扎筋 的英文怎麼說

中文拼音 [zhājīn]
扎筋 英文
rod placement
  • : 扎動詞[書面語] (拔) pull out
  • : 名詞1 (肌的舊稱) muscle2 [口語] (肌腱或骨頭的韌帶) tendon; sinew 3 [口語] (可以看見的皮下靜...
  1. I took out a tight wad of dividend warrants ringed with a rubber band, and the records in the wad would have gladdened the heart of a broker

    我拿出一迭用橡皮緊的股息單,記在這迭單子上的數字原本會使一個經紀人非常開心的。
  2. Main tower pylon construction - steel fixing to infill pour

    建造主塔-鋼工序
  3. Lengzha to help steel ( licensed operation ), steel wiredrawing processing, steel wholesale

    帶助鋼(憑許可證經營) 、鋼拉絲加工,鋼材批發。
  4. Through analyzing the structure of open caisson, and according to sinking stress principle, the paper introduced in the open caisson construction process sinking, correcting error, survey control as well as peculiar circumstance processing technical measure, such as in open caisson construction the inner - mold for sanding, framework supporting and steel binding, and concrete casting ; in open caisson sinking - control the sand in edge foot inner - mold, sand - pumping sinking, and pressure hydraulic monitor breaking and pressure - blowing sinking by air pressure blower etc

    摘要根據下沉受力原理,分析了沉井結構,介紹了沉井施工過程中的下沉、糾偏、測量控制以及特殊情況處理的技術措施,如沉井製作中的填沙內模,模板支設和鋼,混凝土澆注;沉井下沉控制中的刃腳內模沙土,抽沙泵抽沙下沉,高壓水槍破壓、空壓機吹壓下沉等。
  5. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁,分底腹板和頂板分別綁並吊裝鋼骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  6. Beam side form shall be installed after all work inspected and accepted such as beam rebar work, cushion block laying, steel inserts installation, steel doweling and pocket molding bed, etc

    ,墊保護層墊塊,安放埋件、插、預留孔胎模等,經檢查合格后扣梁側模。
  7. Column rebars and cushion block work, install the steel inserts and wall binding rebar

    ,墊保護層墊塊,安放埋件、墻拉結
  8. At that time, i suffered unbearable pain and even lost my voice. i struggled on the edge of life and death and had nowhere to turn for help. although i prayed to master for help, i did not know where she was

    當時全身骨疼痛得很厲害,難受到無法忍受說話無聲,猶似在死亡邊緣掙一般,叫天天不應叫地地不靈,雖也求師父幫忙,不過不知師父在何方。
  9. Steel fixing for the construction of bridge deck of str20 near the wsd catchwater

    鄰近於長沙引水道進行橋編號str20橋面的鋼工程
  10. Main tower - pile cap construction steel reinforcement fixing works in progress

    主塔樁帽-鋼置工序
  11. The steel plate and pipe network infrastructure, but they should pay attention to the ministry of negative reinforcement plate to prevent fall into

    板的鋼網綁與基礎相同,但應注意板上部的負,要防止被踩下
分享友人