和方法,並且採用大型有元分析軟體ansys ,針對埋式管道程算例,得出了管周土以及管道橫截面應的分佈狀況和規律,並和理論值進行對比;針對施加柔性填料的埋式管道程實例,得出了減荷后的土分佈,並和實測值進行了對比。
  5. The equation of the pressure of scroll chambers 、 the force of axis 、 the force of radial 、 the force of tangent 、 inertial force 、 the composition of forces and the inertial movement is given. a dynamic model of scroll compressor of combination profile is developed, based on the analysis of the movement of the moving parts. this can provide base of theory for dynamical balance design 、 intensity design and reliability analysis

    論文利用pro / e軟體建立新型組合曲線渦旋縮機動渦盤的三維實體模型,在此基礎根據受情況對動渦盤的渦圈進行了有元分析,探討動渦盤在過程中由於氣體用而產生的應與應變規律,為進一步完善動渦盤的設計提供了理論依據。
  6. Moisture, the voids and the density of the pavement are expected for many operators in the road department. in order to promote the application of gpr to detect pavement quality as quickly as possible, in this paper some research works were zone. the mainly research results includes the following aspects : ( 1 ) since the dielectric constants of pavement medium have important influence on radar detection results, dielectric properties of pavement layers materials are analyzed for the design of practical gpr system and field application

    目前探地雷達在公路的應用還主要局於路面結構層厚度的檢測,對路基路面物理學指標的無損檢測被廣大公路者寄予厚望,這一技術的應用還有很多的要做,為了使其早日應用於實際,實現探地雷達對路面含水量、空隙率和實度的快速無損檢測,本文具體做了以下的一些: ( 1 )鑒于介電常數對探地雷達檢測的重要影響,對路面結構材料的介電特性進行深入分析,為路用探地雷達的實際應用測量提供理論依據。
  7. First, the working principles of the combustion control system of marine main boiler in present use and its disadvantages are discussed in the paper ; in the light of the structure and motion traits of marine main boiler, the combustion control systems of single and double cross amplitude limits are designed. at the same time, the schematic diagram of system and recovery curves of some relative parameters are given, the system working principles and its advantages and disadvantages are discussed. based on the combustion control system of dual - crisscross amplitude limit, by selecting the independent variable, the fixed offset is improved into variable offset, the combustion control system of variable offset dual - crisscross amplitude limit is designed

    首先討論了目前船用主鍋爐燃燒控制系統的原理及存在的不足;針對船用主鍋爐的結構及運行特點,設計了單交叉幅燃燒控制系統和雙交叉幅燃燒控制系統,同時給出了系統原理圖及有關參數的過渡過程曲線,討論了系統原理及優缺點;在雙交叉幅燃燒控制系統的基礎,將固定偏置經過自變量的選取,改進成變偏置,設計了變偏置雙交叉幅燃燒控制系統,給出了系統原理圖及有關參數的過渡過程曲線,同時也給出了空氣和燃油流量正負偏置函數與變偏置折線函數的關系式。
  8. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究程區高外水及高地應分佈規律及巖體特性的基礎,建立起高地應、高外水用下隧洞圍巖結構非線性有元模擬計算模型,然後考慮隧洞的開挖過程、水荷載的用歷史,通過計算分析得出了不同洞徑、不同的灌漿圈滲透系數和不同的灌漿圈深度以及不同開挖過程與圍巖及支護結構的應、位移和塑性區的關系。
  9. The analysis in this paper have been verified by experiment firstly, the structure and mechanical characteristics of sliding - plug door are described in this paper. secondly, on the base of the study of the work condition and limited load, the dynamic load - time curve is created. and then the finite element model of sliding - plug door is built by using material equivalent

    本文首先總結和探討了塞拉門的結構特點和學特性;然後探討了塞拉門的極況,即列車交會波的用形式,建立了簡化的用於塞拉門的動學載荷曲線;其次研究了復雜形狀復合材料層合板結構的建模方法,採用物理等效方式減小了計算規模,建立了復合材料門板的有元模型,並對各種設定的載荷形式進行了數值模擬。
  10. At the base of participating in the system design and debug of the dy - 500 hip - sinter low - pressure and vacuum sinter stove which is investigated by the zigong horniness - alloy ltd. this paper conclude the practice and work, according to the sense and the embed analysis, this paper including : aim at hip - sinter stove, analyse technics principle of the dewaxing, the vacuum sintering and the hot isostatic pressing by low pressure

