拉力測力計 的英文怎麼說

中文拼音 []
拉力測力計 英文
te ion dynamometer
  • : 拉構詞成分。
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 拉力 : pulling; pulling force; thrust; traction; tension拉力表 draw bar [pull] dynamometer; 拉力測定儀 [...
  1. Suitable calibrated dynamometers were used to control the pull in the prestressing cables.

    用合適的標定過的量控制預應鋼索的
  2. Standard guide for measuring matric potential in vadose zone using tensiometers

    定滲流區矩陣勢能的標準指南
  3. Soil quality. determination of pore water pressure. tensiometer method

    土質.孔隙水壓的定.
  4. Several kind of simplified calculating models are introduced. the web and flange plates in mcar with a large number of corrugations were equivalent to orthotropic curve plates. the equivalent elastic modulus was yielded by tensile tests, which provides the material constants data for the structural static and dynamic analysis

    2 、綜述了拱型波紋鋼屋蓋的各種簡化算模型,並把帶有波紋的腹板和底板分別等效成正交各向異性平曲板,通過試了它們的等效彈性模量,為結構的靜和動有限元分析提供材料常數依據。
  5. Ring tenison distributions were also measured using a specially devised block

    同時採用一種特別設的推塊出了環的分佈。
  6. A former site administrator of the main contractor for a redevelopment project at wang tau hom estate was sentenced to 120 hours of community service for conspiracy to defraud the housing department in relation to the disposal of non - compliant reinforcement steel bars at the site

    橫頭?重建劃總承建商的一名前地盤總務員,訛稱已將未能通過檢定試的高鋼筋運離地盤,串謀詐騙房屋署,被判須履行一百二十小時社會服務。
  7. Development of pull testing system for anchor bolt

    錨桿試系統的設
  8. When the soil - nailing is under operation, contrast between the actual pull force and the value calculated by current regulations is made

    採用在土釘主筋上埋設鋼筋應進行土釘實際工作狀態下的試和把實與現行規程算得出的結果作對比的研究方法。
  9. Department perfect test, which can be made into various mechanical properties such as : tension tests, strength tests slide, terminal testing ; electrical performance test items include : insulation resistance testing, contact resistance testing, testing withstand voltage, high and low test, solderability test, durability testing, vibration - resistant testing, life test

    完善之試部,能作各項機械性能試如:試、插撥試、端子強度試;電氣性能試項目有:絕緣電阻試、接觸電阻試、耐電壓試、高低試、可焊性試、耐久性試、耐振試、壽命試等
  10. The cable tension plays an important role in the construction control and long - term monitoring of cable - supported structures. the engineering implementation of a vibration - based cable tension evaluation is mostly carried out based on the taut string theory where the cable tension is estimated from measured natural frequencies by use of a simple explicit formula

    振動法廣泛應用於索結構的施工控制和健康監,其原理是基於弦振動理論:索與自振頻率之間存在簡單的關系,因此可以由實的自振頻率算得到索
  11. The thesis is aimed at presenting a procedure to establish a baseline finite element model of the qingzhou cable - stayed bridge over the ming river, fuzhou, china that was newly constructed. its main span length of 605m is the longest in the world among the completed composite - deck cable - stayed bridge. the proposed procedure includes several tasks : initial finite element modeling base on the design drawings, field loading tests and ambient vibration tests, and finite element model calibration with the test results

    本文以主跨605m的結合梁斜橋? ?青洲閩江大橋為背景,首先根據設圖紙建立該橋完整的初始空間有限元模型,然後根據通車前現場靜試驗和環境振動試驗結果對初始有限元模型進行校正,通過參數的調整使模型靜、動算結果與實值吻合。
  12. It has also pounded the keys, devices, disposition of surveyed spots, measure method and procedures, data gathering and process ( relation with construction workmanship ), error analysis and adjustment, control precision and rules, mechanism and method of control, tables of records, results and discussion. after completion, the bridge has good behaviors in dead loads state, cable forces, shape style of main beam, stress and strain of concerned sections, displacements of the tower top, which assure the reasonable state of cables, main girder and towers, and safe under running, demonstrate supervision

    通過課題研究與實橋運用,荊州長江公路大橋斜橋施工過程各狀態和成橋恆載狀態下,斜索索、主梁線形、主梁關鍵截面應變、索塔塔頂水平偏位等關鍵項目的施工控制結果均滿足設期望值的要求,滿足橋梁施工范圍的要求,大橋主梁線形流暢,斜索、主梁和索塔三大體系的受狀態合理,橋梁結構安全可靠,大橋的監監控取得了圓滿成功,並為該橋營運階段的長期監監控奠定了良好的基礎。
  13. The larson - miller method and the superheater wall temperature computation model brought forward by soviet criterion are adopted to calculate the life loss caused by creep. and a simplification formula is put forward to apply in the on - line life inspection system

