拆了又裝 的英文怎麼說
中文拼音 [chàilēyòuzhuāng]
拆了又裝
英文
striand reassemble-
An hour later, he stripped it and reassembled it.
一個鐘頭以後,他拆完又裝好了。An iron cannon was actually installed for the purpose of subduing invading forces but it was later dismantled without a shell ever being fired
實際上為了抵禦外侵還安置了大炮,但隨后又拆除了點火裝置。He took the machine to pieces and then put it together again.
他把機器拆開后又組裝起來了。She was withdrawn from service 1n 1947, and after modernization and further service, was scrapped in 1976. hancock was awarded the navy unit commendation and received four battle stars for service in world war ii
1947年的「魔毯」行動之後,漢考克號被編入預備役,並且在進行了現代化改裝之後又服役了很長時間,最終於1976年退役並被拆毀。The envelope contained a sheet of elegant, little, hot - pressed paper, well covered with a lady s fair, flowing hand ; and elizabeth saw her sister s countenance change as she read it, and saw her dwelling intently on some particular passages
信立刻拆開了,裏面裝著一張小巧精緻熨燙得很平滑的信箋,字跡是出自一位小姐的娟秀流利的手筆。伊麗莎白看到姐姐讀信時變了臉色,又看到她全神貫注在某幾段上面。Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables
針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張拉預應力鋼筋和張拉斜拉索。As a key part of the port crane, slew bearing ' s fault has a negative impact on the efficiency of the whole product line, as well as great direct and indirect loss. because of its compact structure, direct observation and frequent disassembly are not available for monitoring and routine management
大型回轉軸承裝置是港口起重設備的關鍵部件,一旦發生故障,會影響整個作業線生產,帶來巨大的直接和間接損失,而其大型、封閉的結構又決定了不能依靠直接觀察和頻繁拆卸來對其進行故障監測,這就給大型回轉軸承裝置的日常管理帶來了困難。分享友人