拱線長度 的英文怎麼說

中文拼音 [gǒngxiànzhǎng]
拱線長度 英文
line of apsides
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 長度 : length; longitude; size; extent; footage
  1. With the help of this program, this paper does research on the moved backwards of the slide surface, lengthening the anchor section, the soil nail ' s total force, gets conclusion about relations between the soil nail ' s length and the slope ' s grade, height, soil ' s mechanical parameter ; relations between soil nail ' s total force and coulomb soil pressure. with the help of the large multiuse finite element program ansys, this paper analyzes the soil nailing in one - step ' s slopes, in two - steps " slopes, puts the emphasis on the axis force ' s distributing along the soil nail at each rows, the effect of both the excavating mode and the original slope figure to the axis force of the soil nail, the one another effect between the upper - step slope and the nether - step slope in the soil nail ' s axis force, gets conclusion about the design of soil nail at the first low, different slope body is the same with different excavating mode, the original slope figure has more effect to some than others because of the slope body, the reasonably design of the step width in two - steps slopes, the two - steps excavating and retaining has more virtue than the one - step ' s. through soil pressure analysis this paper does research on the differences and the links between the coulomb soil pressure theory and the rankin ' s, the vertical pressure at the slope surface when the slope surface is inclined and the retaining wall is rough, the soil pressure ' s distributing behind the panel, gets conclusion about the effect of both the slope body inner stability and the slope surface local stability to the soil pressure

    通過分析比較,論證了對數螺旋型比圓弧形作為邊坡的假設滑裂面具有較多的工程優點,並為此編制了一個採用極限平衡法分析土釘支護的fortran語言程序,以此作工具對滑裂面的后移、土釘錨固段的超、土釘總力的大小等方面作了研究,得出了有關土釘的與邊坡的坡角、坡高、土體力學參數的關系、土釘總力與庫侖土壓力間的關系等結論;採用大型通用有限元數值分析程序ansys分別對採用土釘支護的一階邊坡、二階邊坡進行分析,重點是研究各排土釘的軸力分佈規律、開挖方式及原始邊坡形態對土釘的軸力的影響、上下階邊坡在土釘軸力方面的相互作用,得出了有關第一排土釘的設計問題、不同類型的土體應適用於特定的開挖方式、原始開挖出的邊坡形態對一些類型坡體的邊坡土釘支護有較大的影響而對另外一些影響不大、二階邊坡臺階寬的合理確定、二階開挖及支護比一階時具有較多的工程優點等結論;通過土壓力分析對朗肯、庫侖兩種經典土壓力理論的區別與聯系、坡面傾斜及墻背有摩擦時的坡面豎向應力分佈、面板背土壓力的分佈形態作了研究,得出了邊坡支擋土壓力受坡體內部穩定與坡面局部穩定兩個方面的影響、土釘支護面板背土體中卸荷的存在對面板受力有利等結論。
  2. In the analysis, a cfst arch ( single tube ) is first divided into a finite number of straight beam elements. according to the virtual work principle and the modified newton - raphson iteration method the tangent stiffness matrix considering double nonlinear properties is established. with regard to the non - equilibrium forces, the material nonlinear property along the height of the section and the length of the element is considered and the computation accuracy is improved as a result

    本文首先將肋劃分為一系列的直梁單元,運用虛功原理和修正newton - raphan數值迭代演算法的基本原理準確推導了肋直梁單元的非性切矩陣;在不平衡力方面考慮了沿截面高和單元方向材料非性的發展過程,提高了計算精;再根據得到的切矩陣採用荷載增量步內修正newton - raphan迭代的增量迭代法進行了求解。
  3. In order to assure that the stress and strain state of structure is secure, the author analyses respectively the objective functions of the reasonable finished state and buckle - cable adjusted phase ; thus, the optimized model based on fga is framed. finally according to the example, the computation datum are compared with the iterative forward analysis method and the optimal control theory. the result shows that this method can be used conveniently and meet the construction and design precision

    為了滿足大跨鋼管混凝土橋施工的安全性與成橋預期的內力狀態和形,本文結合工程實例,分別對合理成橋狀態和扣索索調整的目標函數的確定進行了分析,將一組多變量、多約束的最小化問題無約束化,從而建立起適合於該問題的遺傳演算法優化模型,將其計算結果分別與迭代前進法和隨機最優控制理論進行了比較;結果表明,採用該方法編制的基於結構計算的遺傳優化程序操作靈活,能很好的滿足施工和設計要求。
  4. Abstract : for building a long - span concrete - filled steel - tube ( cfst ) arch bridge with an integrated installation tower, one of the key technologies is to control the arch rib alignment of the bridge. based on the theoretical analysis and the measuring results, the designed arch rib alignment of a being built bridge can be guaranteed quality by adjusting the length of the cables on - line. the engineering application shows, by using the on - line adjusting cable technology, that it is economical and in safety for building a long - span cfst arch bridge

    文摘:在大跨鋼管混凝土橋塔架/扣架一體化纜索吊裝施工中,其關鍵技術之一是主形控制.在理論分析和現場測試的基礎上,動態調整扣索,可保證鋼管肋的設計形.工程實踐表明:將扣索動態調整技術應用於大跨鋼管混凝土橋的吊裝施工中,可降低工程造價,保證施工質量
  5. This paper studies the key techniques involved in the construction of the deep water foundations, long - span prestressed concrete continuous rigid - framed girders and long - span concrete - filled steel tube arches of yichang changjiang river bridge on the newly built yichang - wanzhou railway, and also provides solutions to the possible problems thereof, which may be of certain guiding roles to the practical construction

    摘要對新建鐵路宜昌至萬州宜昌江大橋深水基礎、大跨混凝土連續剛構梁、大跨鋼管混凝土等施工過程中遇到的關鍵技術問題進行了研究,並對各個問題提出了解決方案,對實施性施工有一定的指導意義。
分享友人