拱系統 的英文怎麼說

中文拼音 [gǒngtǒng]
拱系統 英文
arch system
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • : Ⅰ名詞1 (事物間連續的關系) interconnected system 2 (衣服等的筒狀部分) any tube shaped part of ...
  • 系統 : 1. (按一定關系組成的同類事物) system 2. (有條理的;有系統的) systematic
  1. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲壩進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常蓄水位、設計洪水位等3種工況下加固前後壩體壩肩的點安全數和7個可能滑動塊體的抗滑富餘數。
  2. Aimed at the vermiculation characteristcs of the move - in - mud robot, its location system performs the orientation of the move - in - mud robot by means of relative oriention, using the attitude information and displacement information

    其定位針對泥機器人以蠕動方式運動的特點,利用機器人的姿態信息和泥頭位移信息,採用相對定位的方法實現泥機器人的定位。
  3. The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper

    本文首次地對高壩壩身泄洪孔口、泄流過程以及壩下水墊塘的布置優化問題進行了討論。主要內容和成果有1
  4. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對壩施工期和運行期溫度場、徐變應力場進行了全過程模擬分析,較為的研究了混凝土壩施工期和運行期溫度場、徐變應力場的分佈規律,在分析中按照混凝土壩施工過程,考慮了混凝土分層澆築、施工間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度應力的影響。
  5. Gongbei customs started installing gps for small - scale boats navigating between zhuhai, hong kong and macau in order to improve the efficiency of customs checking

    從6月1日起,北海關對往來港澳的小型船舶全面安裝gps,以加快貨物通關速度,提高稽查走私的效率。
  6. Combining with the performances of danshan bridge, discussing the methods on the construction controlling and calculation of cable - stayed bridge, this paper raises an efficient construction controlling system, and realizes collecting construction data of the real bridge and technical information. by analyzing on the difference of theoretical calculation and real construction state, the author determines to take self - adapting construction controlling method which uses kalman filter method to identify and adjust construction parameters. by getting rational construction state from forward iteration method, this paper, taking concrete creep effect in consideration, raises a rational scheme to pre - remain deformation and adjust cable force

    結合丹山橋的結構特點,通過對斜拉橋施工控制及結構計算方法的探討,提出了有效的施工控制,實現了對實橋施工數據和技術信息的採集;通過分析理論計算與實際施工狀態的差異,確定了以卡爾曼濾波法作為施工參數識別與調整的自適應施工控制方法;通過正裝迭代法確定其合理施工狀態,並考慮混凝土的徐變效應,提出了合理的預留度和索力調整方案。
  7. The paper mentions the design of three - dimensional graphics modeling in the mine such as shaft, laneway, and equipment of transport and mining. human - computer interaction and viewpoint rambling in the demo system are realized so that the simulating staff may look at circumstances from different viewpoint and positions. under the precondition of limited resources holding, the contradiction between the fidelity of image display and real - time feature of system interaction process is better resolved with using of display list and model culling technology

    論文中採用了opengl圖形庫的基本繪圖函數進行三維圖形的模型設計,並詳細給出了立井、形巷道、梯形巷道以及工作面支架和井底運輸巷道設備的三維圖形設計方法;並著重分析人機交互與視點漫遊功能的技術在中的實現;在佔用有限資源的前提下,為了提高場景實時顯示速度,論文中採用顯示列表和模型淘汰等技術,並編制出了一個虛擬礦井實例。
  8. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體的長期監控預報預警決策開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  9. The plane - wave analytic solution of the coupled fluid - air - solid system and the fem model of air cushion isolations are applied to study the influence of air cushion on earthquake response of dams. the calculations show that air isolation will reduce the hydrodynamic pressure significantly and restrain the dam vibrations during earthquakes. if the dam and reservoir is isolated by air cushions, it will decrease the hydrodynamic pressures by more than 90 % and the seismic stresses by 20 - 30 %

