拉力角 的英文怎麼說

中文拼音 [jiǎo]
拉力角 英文
angle of pull
  • : 拉構詞成分。
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 角Ⅰ名詞1 (牛、羊、 鹿等頭上長出的堅硬的東西) horn 2 (古時軍中吹的樂器) bugle; horn 3 (形狀像...
  • 拉力 : pulling; pulling force; thrust; traction; tension拉力表 draw bar [pull] dynamometer; 拉力測定儀 [...
  1. This article takes the lagrange equation as the principle, establishes mathematics modeling to the inertia brake vibration when it brakes, then simulates it with matlab. this paper educed the relation equations between, which are the inertia brake ' s friction coefficient of the brake ring and the friction disk, the mean radius, the braking force, rotation inertia of the driving top and the spline shaft, spiral climbing angle of the brake ' s concave - convex helicoid, the mean effort radius of the concave - convex helicoid, elasticity coefficient of the spring, quality of the driving top and the spline shaft, rotations inertia of the brake ' s rotation part besides the driving top and the spline shaft, suppresses sleeve. provides the theory basis for the inertia brake structure optimization

    本文以格朗日方程為理論基礎,對慣性制動器在制動時的振動進行數學建模,然後用matlab對其進行模擬,得出了慣性制動器在制動時振動頻率分別與制動環和摩擦片之間的摩擦系數、制動的平均半徑、主動頂和花鍵軸的轉動慣量、慣性制動器的凹凸螺旋面的螺旋升、凹凸螺旋面平均作用的半徑、彈簧的彈性系數、主動頂和花鍵軸的質量、慣性制動器除主動頂和花鍵軸外其他部分的轉動慣量和、頂壓套的質量等慣性制動器各零部件的物理參數之間的關系,為慣性制動器的結構優化提供了理論依據。
  2. The frozen coal destruction is the tension stress destroys, and establish the frozen coal cutting model in this foundation, obtains the cutting force, feeding force, tooth spacing according to the smallest energy principle. bring forward a rotary drilling mothod to unload the frozen coal, the broken ability is strong, without frozen depth limits, then obtains this machine working parameters, has combined this method with a grab and determined the plane of vehicle - carried rotary drilling movable coal - unloader

    凍煤破壞是破壞,在此基礎上建立了凍煤的切削模型,根據最小能量原理得到截割,進給和截齒間距的計算公式,分析得到截割與切削厚度成正比,隨著前的增大而減小;截齒最優截距與截齒尺寸有關且與切屑厚度成正比;進給隨著截齒前增大而增大的規律。
  3. The new round of wrestling between china and india in the south asian region was staged at the south asian alliance on regional cooperation ( saarc ) summit closed in dacca, capital of bangladesh on november 13

    中印兩國在南亞地區的新一輪剛於11月13日在孟加首都達卡閉幕的「南亞區域合作聯盟」 ( saarc )峰會上演。
  4. For arab countries the dhow has been the workhorse of the indian ocean, just as the junk has been for the chinese in southeast asia

    帆船一直是阿伯人在印度洋的主交通工具,一如中國人仰賴木帆船往返東南亞。
  5. The study, conducted by dr siu oi - ling, an associate professor at lingnan universitys department of politics and sociology, and fourteen overseas scholars, reveals that greater china managers mean stress level induced by work - family conflicts, at 33. 6, is higher than the 25. 7 and 32. 2, suffered by the english - speaking and latin american managers, respectively the full score is 54

    有報告顯示大中華地區的管理人員因工作崗位與家庭式引起沖突,而導致有工作壓的平均水平為33 . 6 ,高於分別只有25 . 7的英語國家管理人員及32 . 2的丁美洲管理人員滿分為54 。
  6. Din931 - 933 hex head bolt g8. 8 electrogalvanized

    鍍鋅公制頭螺絲
  7. Din934 hex nuts g8. 8 hot - dip galvanized

    熱浸沿水公制螺絲母
  8. Lastly, pressing stress is related with enter angle, structural parameter, the progression and physical character of the poweder. the experiment verified tube roll mill " s grinding effect prior vertical mill and roller

    通過對筒輥磨層壓應的分析可知:筒輥磨層壓應,結構參數,粉體級配物理性質有關。
  9. Once again, erland josephson and liv ullman reprise their roles with inimitable virtuosity, while bergman s instincts in capturing savage truths about relationships remain vitally unequalled

    巴哈沉重有致的薩邦舞曲激蕩銀幕每寸空間,父女的與褒曼的省思同在上演。
  10. As a whole, the research work of this dissertation can be summarized follows : 1. in accordance with my design patent, namely, reinforced earth retaining wall of r c net, and based on the analysis of the work mechanism, failure pattern, bearing capacity and stability of the reinforced earth, a new concept is expounded, namely, the reinforced earth wall which is thought of as a compound structure increase not only c but also ~ in comparison with non - reinforced earth. some bearing capacity formula are first introduced under the circumstances that the reinforced earth wall fails because of the breakage of material or inadequate cohesion between reinforcements and soil

