庫容 的英文怎麼說

中文拼音 [róng]
庫容 英文
[水文] storage [reservoir] capacity; capacity of reservoir
  1. Two spider silk protein genes ( avfl and avf2 ) screened from the library are characterized in a lot of repetitive motifs, a high guanosines or cytidines content, a strong preference for adenosine or thymidine in the third position of a codon and rich residues of glycines or alanines in the proteins translated

    試驗結果,該文庫容量為4 . 9 10 ~ 6 。從文中篩選到avf1和avf2蛛絲蛋白新基因,具有典型重復序列多, g c含量高,密碼子第三個堿基偏愛使用a t及編碼蛋白中含有大量gly和ala殘基等特點。
  2. A murine phage antibody library containing 1. 710

    成功構建一庫容量為1 . 710
  3. Look from the vertical section plane, project two have not the delta conformation of fill up. project one lost the effectual contains of reservoir. in opposition, project two lost the dead contains. during the experiment of the local former in front of the dam, the quantity of the sandiness out the reservoir appears that lot of sandiness passed the bottom hole and little passed the electricity plant and the water gap

    方案二與初設方案運用對比,方案二淤積總量明顯減少,從淤積縱剖面看,方案二無明顯三角洲淤積形態,而初設方案運用30年淤積形態具有明顯的三角洲淤積形態,從庫容變化看,初設方案運用主要損失有效庫容,而方案二則相反主要損失死庫容
  4. The vascular bundle has a similar spikelet number load and sink load in the hphr and shanyou 63

    重穗型組合的維管束穎花負荷量、總庫容負荷量均與汕優63相當。
  5. In using the fuzzy optimization, the paper separately computes the subordinative degree of the storage capacity that is opposite to the main high - water season in every stages, and then, determines the present storage capacity

    在模糊演算法中分別計算各個時段相對于主汛期防洪庫容的該時段的庫容隸屬度,然後確定該時段的庫容
  6. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵口工程龍口水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港洪水、計算時段的變化、多口門、多庫容、多水閘)的龍口水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍口水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍口水力計算,為堵口合龍提供科學依據。
  7. At the signing ceremony, dr liao said, " the cooperation agreement will help hong kong to properly handle dredged materials in the long run and to better utilize inert c & d materials, thus relieving the pressure on our marine dumping grounds and fill banks. this is of great importance to the sustainable development of guangdong and hong kong.

    在簽署儀式上,環境運輸及工務局局長廖秀冬說: 《合作安排》將有助香港妥善處理疏浚廢棄物和善用惰性拆建物料,以紓緩香港海上卸泥場及填料庫容量不足的壓力,對促進粵港的可持續發展,有十分重大的意義。
  8. These measures include : rehabilitation of vegetation with preserving soil and water on the eroded infertile soils, the entrance to “ soil reservoir ” dredged by controlling with different eroded soil types, using “ soil reservoir ” of the upper reaches of the yangtze river bigger much more than the reservoir of the three gorges

    充分調用「土壤水」實現長江流域防洪減災的措施應包括建立保土保水的地表植被系統,分類整治侵蝕劣地土壤,疏浚入滲「土壤水」的通道,以及重視調用一個比三峽水庫容大得多的「土壤水」 。
  9. It divides the main vegetation of the headwater region of huangpu river into 4 categories based on field survey and observation and methods of factor analysis and systematic cluster analysis and according to the degree of soil and water conservation function : deciduous trees and shrubs are category 1 which shows very strong soil and water conservation function ; tea plantation, grasslands and pine trees are category 2 which has stronger function ; the category 3 is moso bamboos and broadleaved evergreen trees which have stronger permeability and erodibility, but the permeable performance is not outstanding, the capacity of soil moisture storage common and soil and water conservation function moderate and ; the category 4 is uncovered land where the soil and water conservation function is very weak and its permeability, erodibility, erosive resistance and soil moisture storage capacity are all notably smaller than that of the other lands

    摘要在野外調查、實測的基礎上,採用因子分析、系統聚類分析的方法,根據土壤層水土保持功能的強弱,將黃浦江源區主要植被類型分為4類:落闊林、灌木林為第一類,表現出很強的水土保持功能;茶園、草地、松林為第二類,土壤水土保持功能較強;毛竹林、常綠闊葉林表現出較強的抗蝕性和抗沖性,但滲透性能並不突出,土壤貯水能力也一般,水土保持功能中等,為第三類;裸露地水土保持性能很差,單獨作為第四類,其滲透性、抗蝕性、抗沖性、土壤水庫容都顯著小於其他各樣地。
  10. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境內的岷江河段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,庫容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  11. When the model is applied to a historical dam - break flood, the computational results agree well with hydrographic station records and flood tracking investigation

