抽出水量 的英文怎麼說
中文拼音 [chōuchūshuǐliáng]
抽出水量
英文
pumped output- 抽 : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 抽出 : (拉出; 提取) draw out; select from a lot; extract; abstract; withdraw
- 水量 : water yield; the yield of water水量計[表] watermeter; 水量平衡 water balance; 水量收支 water budget
-
In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable
為了研究運木船舶在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用船舶基本原理,採用了迭代和累計的思想,將船舶的進水過程劃分為很多次進水的積累,詳細計算了運木船在破艙進水的過程中,考慮到各種破艙參數、船舶本身的下沉、艙室內木材、甲板貨的裝載情況和在進水過程中船舶本身的傾斜對進水重心的影響,以及艙室內的進水量和木材對破口處進水速度的影響,船舶總的進水速度、進水量、首尾吃水、穩性的實時狀態和最終船舶的總縱強度,給出了計算實例,並進行了在採取用泵抽水前後浮態參數的對比,得出了該船舶在艙室內的貨物積載量達到某個數值時可以保證船舶在破艙進水時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使船舶避免沉沒。When “ holding ” ( during normal operation ), non condensable, which are coming from air ingress and oxygen content in steam and condensate, must also be extracted normally by main ejectors
當「建立真空」 (正常操作下)時,空氣入口處的不可凝結物和蒸汽中的氧含量以及凝結水必須由主抽汽器排出。Fibrous raw material - determination of water solbility
造紙原料水抽出物含量的測定Fibrous raw material - determination of water solubility
造紙原料水抽出物含量的測定Using molecular imprinting method, the 1, 3 - dimethylxanthine theophylline, tho molecular recognition membranes, containing an segments as membrane formation sites and aa segments as functional sites, were prepared by the phase inversion technique. here, tho was selected as a template molecule. the hydrogen bonding between aa segments and the tho templates was measured by ft - ir and nmr. the tho templates can be removed from the membrane through washing with acetic acid aqueous solution. the permeation of tho through the membranes is far more than that of 1, 3, 7 - trimethylxanthine caffeine, caf, which demonstrated the function of tho molecular recognition of the membrane. the results also show that the increase of the tho templates concentration in the cast solution caused an increase of tho amounts taken into the copolymer membrane
Ft - ir及nmr測試結果表明:制備的高分子膜中, tho模板分子和膜中的丙烯酸功能殘基存在著氫鍵鍵合作用。大量的極性醋酸水溶液可抽出膜中的模板分子。 tho溶液和與模板分子具有相似結構的1 , 3 , 7 -三甲基黃嘌呤咖啡因, caf溶液的基質透過實驗結果:進入膜結構中tho分子的量遠大於caf分子,這表明制備的高分子膜具有tho分子識別功能。According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance
摘要根據工程實踐,提出了用全站儀直接測量平距、高差來代替測斜距、天頂距作四等及四等以下控制網測量的理論依據和方法,並以張河灣抽水蓄能電站施工控制網為例進行了比較計算。According to non - newtonian fluid mechanics theory and mathematical method, conbined with plunger moving property, the hypothesize fluid is imcompressive, hydraulic radius of flow of liquid in crevice is very little, and it is laminar flow, the flow is treated fixed continuous flow at every instant position of plunger, equation of motion and boundary condition were set up in condition of concentric and eccentric of pump barrel and plunger
運用非牛頓流體力學理論和數理方法,結合抽油泵柱塞運動特點,假設液體為不可壓縮的,液體在縫隙中流動的水力半徑很小,呈層流流動,柱塞在每一位置的瞬間,流動做定常流處理,建立了泵筒與柱塞同心和偏心兩種情況下運動方程和邊界條件,引入無量綱坐標、無量綱速度和柱塞與泵筒偏心配合時的縫隙高度,並給出縫隙流流速、流量的解析解。This article is based on statistic and analysis of the long - term observation data of the groundwater in the karst basin from 1987 to 2005 and systematically discusses the water level of karst groundwater, the pumping volume and the carved distribution regulation because of over - pumping water and puts forward some specific measures to reasonably development and utilization of groundwater resources
摘要通過覆蓋型盆地巖溶盆地中取水深井1987年2005年盆地地下水長觀資料統計分析,系統探討了宕溶地下水的水位、取水量以及抽水產生的塌陷分佈規律,提出了合理開發利用地下水資源的具體措施。The quantity of water that can be drained out is called the specific yield.
