廠用發電機 的英文怎麼說

中文拼音 [chǎngyòngdiàn]
廠用發電機 英文
house generator
  • : 廠同「庵」 (多用於人名)
  • : Ⅰ動詞1 (使用) use; employ; apply 2 (多用於否定: 需要) need 3 (敬辭: 吃; 喝) eat; drink Ⅱ名...
  • : 名詞(頭發) hair
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : machineengine
  1. Unlike edison ' s new york plant which used steam power to drive its generators, the appleton plant used the natural energy of the fox river

    不同於愛迪生的紐約蒸汽來推動,愛波頓使狐貍河的自然能源來
  2. It ' s insulation product are widely used by many of the leading manufacturers of engines, dynamotor, motor and metallurgy in china

    幾年來,工已先後為鐵路內燃和車、大型礦車、、變壓器、爐等提供了大量的絕緣材料,滿足了戶的生產需要。
  3. This paper analyse the feasibility and necessity of examine and repair about the qiangui co. ltd of generate electricity base on the frmework of guizhou wire network and the run state and exerience of the factory. at the same time, in the base of the lucubrate and analyse of stats examine in domestic and abroad, this paper has analyse the abrupt librate of steamer generator by online data check in pancountry power plant. it acquire obvious effect and prove the applicability and feasibility about the examine in power plant by take correspond measures to ensure the normal operate of the set

    本文根據貴州網的結構形式以及黔桂有限責任公司組的運行狀況和經驗,進行了黔桂有限責任公司實行狀態檢修的可行性和必要性分析,同時在深入研究分析國內外狀態檢修技術基礎上,對盤縣汽輪組突振動事例在線檢測數據進行分析、採取相應措施處理,使組正常運行,取得了明顯的成效,同時也證明點檢與狀態檢修在火的適性和可行性。
  4. By analyses and compares, the conclusion is that it would be better to choose high resistance grounding of distribution transformer for hydro turbine in hydro power station. there is no certain conclusion for steam turbine in fossil - fired power plant. getting a clear answer to choose good generator grounding mode still needs practice and time

    經分析比較認為,在水站水輪組宜選接地變高阻接地方式;在火和熱汽輪組,選何種接地方式,給出明確的結論尚需理論和實踐的進一步深入。
  5. In chapter 3, the subgrid eddy - viscosity model for large eddy simulation is applied to calculate the three dimensions unsteady periodic turbulent flow in yantan francis turbine. the pulsating characteristics of some main physical parameters in flow field are found. the calculated axial water thrust of hydraulic turbine agrees with the model - test value

    第三章採大渦模擬亞格子渦粘模型,對巖灘混流式水輪的流場進行三維非定常湍流分析,得到了流場中各物理量的脈動特性,計算出ms的軸向水推力與模型試驗值大小相當;同時論證了對于下架承重的混流式水輪組可採其推力軸承負荷作為水房振動的最大垂直激振荷載。
  6. The main cost of thermal power plant chiefly is the coal consumption, and the operating cost of ball mill is only the one small part. it is not necessity to do risk and sensitivity analysis

    火力成本主要是煤耗,球磨的運行費只是中的一小部分,所以本文沒有做風險分析和敏感性分析。
  7. And the developed the electric turbine driver equipment has been successively used in the li - jia mountain power plant and the xiao - langdi power plant to drive turbine

    研製出的盤車裝置在李家峽、小浪底成功對進行了動盤車。
  8. Based on the vibration test in yantan hydropower house, in this paper the author adopt les method which belong to three dimensions unsteady turbulent flow numerical analysis to simulate vibration resource characteristics of hydrogenerator set, a harmonic vibration model of powerhouse substructure is put forward to carry out firstly a precise modal analysis and dynamic response analysis for generator floor. the numerical calculation results agree well with the surveyed data in situ

    本文結合巖灘水房振動的試驗研究,採非定常湍流數值分析的大渦模擬方法進行混流組水力振動振源模擬;提出一種水房下部結構簡諧振動模型,首次進行了層樓板結構的精確模態分析和水力激振荷載下的動力響應分析,各項計算結果與實測數據吻合良好。
  9. In chapter 4, the model - building principle and calculating method of finite element dynamic analysis for large - sized assembled structure are discussed. the substructure model for hydropower house vibration analysis is established to obtain precise modal of generator floor. the harmonic vibration assumption is adopted to calculate house structure ' s dynamic response from hydraulic excitation force of hydraulic turbine generator unit

    第四章討論了大型組合結構有限元動力分析的建模原則和計算方法,建立水房振動分析的下部結構模型,對巖灘房進行整體模態分析,較準確地得出層樓板自振特性;同時引進簡諧振動假定,迸行了組水力振動作下的房結構的動力響應分析。
  10. 4. flaw because the exhausting black smoke s temparature we use on spare generator is lower, granular pollutant s emmision capacity is large, and is easy to get granular pollutant jamming on channels. it will need to disassemble parts and take back to original factory for regeneration at uncertain time, and it can not improve effectively hc and co in exhaust smoke

