拖欠罰金 的英文怎麼說

中文拼音 [tuōqiànjīn]
拖欠罰金 英文
delinquency charge
  • : 動詞1 (拉著物體使移動) pull; drag; draw; haul 2 (用拖把擦洗) mop 3 (在身後耷拉著) trail 4 ...
  • : 動詞1 (睏倦時張口出氣) yawn 2 (身體一部分稍微向上移動) raise slightly (a part of the body) ...
  • : Ⅰ動詞[書面語] (處罰) punish; penalize; fine; forfeit Ⅱ名詞(處罰) punishment; penalty
  • : Ⅰ名詞1 (金屬) metals 2 (錢) money 3 (古時金屬制的打擊樂器) ancient metal percussion instrum...
  • 拖欠 : be behind in payment; be in arrears; be back; tardy; default
  • 罰金 : fine; forfeit
  1. If there are no claims against the caution money, it will be converted to the graduation fee upon completion of the programme

    學生修業期滿,如無本校借貸及款,該保證將撥作畢業典禮的費用。
  2. I open a restaurant at signing contract of commodity chummage room to use as with landlord on november 18, 2006 ( at that time is the restaurant that makes over others ), this inn is in sha wan one in postern, my set up shop is less than a month, one in close, the business all the time very poor, but my chummage is handed in to all the time on june 20, 2007, on june 12 i move one part thing come home, because do not have a place to live at that time, live in inn all the time, after landlord sees, get on door lock instantly, cause me to cannot enter store, owe the charge of electricity that has a many month at that time, the water of 4 months is expended, landlord looks for me now must the evidence that i sign a beak a contract, otherwise continues to lease room set up shop, otherwise he i am sued in order to default water and electricity for cost, because water and electricity expends him to already was cleared on june 15, he defaults landlord of water charge of electricity to authority locks up the door in the regulation in the contract, the contract is written closely password code, urgent at that time set up shop, did not look careful, look now evil spirit eye, the penalty due to breach of contract in contract provision and amerce number are incomputable, i want to remove now contract, do not know what to idea there is

    我於2006年11月18日與房東簽訂了商品房租房合同用作開飯館(當時是轉讓別人的飯館) ,此店在沙灣一中后門,我開店不到一個月,一中封閉,生意一直很差,但我的房租一直交至2007年6月20日,在6月12日我將一部分東西搬回家,因為當時沒地方住,一直住在店裡,房東看到后立即將門鎖上,致使我無法進店,當時有一個多月的電費,四個月的水費,現在房東找我非要我簽一個違約的證據,要不繼續租房開店,要不他以水電費為由起訴我,因為水電費他已於6月15日交清,他在合同中規定水電費房東有權鎖門,合同寫得密密碼碼,當時急著開店,沒看仔細,現在一看煞了眼,合同條款中的違約款數都數不清,我現在想解除合同,不知有什麼辦法?
  3. 3 without prejudice to article 10. 2, a ground of relief under this clause relieves the party failing to perform from liability in damages, from penalties and other contractual sanctions, except from the duty to pay interest on money owing as long as and to the extent that the ground subsists

    3在不違反第10 . 2條的前提下,本條款規定的免責事由使不能履行義務的一方免除了支付損害賠償和其它合同制裁的責任,但只要該事由存在並持續,對于支付款項利息的責任則不能免除。
  4. During the outbreak of an epidemic situation, the loss - stricken enterprise that has its working capital loans mature and defaulted shall be exempted from loan penalty interest

    在疫情發生期間,對已到期並發生流動資貸款的受損企業,免收貸款息。
  5. The 4th section was the key section of whole article, and conducted the countermeasure study in the following law fields : engineering payment ensurence surety, legal demand on the available construction project fund, restlessly contradicted right, contract dissolution right, subrogation right, engineering payment compensation priority, the punish rule of engineering payment in arrears, construction industry enterprise law consciousness and law enforcement consciousness and level, so as to solve the problem of engineering payment in arrears in construction field radically

    第四章是本文的重點部分,該章節從工程款支付保證擔保、建設項目資到位的法定要求、不安抗辯權和合同解除權、代位權、工程款優先受償權、工程款的處規則、建築業企業的法律意識及執法意識和執法水平等方面進行對策性研究,以期從根本上解決建設領域的工程款問題。
分享友人