拱橋建築 的英文怎麼說

中文拼音 [gǒngqiáojiàn]
拱橋建築 英文
arch bridge construction
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 名詞1. (橋梁) bridge 2. (姓氏) a surname
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • 拱橋 : [建築] arch bridge
  1. According to the information concerned, the analogous structure were adopted on the alamilo bridge in sevilla, spain and on the curved cable - stayed bridge on golf court in xiaoye city, bingbu country, japan. at present, this kind of structure has not utilized all over the country yet. nanjing, the region of basic seismic intensity 7, is an unfavorable site for anti - earthquake in terms of geological conditions according to seismic code for buildings

    但是,主塔屬于傾斜高聳結構,屬于柔性結構,索屬于特殊懸索結構,經檢索了解,西班牙sevilla的alamilo和日本兵庫縣小野市內高爾夫球場上的曲線斜拉採用過類似結構,國內目前尚未有此形態的結構記載,南京地區地震基本烈度為七度,地質條件按照抗震設計規范之規定,屬對抗震不利地段。
  2. The construction of the bridge began in oct 1999, and the closing up of the steel tube was in dec 2000. during that period, i learned and analyzed the current construction methods fairly comprehensively, and collected the construction technique data of the cfst arch bridges having been built. based on this, aided by the simulation of construction procedure using finite element program, i proposed the operation program to make the steel tube segment be located at one time, and the scheme of dividing rooms to segment pouring

    於99年10月開工, 2000年12月主鋼管合龍,在此期間,本人就目前鋼管混凝土的施工方法進行了較全面的了解和分析,搜集了此類已梁的施工技術資料,在此基礎上,又藉助有限元程序對施工過程模擬計算的支持,提出了在梅溪河大懸臂安裝過程中,鋼管節段一次就位的操作程序和鋼管混凝土分倉灌的方案,並為施工單位采納應用。
  3. Because railway bridges are subjected to cyclical loading, their designs must account for the significant effects that fatigue can have on connections

    由於技術和學的考慮,一種獨特的軋制鋼被選用於和高架身的某些特定支撐。
  4. Because of technical and architectural considerations, a unique combination of rolled and cast steel was selected for the arch bridge as well as for certain supports elsewhere along the viaduct

    由於技術和學的考慮,一種獨特的軋制鋼被選用於和高架身的某些特定支撐。
  5. A series of arches supported by columns, piers, or pillars

    物由柱、墩或臺柱支撐的一系列
  6. Zhujiajiao is located by the dianshan lake in the western suburbs of shanghai, in the certerof qingpu county, linking sanghai with jiangsu and zhejiang province. with convenient transportation and quiet enviroment, it is a land flowing with milk and honey, the town boasts beautiful scenery and has many waterway, with row upon row of buildings along the rivers. 36 stone bridges, including fangsheng bridge, the five - arched stone bridge built in ming dynasty, link the nine old streets together and from graceful scenery

    朱家角位於上海西郊淀山湖畔,青浦縣中部,與江蘇、浙江省接壤,環境幽靜,是典型的江南魚米之鄉,水木清華,風光旖旎,鎮內河港縱橫,沿河鱗次櫛比,於明代的五孔石放生等36座石將九條古街連接,形成一派優美的水鄉風光。
  7. A little later, lady cooper would he rowed off into the heart of the city, with sketching - block and colours. she was an inveterate watercolour painter, and the house was full of rose - coloured palaces, dark canals, swaying bridges, medieval facades, and so on

    稍遲一點,柯泊夫人有時也帶了畫簿和顏色,乘遊艇到市區中心去,她是個執迷不悟的水彩畫家,滿屋裡盡是一幅一幅的玫瑰色宮殿,暗淡的運河,中古時代的物。
  8. In our country, cfst arch bridge is a new technique accompanied with bridge construction recently, which are light deadweight, high strength and high resistance to deformation

    鋼管混凝土是我國近年來發展的新技術,具有自重輕,強度大,抗變形能力強的優點。
  9. For its so many merits, cft ( concrete filled steel tube ) has gotten extensive application in the engineering practice, especially in long - span bridges and high - rise buildings. researches and investigations on the bearing capacities of cft and its time - dependent behavior have been widely carried out

    鋼管混凝土以其諸多優點而在高層和大跨度中得到廣泛應用,國內外很多學者對鋼管混凝土構件的極限承載力以及長期載荷作用下核心混凝土的徐變特性進行了大量的試驗研究和理論探索。
  10. In this paper, using large - scale current finite element software, analysising nanbu jialingjiang bridge as engineering example, considering the united action of arcade and of arch with the structure on crown, the author build several 3d finite element models including original bridge, dangerous bridge, all phases of strengthening bridges and strengthened bridge. in order to decide the most unfavorable load case accurately and quickly, using static analysis method this paper draws out the influence surface of bend moment for main section ; base on built models the paper analyzes the internal forces on entirely strengthening process and knows the damaged degree of dangerous bridge and does feasibility studying on its strengthening method ; finally, the paper simply analyzes the unite action of arcade and of arch with the structure on crown

    本文利用大型通用有限元軟體,結合南部嘉陵江大這一具體的工程實例,考慮連的聯合作用,立了包括原、危、加固各階段和加固后各狀態在內的空間計算模型;為了準確、快捷的確定最不利荷載工況,利用靜力法繪制了舊圈各控制截面的彎矩影響面;對其加固改造全過程進行了靜力分析計算,明確了危的病害程度並對其加固方法進行了可行性研究;最後,簡單分析了考慮連與否對該圈內力的影響。
分享友人