抽水蓄能開發 的英文怎麼說

中文拼音 [chōushuǐnéngkāi]
抽水蓄能開發 英文
pumped storage development
  • : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 能名詞(姓氏) a surname
  • : 名詞(頭發) hair
  • 抽水 : 1. (用水泵吸水) draw [pump] water 2. (縮水) (of cloth through wetting) shrink
  • 蓄能 : energy storage蓄能器 accumulator
  1. In his presentation entitled pumped storage power generation technology and project investment analysis, he gave a birds view on the pumped storage resource in china, development of pumped storage power station, its function in load valiation and the necessity of its construction

    他分析了全國22個省市區的電站資源,總結了國內電站的現狀,並指出電站是一種經濟的調峰手段,分析了加快東部廣東和中部電站建設的必要性。
  2. Develop and manufacture large pumped storage units, large tubular turbine units, high - power super - critical thermal power unit, large air - cooled turbine generator, large cfb boilers, high - power nuclear steam turbine and generator, pressure shell of nuclear island, high - pressure evaporator and primary pump

    生產大型機組、大型貫流式機組、大功率超臨界火電機組、大型空冷汽輪電機、大型循環硫化床鍋爐、大功率核電站汽輪機和電機、核島設備壓力殼、高壓蒸器和主泵等核電一級設備。
  3. The load, water, and power dispatching system model based on real - time information system sis for tianhuangping pumped - storage power station is introduced in the aspects of system design, development, and debugging

    摘要就天荒坪電站基於實時信息系統sis平臺的負荷、庫調度、電量系統模型的設計、建立、和調試工作進行了說明和介紹。
  4. At the same time, according to the geological condition of a project in gaize county and its power demand, 9 different proposals were worked out for calculation and analysis, therefore a development proposal of pumped storage with wind and light as supplements was finalized as the best through selection and comparison

    以改則縣某工程為實例,針對其自然地理條件及對電的需求,應用風、光、互補系統分析模型,擬定了9個不同方案進行計算分析,經方案比選,提出了該工程風、光互補電站的最優方案。
  5. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏電站的泵運行時,不同負荷工況下停機、導葉和轉輪間壓力的變化,闡述了華東桐柏電站1號機組電機斷路器斷的最佳負荷值選定。
  6. By incorporating the power sources location and load prediction results in the energy utilizing proposal, a balance for the power volume needed by 3 counties in the area in three " five - year plans " period is also made, the result of which indicates that, it can meet the power demand required by the social - economic development in the region in next three " five - year plans " if the water power resources are rationally planned and developed and then a comprehensive energy utilizing proposal by combining solar and winding energy together

    並結合區內電源點分佈和負荷預測結果,進行了各縣三個五年計劃期間的電力電量平衡。得到了相應的結論。基於對風、光資源各自特點的分析,文中進一步對多互補系統進行了較深入的研究,明確了在阿里地區特定的自然條件下,採用風光互補抽水蓄能開發方式的合理性及可行性。
  7. Stars electric successfully run a self - developed governing system in jilin baishan revisable pump powerstation, and became the unique domestic manufacturers who has design and manufacture experience of governing system of large revisable pump type turbine

    事達電氣自行研製機組調速系統在吉林白山電站成功投運,成為在大型機組上唯一有運行業績的國內調速器生產廠家。
  8. To be the chief technical principal in charge of the research and development of the pumped - storage unit control ; and in charge of major research subjects and to be engaged in the technical research and development of the automation and control system for the pumped - storage unit

    機組控制研技術總負責,重大課題技術負責人,從事電站機組自動化及控制系統的技術研究與
分享友人