    本文採用森米勒參數法,結合前蘇聯1973年熱算標準中的過熱器壁溫算模型,對前期蠕變壽命損耗進行了算;並提出簡化方法,用於在線壽命監系統中。
  14. According to the design theory of the cable - stayed bridge and to the feature of the cantilever construction the authors propose a construction control method called optimum completion state method ( ocsm ) for rc cable - stayed bridges in the proposed method, the optimum completion state is regarded as the final target of the construction control, and the optimum construction state at each construction stage is taken as the technical route the key of the method is to properly choose or adjust the cable forces the objectives function of optimization is to minimize the elevation error of the girder under the constraint condition that the internal forces ( bending moments ) of the girder are bounded the optimization variables are the cable forces on the basis of the above principles, a optimum model for a construction step is established and cable force adjustments can be found for each construction step in this model, the creep and shrinkage effects of concrete have been considered a bridge example is given which shows that the final state of the bridge is very close to the design aim and that this method is much better than the so - called double - control method the example is a good illustration of the soundness and practical value of the proposed method

    根據現代斜橋結構設理論和懸臂施工方法的特點,提出了以最佳成橋狀態作為施工控制的最終目標,以實施最佳施工階段為技術路線,以索調整為核心內容的斜橋施工控制理論,簡稱為最佳成橋狀態法;以斜橋主梁標高誤差最小為目標函數,以主梁內(彎矩)為約束條件,以索為優化變量,建立了最佳施工階段的索調整算模型;推導了考慮徐變收縮效應的索調整算公式;用最佳成橋狀態法對一實橋工程進行了施工控制全過程算研究,得到的成橋狀態與設目標相當接近,優于該橋以「雙控」為控制目標的實結果,有地證明了本文方法的正確性及其工程實際價值
  15. The judge criterion of plastic shrinkage cracking for cement based material was studied through the testing of plastic tensile strength and plastic shrinkage capillary stress of cement mortar and concrete

    摘要採用自行設的塑性抗強度、塑性收縮開裂應定裝置試了水泥砂漿、混凝土塑性抗強度和塑性收縮開裂應
  16. Self - erection system is applied to construction of most of modern large span concrete bridges. in the process of construction, cantilever beam is changing continuously because of the gravity of concrete, the stretching force, the load and temperature variation etc. in order to ensure that two cantilevers constructing opposite can normally close up and that the bridge linearity can accord with design, flexibility deformation has to be monitored

    現代大跨度混凝土橋梁多採用自架設體系施工,在混凝土自重、張、橋面荷載、溫度變化等的作用下,懸臂梁體處于不斷的變化之中,為保證對向施工的兩端懸臂能正常合攏和控製成橋線形符合設要求,需要對施工過程中的撓度變形進行監
  17. Taking nanpu bridge ( fst bridge ) in chun - an county as an instance, many problems on construction control technique for cfst bridge are discussed in this paper, including : the analysis method of simulating construction phase, construction monitoring technology, calculation of stayed - buckle - cable forces, allotting deadweight of pumping liquid concrete, analysis on the inflection of shrinkage and creep of core concrete in steel tube, analysis on the error in construction control, sensitivity analysis of parameters and parameter identification

    本文以淳安縣南浦大橋為背景,對鋼管混凝土拱橋施工控制中的結構分析方法、施工監技術、斜扣索索算、泵注混凝土自重荷載的分配、鋼管核心混凝土收縮徐變分析、施工控制誤差分析、參數敏感性分析及參數估等問題展開研究。
  18. 2 a modification approach of the dynamic model of cable - damper system is proposed. the approach is employed to modify parameters of cable - damper modal using cable system ' s first a few of modal frequencies which is obtained by field test. results show that analytical frequencies of modified cable model are close to field test ' s one with very small errors

    2 、提出了一種索動模型修正方法,該方法利用實索系統前幾階模態頻率,修正索模型參數,修正後的算模型得到的模態頻率與實值非常接近。
  19. Finally, the paper provides the theoretic method suitable for calculating the tensioning elongation of the tendons, and checks the method as well by measurement data from several engineering projects

    同時,分析了預應束的束效應引起的鋼絞線的重新排列,以及彎曲段等效徑向荷載產生的徑向位移,最後得出了適合小曲率半徑預應束張延伸量算的理論方法,並通過多個工程實數據進行校驗。
  20. The critical current and ac losses in hts tapes were measured under different winding radii and pulling stress. a theoretical model was proposed to describe the relationship of critical currents and ac losses with the winding or pulling stress - strain. it is shown that the calculated values were in agreement with the measured results quite well

    實驗量了高溫超導帶材在不同彎曲半徑及不同伸應下的臨界電流與交流損耗;建立了高溫超導帶材的交流損耗和臨界電流隨彎曲與伸應?應變變化的理論模型;利用該理論公式算的結果與量結果符合得相當好。
分享友人