庫水位 的英文怎麼說

中文拼音 [shuǐwèi]
庫水位 英文
reservoir level
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 水位 : stage; water level
  1. In order to reduce the re - deposit volume of the dredged channel, the method must be based on decreasing the oncoming sediment, changing the mouth site, builting the sediment control dam and raising the reservoir level

    為了最大限度地減小疏浚挖槽的回淤量,必須依靠控制上游來沙量、調整入口門置、加設防淤堤及提高庫水位等手段,而不能通過調整挖泥槽寬度、置及數量等措施來達到目的。
  2. Calculation of water surface profile for earth dam with core wall during level fall of reservoir

    庫水位降落期心墻土壩面線計算
  3. He has less money on hand than even the maverick texan libertarian ron paul, and has been forced to lay off dozens of his staff of 120

    這使得麥肯恩的金庫水位比獨立參選人- - -德克薩斯州無黨派人士朗保羅還低,也迫使他對其120人的競選參謀軍大舉裁員。
  4. ( 5 ) the maximum water level risen by the enclose tideland cultivation around the reservoir is 0. 66m, the responding quality is 2000mvs, which heavily effect the environment around the reservoir. the reservoir " s water level is risen because cross section and flood canal become narrow, which caused by building dam, this makes groundwater unsmooth, drainage, even flow from a lower to a higher space and soil salinized

    66m ,且為2000m 』兒的常年洪,對區周邊環境的影響較大,因打壩築堤縮小過斷面和行洪通道造成庫水位進一步抬升,致使區周邊灌區地下不暢,乃至倒灌,型成士地鹽堿化。
  5. This paper, in the light of the special geological environment and actual project situation of the three gorges reservoir area, puts forward a comprehensive analysis and evaluation system suitable for the stability analysis of the bank landslide of the three gorges reservoir area under the premise of thorough consideration of the water influence on the stability of the bank landslide, and obtains the following achievements in several aspects that have the practical application significance and certain scientific research value : ( 1 ) it is discovered that the water activity is the primary factor of the formation of the new landslide and the revival of the ancient landslide. on the one hand, the rising underwater level reduces the actual stress of landslide ; on the other hand, the long time soaking of the underwater reduces the mechanics intensity of the landslide and the slide belt, both of which reduce directly the landslide stability ; ( 2 ) in view of the special condition of the three gorges reservoir area, this paper analyzes systematically the forces acted on the landslide of the three gorges reservoir area and the force varieties acted on the divided landslide when the water level changes between 175 meters and 145 meters. thus it is more scientific and comprehensive for the analysis of the forces acted on the landslide ; ( 3 ) this paper summaries systematically 10 kinds of typical computation projects by organic combinations of different kinds of situations in the dry season ( nature statue ), rainy season ( rainstorm or rains for a long time condition ), with 175m water level in the reservoir, during the earthquake, with the water level of the reservoir adjusted from 175m to 145m and so on, and produces

    本文針對長江三峽區特殊的地質環境與工程實際情況,在充分考慮岸滑體穩定性影響的前提下,提出了一個適用於長江三峽岸滑坡體穩定性分析的綜合分析評價體系,並取得了如下幾個方面具有工程實際意義和一定科學研究價值的研究成果: ( 1 )研究結果發現,的活動是新滑坡形成或古滑坡復活的主要因素,一方面是由於地下升高降低了滑坡體的有效應力,另一方面是由於地下的長期浸泡降低滑體及滑帶的力學強度,這兩方面的因素均將直接降低滑坡的穩定性; ( 2 )針對三峽區的特殊條件,系統分析了作用於三峽區滑坡體上的力系和庫水位在175m與145m間變化時滑體條塊的受力變化,從而使對作用於滑坡體上的力系分析更科學、更全面; ( 3 )通過對滑體處于旱季(天然狀態) 、雨季(暴雨或長期降雨狀態) 、 175m庫水位、地震以及庫水位由175m調節下降至145m等各種不同情況的有機組合,本文系統地歸納總結出了10種典型計算工況,並具體給出了相應的作用荷載的計算方法,使在區岸坡滑體穩定性分析評價時對計算工況選擇及其作用荷載的計算更具規范性; ( 4 )具體運用c + + builder開發了關于滑坡體穩定性綜合分析評價系統,使對滑坡體穩定性分析計算更方便、更準確; ( 5 )將上述滑坡體穩定性綜合分析評價系統應用於重慶市豐都縣名山滑坡穩定性分析的具體事例中,分析結果表明,本文所提出滑坡體穩定性綜合分析評價方法對三峽區的滑坡穩定性分析是實用可行的。
  6. The inner factors refer to the mechanical behavior such as the rock type, density, construction parameter, etc. and the outer factors refer to the foundation condition, geological condition, valley shape, rise and fall of water level, seepage due to respiration

    內因是指堆石料的巖質巖性、密實程度、施工參數等組成壩體的各種力學性質;外因是壩址所處的基礎條件和兩岸的地形地質等條件、河谷形狀、庫水位的變化、降雨浸潤等因素。
  7. Based on the study of the engineering geological conditions, using fem method to calculate the baseground stress distribution of bridge pier and analysis the stability of slope under different conditions, such as, reset condition, under the bridge load and affected by the changing reservoir water level