能夠抽出的水量稱之為單位給水量。But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time
從長春市供水系統長期規劃和目前供水現狀研究得出,在目前和今後的長時期內長春市供水系統的供水能力總是大於實際用水水平。這種長期存在的差別對松花江供水只意味著減少抽水量。但對水庫工程供水系統則可挑選運行費用低的、入庫水量較多的某個水庫,利用這種增加的調節庫容多調節出一些水量,以替代運行費用較高的供水工程的供水。Based on the results of testing site, some problems of vacuum preloading was analyzed by plane strain finite element method. the relative stable seepage velocity field can be produced with the pumping time. the depth of negative pore - water pressure transferring increases with the pvds length
最後,對真空聯合堆載預壓的施工工藝進行了研究,提出了在真空聯合堆載預壓的中期,出水量已相對較少,可適當減少開泵量,並可採用停抽結合的變真空能量法,在不影響加固效果的前提下,可以大大節省用電量。Aiming at the present low efficiency of well irrigation works and through pumping tests and theoretical analysis, the paper derives a method for calculating the optimum water yield, the best lifting distance and economic pipe diameter of low pressure pipe delivery system of irrigated area by wells, increasing the efficiency of motor - pumped wells
針對目前井灌工程效率低下的問題,通過抽水試驗,經過理論分析,推導出了井灌低壓管道輸水灌溉系統的最優出水量、最佳揚程和經濟管徑計算方法,從而可提高機井灌溉效率。This control system adopts creditable plc for real control ; it sends many simulating signals collected by old sand temperature of inlet, suction opening temperature of double disk, inner sand temperature of double disk, current of mainframe and current of fan ; meanwhile, the operation signal and switching value signal outputted by material movement transducer is inputted to switching value module of plc ; it gets evidence of water feeding after cpu account ; the operation result of cpu is outputted by switching value of plc to control unlock combination of coarse, middle and thin water feeding electromagnetically operated valve and then gets different water feeding quantity
該控制系統採用高可靠性的plc可編程序控制器進行實時控制,傳感器所採集的入口舊砂溫度雙盤抽風口溫度雙盤內砂溫主電機電流及鼓風機電流等模擬量信號直接輸入plc的模擬量採集模塊,同時加砂設備運轉信號及加砂設備物料移動檢測傳感器發出的開關量信號輸入plc的開關量模塊,由cpu獲取經運算而得到加水計算依據, cpu運算結果直接由plc的開關量輸出控制粗中細加水電磁閥的開啟組合,而得到不同的加水量。Based on the new technique of vacuum deep wellpoint developed in recent 10 years and the actual conditions in the well water exclusion of foundation pits, a new method for evaluation volume of water was brought forward
摘要針對近十年發展起來的井管內抽真空的深井井點新工藝,根據它在四周有良好隔水的基坑中降水的實際情況,提出了一種水量估算和井點設計的新方法。Surface subsidence was most serious in certain areas where large quantities of underground water were pumped out
在地下水大量抽出的地區,地面下沉非常嚴重。At each daily observation, a carefully measured amount of water is added to or removed from if the rainfall is heavy the pan until the surface of the water just touches the fixed point
每日觀測時注入經小心量度分量的水如果曾有大雨則要抽水出來量度直至水面剛剛接觸到固定針規。At each daily observation, a carefully measured amount of water is added to or removed from ( if the rainfall is heavy ) the pan until the surface of the water just touches the fixed point
每日觀測時注入經小心量度分量的水(如果曾有大雨則要抽水出來量度)直至水面剛剛接觸到固定針規。Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits
在進行以上四方面內容深入探討的基礎上,論文針對丹江口水利樞紐運行任務、運行方式的重大變化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算發電效益減少值;合理地核算水源的供水成本;以上述兩項計算成果為基礎,核算企業結構調整后總效益變化量;提高預報水平,減少棄水量,爭取增發季節性電能;研究新的調度方式,提高電站調峰能力,提高電站的容量效益;在適當的地點修建抽水蓄能電站,提高電站的調峰能力。Guishan sliding mass is located just above the intake ( outlet ) of the lower reservoir of the proposed baoquan pumped storage reservoir, being 550 - 800m long from east to west, 260 - 350m wide from south to north, 110m thick in average and up to 210m thick, with a total volume of 21 million cubic meter
龜山滑坡體位於寶泉抽水蓄能電站引水發電系統下庫進出水口的上方,滑坡體長550 800m ,寬260 350m ,最大厚度210m ,平均110m ,總方量2100 10 ~ 4m ~ 3 ,形成於距今14 21萬年,其穩定性如何直接影響下庫及整個電站的安全。As to the wheat starch exported from january to april 2005, the statistical analysis of the moisture, ash content, sulfur dioxide etc. have been also drawn a quality control chart
對2005年1 4月份間出口的小麥澱粉抽取水分、灰分、二氧化硫等項目的實驗室數據進行統計分析,繪制質量控制圖。分享友人