拉偏索 的英文怎麼說

中文拼音 [piānsuǒ]
拉偏索 英文
pull slanting cable
  • : 拉構詞成分。
  • : Ⅰ形容詞1 (不正; 歪斜) inclined to one side; slanting; leaning 2 (只側重一面) partial; prejudi...
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  1. In the search for answers, " lost worlds " takes the audience on a journey up into a world high above the streets of new york city, and down into the soil of the catskill mountains and beyond ; we plunge into the kelp forests of the pacific and investigate biodiversity with a team of scientists in the remote and fantastic table mountains of venezuela

    要找出個中原因,電影將會帶領觀眾進行從美國紐約?摩天大樓到吉士喬山脈中的旅程,陪同科學家潛入太平洋的海藻森林及研究委內瑞遠山區內多樣化的生物物種。透過這些不同探歷程,電影嘗試探討有關生物的差異及彼此的復雜關系及人類生存之謎。
  2. The precise fe model was used to predict the factors of load - carrying capacity of the controlled sections of the box - girder, by selecting some important factors which can affect the load - carrying capacity, such as the area of cables, stiffness of expanding joints, elastic modulus of concrete, and the amount of living load, to simulate the several possible damages of the bridge in service in the future

    ( 3 )該橋在運營四年後,力、撓度、應力與主塔位都在設計允許的范圍內,大橋依然具備通行設計汽車荷載的能力。 ( 4 )對該橋承載力的預測分析表明:在所分析的可能損傷狀態下,具有足夠的安全系數,損傷對控制截面的承載能力系數影響較大。
  3. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜橋施工過程各狀態和成橋恆載狀態下,斜力、主梁線形、主梁關鍵截面應變、塔塔頂水平位等關鍵項目的施工控制結果均滿足設計期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,斜、主梁和塔三大體系的受力狀態合理,橋梁結構安全可靠,大橋的監測監控取得了圓滿成功,並為該橋營運階段的長期監測監控奠定了良好的基礎。
  4. Firstly, the domestic researches, which have been reported, are introduced. then the characteristic of the system in estimation of prestressing losses is analyzed by theoretical method, and the reasons that the elimination of tendon is large and test results are not consistent are pointed. using fem software ansys, anchorage zone of pylon are analyzed

    論文首先介紹了國內現階段對該問題的一些研究成果,然後從理論上分析了小半徑大噸位環向預應力體系在計算預應力損失方面的特點和造成張伸長量大且實測的數據離散性較大的原因,並採用國際權威的有限元分析軟體? ? ansys從理論上進行分析和塔錨固區最不利節段的足尺寸模型試驗進行校驗。
  5. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應力閘墩錨永存張噸位,首先採用方案優選的方法確定主次錨永存張噸位組合,但優選結果錨系數大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次錨永存張噸位進行優化,優化結果滿足應力控制要求,降低了錨系數。
  6. The distance from figure center of the parabola to the potential slide surface is less than half of the section length. mechanical conditions of this method include not only force equilibrium but also moment equilibrium. as for the beam - on - foundation, its pressure can be calculated by homogeneous hypothesis or winkler foundation hypothesis or infinite half elastic foundation hypothesis on the pulling anchor - cable step and by coulomb active earth pressure theory approximatively on the long term working step

    對于樁在滑面以上段所受的坡體荷載,提出可按形心下的拋物線型分佈模式計算,並在滿足力的平衡條件的同時還滿足力矩平衡條件;對于地樑上作用的坡體荷載,提出在錨階段可按均布或溫克爾( winkler )地基假定或彈性半無限體地基假定來計算,在工作階段則一般可以近似按庫侖主動土壓力理論計算。
  7. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土塔施工設備進場及現場管理都比較困難;塔柱多為空心變截面,且為高空作業,給模板工程及預應力張帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;塔施工位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心塔柱部分體積較大,易產生溫度裂縫。
  8. It has a static yoke. i ' ll double check the draw stop timing. would draw stop timing affect left / right impact

    本來纜就是靜態卡位的.我想再查看一下心輪停定位的同步問題.吃不準,停定位的同步,是否真的影響到命中點的左右
分享友人