拉緊行程 的英文怎麼說

中文拼音 [jǐnhángchéng]
拉緊行程 英文
take-up travel
  • : 拉構詞成分。
  • : Ⅰ形容詞1 (物體受到幾方面的拉力或壓力以後呈現的緊張狀態) taut; tight 2 (物體受外力作用變得固定...
  • : 行Ⅰ名詞1 (行列) line; row 2 (排行) seniority among brothers and sisters:你行幾? 我行三。where...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 拉緊 : cocking; tensioning; straining; forehand; effort拉緊螺母 tightening nut; 拉緊螺栓 draw in bolt ; ...
  • 行程 : 1 (路程) route or distance of travel; distance of run; length of travel; distance travelled; jo...
  1. The quasi - geostrophic process was diagnosed for a case of severe cold air breakout under the blocking situation during 16 - 18 march of 1998. the attention was focused on the relationship between the surface anticyclone and 500hpa blocking high. the results indicate that the cold outbreak is associated with the adjustment of blocking situation in the ural area, i. e. the collapsing and rebuilding of the ural mountain blocking high. the temperature advections in the lower troposphere shown that the polar cold air invading from the northwest caused the ural blocking high collapsed, and a new ridge developed rapidly was due to the warm advection on the southwestern side which led to the ural blocking high rebuilt. in addition, the distribution of the vertical motion on 700hpa shown that the surface high splitting was related to the considerable upward motion located on the southeastern part of surface high

    對1998年3月中旬一次高空阻塞形勢下強冷空氣過了診斷分析,著重討論強冷空氣爆發前後地面反氣旋活動與高空阻塞形勢調整的關系。研究結果表明,強冷空氣的爆發與烏爾地區阻塞形勢的調整阻塞高壓的崩潰和重建密相關。對流層下部的溫度平流分析表明,阻塞形勢的調整是由於阻塞高壓上游西北方有冷空氣侵入導致了阻塞高壓的崩潰,而上游來自西南方向的強暖流則導致高壓脊迅速發展,使阻塞高壓重新建立。
  2. Making reference to the anqing changjiang river highway bridge construction and the construction control, firstly, this paper studies the philosophy of the cable - stayed bridge construction control simulation analysis systematically, and pays much attention to the theory of simulating the construction process : backward analysis and forward analysis. then on the basis of introducing the construction process of the anqing changjiang river highway bridge, analysis the construction course fully, and analysis comparatively the result of each girder segment construction simulation, and study the variation philosophy of the line style of large cable - stayed bridge during construction

    本文密結合安慶長江公路大橋的主梁施工及施工控制實踐,首先系統地分析了斜橋施工控制模擬計算的整體思路,並重點分析探討了斜橋施工過計算的理論:理想倒退分析和實時前進分析,然後在介紹安慶長江公路大橋主橋施工過的基礎上,全面地計算分析了全橋的施工過,並且應用施工過計算結果,對每一個梁段的施工模擬工況進對比分析,研究了大跨度鋼斜橋在施工過中的線形變化規律。
  3. Abstract : the sensation of wearing pressure have assessed for knit garments having different sizes and fabrics having the different extensibility, by developing a wearing experimental procedure. at the same time, the objective clothing pressure, the fabric ' s extensibility and the garment ' s fitness have measured. regression analysis showed that the garment ' s fitnessand fabric ' s extensibility had great predictive power for the subjective pressure assessment

    文摘:設計了一組服裝用於穿著實驗.對不同尺寸、不同彈性性能的身長褲進了主觀壓力感評價,並測量了服裝壓、衣料的伸變形度和服裝寬裕率.通過分析,選用服裝寬裕率和織物的彈性模量作為指標預測服裝的穿著壓力感
  4. The program scheduled in this paper has simulated several event including different layout of take - up and various starting accelerations curves. at the same time, the laboratory experiment has done to do the confirmation

    編制的模擬序對所建的連續模型針對裝置不同的布置方式和不同的激勵方式等工況進了模擬,並在此基礎上進了實驗驗證。
  5. Recently there are situation of electric power shortage in many place of our country. the departments of electric power supplying have to shut off some users to keep the electric power net safe and stability

    當前全國許多地區都出現了不同度的電力供應張的問題,不少地方都發生了電力供應部門被迫閘限電以保證電網安全穩定運的情況。
  6. It is made from cotton flowers from cotton plants grown under the sun ; the flowers are gathered, filtered, stripped, pressed by machine or hand, then stretched, boiled, machine processed again, and dried in the sun. it requires a lot of effort and the process is painful. if cotton could talk, it would tell you in tears how hard it has been " practicing "

    像一件衣服,它本來不是這樣,它本來是種在外面的棉花樹開的花,自自然然地跟太陽笑笑,然後被採收回來,經過過濾,剝除外殼,然後用機器或是用手壓很,將棉花壓平后,經過短水煮等過,再放在機器加工,最後放置在欄桿那裡曬太陽,得花費許多功勞,經過很多痛苦的過,如果棉花會講話的話,它會每天哭著跟你說,它修修得好辛苦好辛苦!
  7. With prestressed rolling mill of the middle steelworks of taiyuan iron and steel limited group company as the researched object, this article analyze the existent questions and research the initial stress of prestressed rolling mill and computer control system, analyze the design thought of prestressed rolling mill and clarify the relationship between the dimensional precision of rolled material and the rigidity of base of rolling mill and the main method to increase the rigidity of base of rolling mill, analyze how to confirm the rigidity, sectional area of handle and post, and pretightening force, put forward the viewpoint that the key to assure great rigidity is to assure that the remnant initial stress is always positive during rolling, and develop intelligent control system with plc as the core on the basis of the former research to assure that the remnant initial stress is always positive during rolling

    本文以太鋼集團公司中型型鋼廠預應力軋機為對象,分析了該廠預應力軋機所存在的問題,對預應力軋機的預應力以及微機控制進了系統研究;分析了預應力軋機的設計思路,闡明了軋材尺寸精度與軋機機座剛度的關系及提高軋機機座剛度的主要途徑;分析了預應力軋機設計過中預應力軋機的剛度、預桿和機架立柱斷面積及預力的確定;提出了預應力軋機保證高剛度的關鍵就是「確保軋制過中,殘余預應力始終大於零」的觀點;在前述研究的基礎上開發了以可編邏輯控制器為核心的智能監控系統,以確保「軋制過中,殘余預應力始終大於零」這個要求。
  8. 4. each set of pincers can be individual adjusted to their corresponding positions and functioned with automatic balancing. besides, an automatic down pulling stroke can be selected and controlled according to the tension of uppers

    4 .每雙爪子均可配合鞋型,獨立調整相對位置及自動平衡功能,並可視鞋面松度,選擇左右獨立自動下動作。
分享友人