    將本文首次提出的水體-氣體-結構的平面波作用理論解和三維有限元模型,應用於溪洛渡雙曲壩的抗震安全性和氣幕隔震可行性研究中,表明氣幕對高壩具有良好的隔震性能,可降低動水壓力90以上,壩體地震應力20 30 ,減震效果顯著,並使壩體的抗拉安全數從0 . 93提高到3 . 58 。
  10. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級水電站壩區巖體的形成和演化特徵的基礎上,詳細研究了肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對肩槽高邊坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了分析、計算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范圍,從而對肩槽高邊坡的局部穩定性有了全面的認識和了解。
  11. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸肩槽邊坡在開挖施工至斷層f5附近時,要使用混凝土栓塞、固結灌漿、錨索加固及排水等措施以防止巖體失穩。右岸肩槽邊坡開挖過程中要採取錨固及排水防滲等措施,以防止個別潛在不穩定的邊坡失穩。
  12. On the above research bases, we ? e proposed the optimized scheme of the raw material flow system of the production line, invented the high frequency vibrator and new type to prevent agglomeration store hopper. thus, we ? e fundamentally solved the problem of low screening efficiency and blocking in raw material flow

    在此基礎上,提出了電焊條藥皮塗料自動配料成套生產線的物料流的優化設計方案,在技術和理論上都有所創新,成功研製了高效振動篩分機和新型防儲料倉,從根本上解決了篩分效率不高和物料流堵塞問題。
  13. The maximal load - carrying capability of the arch support is calculated by adopting mechanical model of curved beam based on its force analysis, and relationship between bearing capacity coefficient of small curvature arch support and radius and span of curved beam is gained based on supporting capacity comparison of curved beam and straight beam

    採用曲梁模型進行了支架的受力分析,得到其最大承載能力;通過與直梁支架承載能力相比較,得到了小曲率型支架承載能力數與曲梁跨度和半徑的影響關
  14. The research of stilling pond of arch net floor originated in 1990, but its overall and systematic studies are still blank now

    網消力池的研究始於1990年,對它進行全面的研究還是空白。
  15. The curve of arch rib, rib section bending, splice of rib sections, seperator of tube, bracing plates, bracing system, meeting of arch, concrete pumping, hangers, tie - rods, the tower of the cable crane and the guy ropes, technical specifications of cfst arch bridge are discussed

    對鋼管混凝土橋的軸線選用、鋼管節段彎制、節段拼接、管內分隔倉、綴板設計、聯結繫、合龍設計及其細節、管內混凝土的泵送、吊桿、桿、纜索吊機與扣索塔架、技術規范等12個問題進行了探討。
  16. Because the design of unit structure follows the construction and control process, the operation sequence of iabs 2000 is consistent with the construction steps

    流程結構的規劃設計由於是面向鋼管混凝土橋的施工過程以及控制過程,保持了與實際施工控制步驟的一致。
  17. According to the concrete ages of different grout compartments, the concrete temperature rising process and the arching temperatures etc., aiming at the optimization of technology and economy, the paper studies systematically the feasibility of applying different temperature control measures in different seasons and at different elevations ; and obtains characteristic parameters of arch dam temperature fields and stress fields so as to provide a basis for construction units to implement second stage cooling or third stage cooling according to particular demand at that time

    為了達到技術上與經濟上雙優的目的,根據不同灌漿區的混凝土齡欺、混凝土溫升過程、封溫度等,研究了在不同季節里、在不同高程上採取不同溫控措施的可行性,得到了壩溫度場與應力場的特徵參數,為施工單位根據當時的特定需要,進行二期冷卻或三期冷卻提供了依據。
  18. In this article, according to heat conduction theory and finite element theory, the temperature field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, thermal insulation change, surrounding temperature change and water storage on temperature field in the arch dam are also considered

    論文根據熱傳導理論及有限元理論,用三維有限元浮動網格法對施工期和運行期溫度場進行了全過程模擬分析,較為的研究了混凝土壩施工期和運行期溫度場分佈規律,在分析中按照混凝土壩施工過程,考慮了混凝土分層澆築、施工間隙時間、絕熱溫升過程及壩體材料分區、水庫分期蓄水和環境溫度變化等因素對壩體溫度場的影響。
  19. Text : on july 27th, gongbei customs were suspicious of a red car and its occupants and upon a screening inspection discovered 150 computer hard disks hidden in side panels of the car

    7月27日,北海關發現一輛入境的紅色小汽車有走私嫌疑,經車載移動式車輛查驗掃描后,在汽車兩側的暗格中查獲電腦盤150個。
  20. The construction technology of twin - arch tunnel under the condition of large span, low - burying and soft surrounding rock is fully discussed and deeply studied in engineering analogy methed in the paper. with the study subject of huangmeishan tunnel of maanshan - wuhu expressway

    本論文以黃梅山隧道為研究對象,採用工程類比方法,對大跨、淺埋、軟弱圍巖條件下的雙連隧道施工技術進行了全面的探討和深入研究。
分享友人