    在參與自貢硬質合金有責任公司研製的dy - 500型低真空燒結爐自動控制系統設計和調試的基礎,本論文對實踐進行了總結與提高。根據現場經驗和深入分析,論文的主要內容有:針對低真空燒結爐,分析脫蠟、真空燒結、低熱等靜藝原理,並論述了溫度、真空度、三個主要因素對生產過程的影響。
  11. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋線型比圓弧形為邊坡的假設滑裂面具有較多的程優點,並為此編制了一個採用極平衡法分析土釘支護的fortran語言程序,以此具對滑裂面的后移、土釘錨固段的超長、土釘總的大小等方面了研究,得出了有關土釘的長度與邊坡的坡角、坡高、土體學參數的關系、土釘總與庫侖土間的關系等結論;採用大型通用有元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸分佈規律、開挖方式及原始邊坡形態對土釘的軸的影響、下階邊坡在土釘軸方面的相互用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬度的合理確定、二階開挖及支護比一階時具有較多的程優點等結論;通過土分析對朗肯、庫侖兩種經典土理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應分佈、面板背土的分佈形態了研究,得出了邊坡支擋土受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷拱的存在對面板受有利等結論。
  12. Present the experimental research carried out on strain and stress by applying the resistance strain surveying technique to the big hole sealed heads in the new fire - tube heating boilers with the laws of strain and stress distribution obtained and allowable working pressure given because there is no applicable standards or specification for calculating the strength of crude oil heating boiler heads perforated by densely distributed big - holes, which, to a certain extent, hampered the further development of crude oil heating boilers in china, and concludes from experimental results that strain and the stress of circumference are fairly large near the edge of big - hole, and the cross ribs enhance strength of sealed head to a certain degree

    油田火筒加熱爐密集大開孔封頭的設計計算,因沒有相應的強度計算標準在一定程度制了我國油田火筒加熱爐技術的發展.採用電阻應變測量技術,對新型火筒加熱爐大開孔封頭進行了應應變試驗研究,得到了封頭的應變和應分佈規律,給出了大開孔封頭允許的.試驗結果表明,大孔邊緣圓周處應應變較大,十字筋板對封頭有一定加強
  13. The distance from figure center of the parabola to the potential slide surface is less than half of the section length. mechanical conditions of this method include not only force equilibrium but also moment equilibrium. as for the beam - on - foundation, its pressure can be calculated by homogeneous hypothesis or winkler foundation hypothesis or infinite half elastic foundation hypothesis on the pulling anchor - cable step and by coulomb active earth pressure theory approximatively on the long term working step

    對于樁在滑面以段所受的坡體荷載,提出可按形心偏下的拋物線型分佈模式計算,並在滿足的平衡條件的同時還滿足矩平衡條件;對于地樑用的坡體荷載,提出在錨索張拉階段可按均布或溫克爾( winkler )地基假定或彈性半無體地基假定來計算,在階段則一般可以近似按庫侖主動土理論計算。
  14. Chemtrol ? warrants each chemtrol pressure - rated pipe, valve, and industrial plastic fitting to be free from defects in materials and workmanship for a period of one ( 1 ) year from the date of purchase under normal use and service within limitations recommended by it

    保證每個chemtrol額定管道,閥門,和業塑料連接件,在材料和製造沒有缺陷,保證期為在建議的范圍內正常使用和下,從購買之日起,壹( 1 )年。
  15. Slope pressure on the beam - on - foundation can be calculated by winkler foundation hypothesis or infinite half elastic foundation hypothesis on the pulling anchor - cable step and by coulomb active earth pressure theory approximately on the long term working step. in addition, calculation methods of internal force of prestressed anchor - cable beam - on - foundation are provided

    對于用於地樑的坡體荷載,提出在錨索張拉階段可按winkler地基假定或彈性半無體地基假定來計算,在階段則一般可以近似按庫侖主動土理論計算。
  16. Generally, under the situation of steady tested pressure, the maximum working pressure shall not exceed 2 / 3 of the upper limit value of the instrument ; while in measuring pulse pressures, the maximum working pressure shall not exceed 1 / 2 of the upper limit value of the instrument ; and while in measuring high pressures, the maximum working pressure shall not exceed 1 / 3 of the upper limit value of the instrument

    一般在被測穩定的情況下,最大不應超過儀表值的2 / 3 ;測量脈動時,最大不應超過儀表的1 / 2 ;測量高時,最大不應超過儀表的1 / 3 。
分享友人