    4 .缺點:使於備載排煙溫度較低,因此粒狀污染物排放量大,容易將粒狀污染物堵塞于通道上,須不定時拆卸回原再生,且無法有效改善排煙中碳氧化合物( hc )及一氧化碳( co ) 。
  11. 4. flaw because the exhausting black smoke s temparature we use on spare generator is lower, granular pollutant s emmision capacity is large, and is easy to get granular pollutant jamming on channels. it will always need to disassemble parts and take back to original factory for regeneration, and it can not improve effectively hc and co in exhaust smoke

    4 .缺點:使於備載排煙溫度較低,因此粒狀污染物排放量大,容易粒狀污染物儲塞于通道上,須一時拆卸回原再生,且無法有效改善排煙中碳氫化合物及一氧化碳。
  12. Aiming at the problems in the field of the government for hydraulic turbine, this thesis applies the technology of programmable controller to the speed control of hydroelectric generators in hydropower station. a digital regulating system based on the fx2 programmable controller for the water - gate and paddle of hydraulic turbine is developed. first, the turbine regulating system is briefly introduced and the mathematics model of the system is derived

    本文針對當前我國水輪調速器領域技術現狀,將可編程式控制制器技術應於水組的轉速控制,提出了在應可編程式控制制器實現導葉控制系統的基礎上,以可編程式控制制器實現導葉、輪葉雙調整控制系統,並參與研製了以fx2可編程式控制制器為核心的水輪雙調節控制器,樣的實際運行良好,系統的軟硬體設計得到驗證,結果令人滿意。
  13. Fire protection, and surveillabce works as follows : electrical : 22. 8kv ; 27, 800kva ; three loading centers located in the power house, factory, and office building ; generator 2 800kw

    氣: 22 . 8kv供設備容量三處負載及配中心分佈於動力室與容量2800kw ,供緊急負載使本配系統處使數字式驛及表,符臺現代化之力監控新潮流。
  14. Powerformer is a new high voltage generator , which use xlpe cable as stator winding instead of rectangular conductor bars , thereby it overcome the shortcomings which the shape of these conductors results in an uneven electric field distribution with high electric field strenghs at the corners especially and prevents the output voltage of the conventional generator from exceeding about 36kv powerformer offers a direct connection to the network without the need for a step - up transformer as a consequence, there are some merits in the total plant equipped with powerformer, such as high effiency, high availability, low maintaining cost and giving less environmental impact

    Powerformer是一種新型的高壓,它採纜代替矩形導體作為定子繞組,從而克服了矩形導體場分佈不均勻,特別是在矩形導體在導體拐角處場過于集中而使常規的輸出壓等級不能高於36kv的缺點,使其能夠直接和輸配網相聯,這樣就不需要升壓變壓器,同時也使裝配powerformer的具有如下優點高效率、可利率提高、維修費降低和降低了對環境的負面影響。
  15. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪組的科學研究。
  16. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算科學管理;大壩混凝土澆築方案及主要施工械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪組的科學研究。
  17. ( 2 ) a new method for on - line forecast and analysis of the insulation safety of large generators is found by combining the topology construct of the electric network in power stations with the electromagnetic relationship inside large generators and using the field - circuit analysis theory

    ( 2 )運場路綜合分析理論,將氣網路拓撲結構與大型組內部磁關系相結合,提出了一種於大型絕緣安全在線預測分析的新方法。
  18. This thesis measured the vibration signals of 1 # and 2 # running turbine - generator sets in a generating plant and their vibration signals that are indispensable to the study are gained. firstly, the low frequency faults of machine stand in generator side, rotor unbalance, misalignment, oil whirl, oil whip are diagnosed by fft analysis. secondly, applying wavelet theory to probing the instantaneous abnormal phenomena of the signals and to show their components

    首先應fft分析診斷出1 #和2 #汽輪組存在的座松動、轉子失衡、不對中、油膜渦動、油膜振蕩等故障,再運小波分析探測信號中的瞬態反常現象並展示其成分,比較精確地診斷出了該運行中的1 #和2 #汽輪組存在的碰摩故障。
  19. Although existing legislation in hong kong does not prescribe a minimum distance between town gas production plantspower plants and residential premises, the established systems for selecting sites for development of such plants, and for planning land uses in the vicinity of " potentially hazardous installations " ( phis ) already serve to protect public health and safety

    雖然香港現行法例沒有為煤氣製造與住宅的距離設定下限,但政府就選址興建這類房和規劃具有潛在危險的裝置(下稱潛在危險裝置)附近土地的使,已制定了一套制,這套制可以保障公眾健康和安全。
  20. This paper explores the application of laminated air condition technique of high space through the model experiment of stratification air condition in the powerhouse of three - gorges hydropower station

    本論文結合三峽站主層分層空調熱態模型試驗,對高大空間分層空調技術的應進行研究。
分享友人