抽風通風機 的英文怎麼說

中文拼音 [chōufēngtōngfēng]
抽風通風機 英文
induced draft engine
  • : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
  • : Ⅰ名詞1 (空氣流動) wind 2 (風氣; 風俗) practice; atmosphere; custom 3 (景象) scene; view 4 ...
  • : 通量詞(用於動作)
  • : machineengine
  • 通風 : 1 (使空氣流通) ventilate; air 2 (透氣) be well ventilated 3 (透露消息) divulge information;...
  1. Abstract : by means of the comparison and analysis to applications of convertional starter and frequency conversion governor inmine exhauster, a useful and practicable electricity - saving pathof exhaust system was found out, so improving systematic saving operation

    摘要:過對傳統起動器和變頻調速器在礦井的應用進行比較分析,找出一種系統有效、可行的節電途徑,以實現系統的經濟運行。
  2. Slow cooling section is next the fast cooling section, cooling tiles slowly by exchange heat between hot gas in the tunnel and the environment air, which is sucked into pipes stick in the tunnel and been heated there, and been sent to dryer to dry biscuits

    緩冷段不直接打冷卻,它將環境空氣吸入,進入窯內導熱良好的鋼管,並將換熱后的熱空氣送入乾燥窯內,冷空氣在換熱過程中,使製品得到間接的冷卻,讓製品安全度過573的晶型轉換階段。
  3. Induced draft mechanical cooling tower

    冷卻塔
  4. But the effect of making the wind - in door move toward below is the main influence ingredient. when wind - in door is below and exhaust fan is below, the ventilation and heat dispersion of the cabin is enhanced furthest, both the average and maximum

    當使進口靠下,位置也靠下時,最能增強組艙的散熱,組各側平均溫度和最高溫度都可以降低(超過2 ) 。
  5. Only the wind - in door near the working generator set is opened, and exhaust fan is installed in the middle of the cabin. the ventilation and heat dispersion are enhanced by the two methods, making the wind - in door move toward below and making exhaust fan move toward below

    組艙應只開啟工作組側的進口,且把設置在組艙中部,使進口靠下和使靠下均能增強組的散熱,但使進口靠下是增強散熱的主要影響因素。
  6. A qualitative analysis and computer simulations show that airflow reversal can occur in a non - diagonal airway parallel to the airway on fire in a horizontal ventilation network due to the pressure increase induced by cooling of fume in the airway connected in parallel to the non - diagonal airway but in series with the one on fire

    摘要過定性分析和計算模擬發現:在水平網路火災中,非角聯旁側分支也能發生流逆轉,引起逆轉的動力是與該分支並聯但與著火分支串聯的分支中的冷力。
  7. With the successfully biding of core inserting pulling mechanisms and threading rotation ejection mechanisms supported by nation innovation financial and the approval of establishing large injection forming molds project technology r d center, jinsu company is gradually switch the center of industry structure to produce high precision and automatism high - end molds, and the base point that supports the new development is gradually emerged. i believe in 2007 jinsu will make great progress

    隨著公司「模具開合模插芯與螺紋轉動脫模同步構」的過論證與國家創新基金項目的獲得與支持,金塑公司在2006年正在逐步地把產業結構重心轉移到生產高精度全自動的新型模具方向上來,支撐新一輪快速發展的基點正在逐步形成,我相信在2007年金塑公司必定會乘破浪更上一層樓。
  8. Replacement of high voltage switchboards, transformers and low voltage system of the tunnel power supply system in lion rock tunnel, replacement of field equipment of toll collection system in cross - harbour tunnel and replacement of ventilation control panels, exhaust fans, motors and flexible connectors in aberdeen tunnel

    更換獅子山隧道供電系統的高壓配電板變壓器和低電壓系統更換海底隧道車輛繳費系統的路面設備及更換香港仔隧道的控制屏氣扇電動和軟接頭
  9. An innovation on the rope separator of friction - type hoister in mines

    礦用防爆對旋出式安全運行淺探
  10. Technical specification for extractable axial - flow fan used for the ground of small mine

    小型煤礦地面用出式軸流技術條件
  11. Double disk stir cooler can accelerate evaporating moisture for getting low temperature with strong stirring of scraper in short time through water feeding, blast and convulsions ; meanwhile, it has definite function of rebirth and mixing for old sand, which makes it become the best device for old sand treatment of clay sand system

    雙盤攪拌冷卻,能在短時間內在刮板的強烈攪拌下,過加水鼓,促使水分蒸發以達到降溫的目的,同時對舊砂有一定的再生混勻作用,使其成為對粘土砂系統舊砂進行冷卻的最佳裝置之一。
  12. So, it ’ s of particularity and application value to study the air distribution of the station. according to the air ventilation and air conditioning ’ s model experiment of the thermal environment ’ s peculiarity in the underground powerhouses of the langya - mountain hydropower station, this paper presents the research on the distribution of temperature and velocity in the main underground working units

    本文結合瑯琊山水蓄能電站地下主廠房熱態模型試驗項目的後期模型試驗研究任務,進行該電站頂送地下主廠房空調熱環境特性的模型試驗和數值計算,著重對地下主廠房發電層的氣流組織優化及空間溫度和速度分佈性狀進行研究。
分享友人