拔樁試驗 的英文怎麼說
中文拼音 [bázhuāngshìyàn]
拔樁試驗
英文
pile pulling test- 拔 : Ⅰ動詞1 (拉出; 抽出) pluck; pull out; pull up; draw; move 2 (吸出) draw; suck out 3 (選取 提...
- 樁 : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
- 試 : 名詞(古代占卜用的器具) astrolabe
- 驗 : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
- 拔樁 : pile pulling; pile extracting拔樁機 pile-drawer; pulling machine
- 試驗 : trial; experiment; test
-
Secondly, we recommend the practical experiment of cast - in - place piles, including field solid and liquid qualification, experiment purpose, experiment project, experiment equipment, experiment process and the notice of experiment. thirdly, we processed and analyzed experimental daters, studied the rule of strength transferring, and studied the rule of strength transferring of check resistance and side of peg rub resistance, contrasting with common re - draw peg. at last, we advance some unfathomed problem and prospect foreground of cast - in - place piles
本文首先對支盤樁的基本原理進行了闡述,對其施工過程以及成型過程進行了描述;然後對本次抗拔支盤樁現場試驗進行了介紹,包括試驗現場地質水文條件,試驗目的、試驗方案、試驗設備以及試驗過程,並對試驗注意事項進行了歸納總結;分析了支盤裝原位抗拔,研究了樁身軸力傳遞規律以及支盤阻力和樁側摩阻力的荷載傳遞規律,並與普通抗拔樁進行了相關對比;最後,本文提出了本次試驗尚未解決的一些問題,並對支盤樁的前景進行了展望。Attentions for the testing of tension pile with branches and plates
擠擴支盤抗拔樁試驗應注意的問題Pile withdrawal test
拔樁試驗Pile pulling test
拔樁試驗In this paper, based on the static - load tests of tension piles in soft ground lying on the province of zhejiang such as zhongshan garden, gongchen bridge canal piazza, etc, the calculations of ascending displacement, developing mechanism of the side friction and utmost bearing capacity of the tension piles are studied
本文以中山花園、拱宸橋運河廣場等浙江軟土地區抗拔樁靜載試驗為背景,對抗拔樁抗拔承載力計算、上拔量計算、抗拔樁側阻發展機理進行了分析研究。Effect of keeping core soil on stability of tunnel working face
沉管幹振擠密抗拔防浮碎石樁抗拔試驗研究Axial pull - out test of core concrete of prestressed concrete pipe piles and analysis of stress at the pile end
填芯混凝土軸拔試驗及樁端應力分析分享友人