    在對橋址區工程地質條件研究的基礎上,採用有限元法方法計算了橋荷載施加前後及庫水位變動情況下橋址區斜坡應力分佈特徵,並對斜坡穩定性進行了分析。
  8. When the three - gorge reservoir is sluiced, the underground water level will ascend obviously and mechanics parameters of the slip strip below the reservoir water level can drop further, sidaogou landslide can lose stability wholly in controlled condition influenced by buoyancy of underground water and saturation stress at water level dropping

    三峽后,滑體內的地下將明顯抬高,以下的滑帶力學參數會進一步降低,受滑體內地下揚壓力及庫水位降落時滲透壓力的影響,四道溝滑坡在控制工況下可能整體失穩。
  9. In the project, the water level will lift 17 meters, which will maybe make it possible to trigger bigger earthquake

    二期工程中,庫水位將提高17米,的提高可能誘發更大的地震。
  10. When the water situation of any river or lake approaches the guaranteed water level or the safety flow capacity, or when the water level of any reservoir approaches the level of design flood, or when a great danger occurs to flood control works, the flood control headquarters under the relevant people ' s government at or above the county level may declare an emergency flood season

    當江河、湖泊的情接近保證或者安全流量,庫水位接近設計洪,或者防洪工程設施發生重大險情時,有關縣級以上人民政府防汛指揮機構可以宣布進入緊急防汛期。
  11. ( 2 ) the water level ascending value effected by enclose tideland for cultivation dyke is reverse proportion to flows below 2000m ' / s, water level has surpassed the top of dam when flow is above 2000m3 / s, water level ascending value is declassing in the same flow level caused by enclose tideland for cultivation dyke

    ( 2 ) 2000m ~ 3 s以時,圍墾堤影響的庫水位抬高值隨流量增大而增大差逐漸減少,在2000m ~ 3 s以上時,已經超過圍墾堤堤頂,圍墾堤所引起的同級流量下抬高值逐漸減少。
  12. Another hidden danger is the weakening of the impervious ability of the dam resulting from the closeness of the height of line seepage of the reservoir water level to the contact plane between the residual solum, talus solum and basement rocks

    庫水位浸潤線標高和殘坡積土與基巖接觸界面標高較接近,而使此高程的防滲能力更加薄弱,這也是此壩體的隱患之一。
  13. Effecting of enclose tideland for cultivation on water level in the same flow level are quantitatively analyzed, the main achievement and suggestions are given as follows : ( 1 ) the water level rise is the most which effected by enclose tideland for cultivation dyke when flow is 2000m3 / s, the max water level difference in case of enclose tideland for cultivation dyke or no arrives 0. 66 m

    定量地分析了圍墾堤對同級流量下的庫水位的影響,主要成果結論及建議如下: ( 1 ) 2000m ~ 3 /時區圍墾堤對庫水位抬升最大,有無圍墾堤庫水位差最大達到0 . 66m 。
  14. Sichouchang slope is also probably to destroy though its stability is better than that of laofangzi slope

    絲綢廠滑坡相對于老房子滑坡穩定性略好,但在庫水位驟降的情況下也有可能整體失穩。
  15. During the process of modeling, three conditions of reservoir water level ' s ascending, slowly descending and sharply descending are considered

    模擬過程中分別考慮了庫水位上升、庫水位緩慢下降和庫水位驟降三種工況條件。
  16. Then the stability of typical slopes in different conditions such as servoir water level ' s ascending, slowly descending and sharply descending are evaluated and forecasted by means of the limiting balance method and the numerical simulating method ( flac )

    利用極限平衡法和數值法( flac )對區內的典型斜坡在庫水位上升、庫水位緩慢下降和庫水位驟降等不同工況條件下的穩定前景做出了合理的評價與預測。
  17. Qualitative analysis on the effect of flood control and engineering safety -, seizing lots of water conservancy effective adjust storage. then making water level risen and reservoir backwater enlarged in the same flow level ? effect on beach and the buildings across river, soil salinization caused by flow from a lower to a higher place and unsmooth groundwater drainage destroy of travel resource caused by disorder enclose tideland for cultivation in reservoir silt up flood plain are given, then presents enclose tideland for cultivation dyke is important cause which water level rise in reservoir

    本文從青銅峽泥沙淤積入手,分析泥沙淤積特性和區圍墾堤開發利用淤積灘地的現狀,對防洪安全及工程安全的影響、侵佔大量的有效調蓄容、造成同級流量下庫水位抬升上延、對沿岸及過河建築構成影響、因抬升致使區周邊灌區地下不暢乃至倒灌而造成土地鹽堿化、對區大量淤積灘地無序圍墾造成旅遊資源破壞等五方面影響的定性分析,提出區圍墾堤是庫水位抬升的重要原因。
  18. When the water level changing of the three george reservoir in the future, the slope stability will further fall

    同時,考慮到未來三峽庫水位變動的影響,其穩定性將進一步發生改變。
  19. Fluctuating reservoir levels have even been blamed for a bizarre plague of rats that farmers have been battling in central china ' s hunan province

    庫水位的波動也被認為是湖南省農民所遭遇奇特鼠災的根源。
  20. At the same time, many peasants in the three gorges region say the number of landslides is increasing as water has slowly risen in the reservoir behind the dam

    同時,許多住在三峽地區的農民說由於大壩庫水位的慢慢增高,塌方的數量也在增加。
分享友人