    依據水量平衡原理及水流連續性條件,建立了支流蓄泄庫容關系和支流倒回灌數學模型。
  12. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取水工程的布設要考慮工程所處河段的地質水文等諸多因素。如該河段上下游水庫容,泄水流量、河道沖刷、淤積、河床形態、水流形態、冰塞、河段上游的支流匯入、洪峰、沙峰的大小、河道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  13. For the reasons of accumulated soils and sands and the amount of precipitation, the volume in the reservoir is dynamic. if the volume in the reservoir is not dispatched correctly, it will result in the overflowing of the dam bank of the reservoir, even in the collapsing of the darn

    庫容又是水調度不可忽視的問題,而庫容又與水的橫、縱斷面、水位、水深有關,由於泥沙淤積、降水量多少等原因,水水量是動態的,不對水水量正確調度,會在大洪水時,造成水堤壩漫溢甚至垮壩。
  14. The application to qingjiang cascade hydropower plants shows that the proposed model can give the controlling rules for optimal dynamic flood storage and elevates the efficiency of reservoir system management and utilization of flood water

    該模型應用於清江流域梯級水,計算結果表明,在不降低水及梯級原有的防洪標準前提下,能有效利用上游水布埡水的防洪庫容,分擔隔河巖水部分防洪任務,並顯著提高梯級水發電量。
  15. Effect of tributary reservoir capacity on flood risk in protected area

    支流防洪庫容對防洪區的洪災風險影響研究
  16. Aim at ubiquitous parallel multi - reservoir structure in our country ' s basin, the universal objective function including coefficient bi embodying a spatial significance difference at different flood control points and variable ai denoting a selection of scheduling mode is established, which provide a valid intervenor interface for flood control consultation decision. according to the real - time requirement, a model of reservoir storage allocation is proposed, which embody basic idea of phasic compensation. passing the dynamic correction to cut down the disadvantageous influence that indetermination result in on the certain degree, joining together the step alternation solving method, this model can maximally consider bias of decision makers, ensure the rationality and practicability of the solutions

    針對我國流域中普遍存在的並聯群結構,論文提出包含不同防洪點重要性的系數_ i和選擇調度模式的變量_ i的通用目標函數,為防洪會商決策,提供了有效的人工干預介面,根據實時性要求提出動態分配防洪庫容庫容分配方法,體現了相機補償的基本思想,通過動態修正在一定程度上可以削減不確定性造成的不利影響,結合分步迭代求解技術,能最大限度體現決策者的偏好,保障解的合理性和可操作性。
  17. But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time

    從長春市供水系統長期規劃和目前供水現狀研究得出,在目前和今後的長時期內長春市供水系統的供水能力總是大於實際用水水平。這種長期存在的差別對松花江供水只意味著減少抽水量。但對水工程供水系統則可挑選運行費用低的、入水量較多的某個水,利用這種增加的調節庫容多調節出一些水量,以替代運行費用較高的供水工程的供水。
  18. Preliminary studies suggest that the mutual relations of the security, economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction, the concepts on the cascade exploitation of the river should be transferred from flood control to flood management, the design flood standards for construction at the initial, middle and later stages of high dam projects should be driven up gradually according to reservoir capacity

    初步研究認為,在施工洪水設計標準選擇時,應處理好安全、經濟和風險相互之間的關系,以達到三者有機的統一;在梯級開發河流上應實施從施工洪水控制到施工洪水管理的觀念轉移;高壩大工程的初期、中期、後期三個時段的施工洪水設計標準應根據庫容等指標逐步抬高。
  19. Upon completion it would have a capacity of 37. 3 billion gallons. this was 3 times the total capacity of all the existing reservoirs

    建成后水庫容量達373億加侖,為當時全港各水塘總量的三倍。
  20. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽水泥沙淤積入手,分析水泥沙淤積特性和區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄庫容、造成同級流量下水水位抬升水回水上延、對沿岸及過河建築構成影響、因水位抬升致使區周邊灌區地下水排水不暢乃至倒灌而造成土地鹽堿化、對水區大量淤積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出區圍墾堤是水水位抬升的重要原因。
分享友人