拼裝作業 的英文怎麼說

中文拼音 [pīnzhuāngzuò]
拼裝作業 英文
consolidationservice
  • : 動詞1 (合在一起; 連合) put together; piece together 2 (不顧一切地干; 豁出去) be ready to risk...
  • : Ⅰ名詞1 (服裝) dress; outfit; attire; clothing 2 (演員的化裝品) stage makeup and costume Ⅱ動詞...
  • : Ⅰ名詞1 (行業) line of business; trade; industry 2 (職業) occupation; profession; employment; ...
  • 拼裝 : assembly
  1. As a shipping agent, our company undertakes appointed agency and through transport for import and export of whole shipping container, large amount of bulk grocery goods and special goods, including documents preparation, shipping space booking for import and export, customs declaration, customs login, storage, bonded warehouse, hand over in port, assembling devanning and insurance

    為海運貨代,我公司承辦海運集箱整箱箱及大宗散雜貨特種貨物的進出口指定代理聯運等務,包括單證繕制進出口訂艙報關報驗海關預錄入倉儲保稅倉庫口岸交接拆箱保險等。
  2. The work high above the ground can be reduced efficiently and the installing quality of support can be ensured through installing on ground and erecting entirely

    充分利用制式器材在地面,整體吊,有效地減少了高空,保證了支架的安精度和質量。
  3. During the construction of the water pile, every key step needs floating crane. compared with cable crane, the floating crane has the characteristics of low cost, large lifting capacity, easy assembling and operating. it is a good method and can be spread and used in the deep - water construction

    在水中橋墩的施工過程中,每個關鍵步驟都需要浮吊,有了浮吊,無需纜索吊,就完成了施工,而且浮吊造價低、操靈活、簡易、起重量大,在深水中,是一種值得推廣和使用的好方法。
  4. Type nhss wire rope pulling hoist is widely suitable for use in bridge - construction, laying of large - size pipes, installation and adjusting of machinery an electric apparatus, and large reaction tower of petrochemical industry ; the installation and alignment of storage tanks ; erecting, fitting, welding and alignment of masts, steel concrete timber structures ; laying and translocating of rails and sleepers ; loading and unloading bulky heavy goods during transportation. cable tensioning ; demolishing of gallery supporting logs ; stacking forrestry wood ; and othersimilar cases. the hoist of this series is especially suitable for use in narrow working sites of limited space, where the job is high above the ground or in open air places, in tunnel of deep well, where no power for traction or lifting is available

    Nhss型鋼絲繩手扳葫蘆可廣泛用於建築施工、大型管道鋪設、機電設備和石油化工大型反應塔、儲罐的安、校準、鐵塔及其它鋼木結構的豎立、焊接、校準、鐵軌、枕木的鋪設、移位、交通運輸中笨重貨物的卸、電線張緊、坑道支撐木的拆除、林區木材的集放等等,對于局部空間受到限制的狹窄工場所、高空、野外、坑道、深井和無機電供能場所的各種牽引、提升、選用本系列產品尤為適宜。
  5. With many years of experience in cfs service, clients are ready to be offered “ soc ” and “ coc ”, stands for “ shipper own consolidation ” fcl and “ consignee own consolidation ” fcl, thus cut - down their cost in a specialized manner for export shipments

    常年經營進出口箱的經驗,通過我們所提供的專的特殊操,使廣大客戶對其進出口整箱以收貨人或發貨人自運的要求得到滿足,客人因此而節省了大量的成本支出。
  6. By way of these tendons, precest beams and columns can be assembled conveniently, and the joints and frame are monolithic and continuous. consequently, compared with common reinforced concrete frams, this kind of frame systems possess higher reliability and solved the problems in the process of assembling prestressed concrete frames. also it forms the framework of subassemblage and prestressed concrete frames, and explores a new way for industrial production of prestressed structures. by analyzing this system, a series of conclusion are provided, incluing modulation of bending moment produced by vertical loads within beam end, secondary internal forces produced by pretress force, shear resistance of the end of beams, the influence of lateral restrains. theresearch results of this paper are proved to be practical. some advices are also brought forward on the design process

    后張預應力筋既可為施工階段手段,又可在使用階段承受梁端彎矩,構成整體受力節點和連續受力框架,克服了配式節點受力可靠性差的缺陷,解決了預應力混凝土框架難以配的問題,形成預制預應力混凝土配整體式框架,開辟了預應力結構工化生產的新途徑。本文針對預壓配式預應力混凝土框架,從豎向荷載用下的梁端彎矩調幅、施加預應力在框架中產生的次內力、梁端抗剪承載力、考慮側限的無側移框架的承載力分析四個方面對該種配式結構體系的性能做了詳細的研究。
分享友人