    歸納起來,具體的研究和所獲得的一些重要成果如下: 1 、結合本人的設計專利? 「鋼筋混凝土網格式加筋擋墻」及工程實踐,在對加筋土的加筋機理、破壞模式、承載和穩定性等方面進行深入分析的基礎上,提出了一個新概念,即經過加筋后的土體作為復合結構與原土體相比,不僅提高了內聚,而且也提高內摩擦;並在此前提下首次導出破壞和粘著破壞兩種情形下的承載公式,然後進行了穩定性分析。
  11. In this application, the lorentz force generated by the interaction between the current in the wire and the geomagnetic field produces an electro - dynamic drag leading to a fast orbital decay. in this paper, we make an intensive study of the process of de - orbiting using electro - dynamic tether system. the concrete work includes : firstly, i have studied the basic principle of how to generate the electro - dynamic drag, modeled via accuracy geomagnetism, made a concrete analysis of the de - orbiting duration, the magnitude and direction of electro - dynamic drag under the action of the dipole and accurate geomagnetic models, set up a counterbalance between electro - dynamic torque and gravity gradient torque, emulate the de - orbiting process of spacecraft, and compared the change of six orbital factors and the de - orbiting duration under the action of the dipole and accurate geomagnetic models

    本文對基於電動纜繩的航天器離軌過程進行了深入研究,具體工作如下:首先,本文研究了電動纜繩產生電動的基本原理,建立了精確地磁場模型;分別在偶極子模型和精確地磁場模型作用下,對電動的大小、方向、離軌時間及電動纜繩傾的大小進行了計算分析;建立了電動矩與纜繩系統重梯度矩的平衡關系;分析了電動矩為系統提供能量的原理;最後分別在偶極子地磁場模型和精確地磁場模型作用下,對受電動纜繩作用的航天器的離軌過程進行模擬,分析了在不同精度地磁場模型下,航天器離軌過程中各軌道參數的變化情況,並比較了不同模型對離軌時間的影響。
  12. Based on the experiment, the influences of tool normal rake, chip pulling angle and chip pulling force on the shape and metallurgical structure of the fiber cross section are studied

    通過試驗研究了刀具法向前等對纖維橫截面形狀和金相組織的影響。
  13. Abstract : this paper analysed the kinematic properties of ball joint hi nged on the piston rod and steering drag link of a separated assistant steering m echanism, and the equations of the path and mathematical model of pressure angle were established

    文摘:分析了分置式轉向助機構的液壓缸活塞桿與轉向直桿相鉸接的球頭銷的運動特性,建立了其軌跡方程及壓的數學模型。
  14. This can be of significant benefit to cut down the cost and time limit for a project the program package gone with this paper may realizes the dynamic simulation for all of courses in hoisting, and may synchronously displays the axis force of derrick, the pull - force of the steel wire, obliquity of equipment and overloading instance

    這有利於工程實踐中方案變更、施工現場條件復雜多變等的方案驗算,節約成本和縮短工期。本論文程序為桅桿吊裝整個過程實現了動態模擬,顯示桅桿軸向壓、鋼絲繩、設備傾和起重超載提示,為安全吊裝設備提供重要的數據,有利於作業過程的全程監控。
  15. The endplates now feature mid - height horizontal winglets, similar to those seen on the mclaren, and an additional triangular fin has been added at the rearmost upper edge of the endplate, similar to that on the ferrari

    終板上現在有了一個中等高度的水平翼端帆,類似邁凱輪車上所見的那些;另外有一個額外的三鰭被安置在終板最後緣的上方,類似法車上的那種。
  16. The process of rotary stretch bending without lateral compression and with lateral compression is analyzed separately, and the models of the stress distributing in the section and the springback are also presented separately to discuss the relations between pre - stretch force, lateral compression and the amount of springback. numerous experiments had been done on the equipment of ztlw - 8

    本文以等邊型材為研究對象,使用解析法分別對無側壓與側壓轉臺式彎成形過程進行研究,建立了成形區截面的應分佈模型和回彈預測模型,從理論上探討了回彈半徑與預、側壓的關系。
  17. Basing on dalian specialized ore terminal engineering, through physical model experiment, the function of vessel under the action of wave, tide and wind to wharf structures is tested, variation law of vessel ' s motion when berthing and mooring at different angles of wave and tide and cable ' s tensile force are given

    以大連礦石專用碼頭工程為背景,通過物理模型試驗,系統測量了波浪、潮流、風等動要素耦合作用下的船舶對碼頭結構、系纜設施及護舷的作用;給出了波浪和潮流不同夾時船舶系靠泊狀態下的運動量及纜繩的變化規律。
  18. Din933 - 931 hex head bolt g10. 9

    級高強度公制六頭螺絲
  19. Then, the paper analyzed the motivation mechanism of the partner taken part in eip, and deduces the positive correlation between the environment cost, governance punishment and the formation of isn

    從成本推動、效益動、環境取向和內生動度系統研究了工業共生網路的生成機理。
  20. Having analyzed the check result of the torsional moment on the scene of the big hexangular high - stength bolts conjuncted in the service based on the engineering example, the paper gives two reseans about the lose of pretension the earlier checking of the moment and the inaccurate maintenance method

    摘要通過某工程實例,對在役大六高強螺栓連接副現場扭矩復驗結果進行了理論分析,找出了高強螺栓預損失的主要原因:一是現場扭矩檢測時間過早,導致預損失不穩定,前期損失較多;二是使用中維護不夠。
分享友人