拆開過程 的英文怎麼說

中文拼音 [chàikāiguòchéng]
拆開過程 英文
unpack procedure
  • : 拆動詞[方言] (排泄大小便) excrete
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 拆開 : 1 disconnect; unpack; decollate; break up; take apart; open; separate 2 disassembly; disconnectin...
  • 過程 : process; procedure; transversion; plication; course
  1. They include the framework of product long - distance maintenance guiding system, fault diagnose, automatically making of maintenance technics, the query of information and the visual leading. according to b / s model, the author puts forward system structure of product maintenance guiding system based on network. the dissertation introduces the main technologies for the realization of maintenance guiding system, the data structure of product fault and order of disassembly and assembly, and the way to get the preliminary data

    本論文對產品維修向導系統的幾個部分:包括產品維修向導系統的體系結構、故障診斷、維修工藝的自動生成、資源信息查詢和可視化引導的有關技術進行研究;根據web技術b / s模式結構和產品維修提出基於網路的產品維修向導系統的體系結構;介紹了維修向導系統的具體實現中的一些主要技術和產品故障數據結構、裝順序數據結構的設計以及這些數據表的原始數據獲得方法;對產品故障診斷採用的決策樹方法作了介紹;重點對產品故障診斷和產品各零部件的裝順序關系以及資源信息的查詢進行了實現;針對轎車卡板式門鎖,發了產品維修向導系統的實例。
  2. Use the soft of blasting demolition of blasting demolition of reinforced concrete framing structure, we can optimize the mode of blasting detonation, detonation parameter etc, and predict the effect of blasting. taking advantage of delphi ' s power function, we develop a interactive graphics and some analysis tools. at the same time, we use 3ds max make a animation of blasting demolition of reinforced concrete framing structure

    利用數值分析方法,在計算機上編求解;建立除爆破實例庫、除爆破參數庫,完成對除爆破方案的選取、爆破參數的設計、除爆破效果的預測,發出能夠對錄像、照片等資料進行分析的工具,建立互動式的圖形處理系統,完成對系統成果的靈活輸出,並製作出接近實際的鋼筋砼框架結構建築物除爆破的三維動畫效果演示。
  3. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行裝,參與受力計算,整個施工按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張拉預應力鋼筋和張拉斜拉索。
  4. The application and its component parts, in object code form, cannot be separated for use or distributed on more than one device and cannot be connected to other application for use and cannot be reverse engineered, decompiled or disassembled

    本應用式及配件採用目標碼,不可分應用或發送于多一個裝置,也不可連接其他應用式使用,或進行逆向工匯編或分組件。
  5. " alan will have another operation to remove the pin next week and then he can start the next stage on his recovery process, " confirmed queiroz

    「阿蘭下個星期將進行另一次手術進行線,然後他將始進入下一階段的恢復, 」奎羅斯確認道。
分享友人