指定分包商 的英文怎麼說

中文拼音 [zhǐdìngfēnbāoshāng]
指定分包商 英文
nominated sub-contractor
  • : 指構詞成分。
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 分Ⅰ名詞1. (成分) component 2. (職責和權利的限度) what is within one's duty or rights Ⅱ同 「份」Ⅲ動詞[書面語] (料想) judge
  • 指定 : appoint; assign; allocate; appointment; destine; designation; assigning: (通過法律手續) 指定把...
  1. There are three stepwise stages of the procedure of the dispute solution, which includes the decision of engineers, the dab and the arbitration. chinese contractors shall take actions to protect their benefits. these actions includes the careful analysis on the claims and the strict managements of contracts, the well understanding of the contracts, especially the terms that exculpatory clause of the employers, then following of the procedure and catching the very chance to bring about claims

    文章出索賠是國際工程合同中的一種具有補償性的、非常講究時效和書面證據的歸責方式,承別基於工程變更、僱主違約、風險因素或合同瑕疵等原因對發提出索賠請求,工程師決、 dab爭端裁決和仲裁是解決索賠爭端的三種遞進的基本程序,中國承應從採取充論證索賠權,準確識別索賠機會,熟悉合同文件、嚴格管理合同,充認知僱主的免責條款、切實遵守索賠程序等多個方面維護自身的利益。
  2. It shall be the responsibility of all contractors, sub - contractors and their employees to observe statutory regulations and safe working practices as well as any further instructions issued by the construction manager or his nominee

    「承」 、 「」及其雇員有責任遵守法規和安全工作技術規程,以及「施工經理或其人」發出的進一步令。
  3. ( 1 ) the key factors of production investment refer to labor, capital, technology and other factors. ( 2 ) the term technology refers to those independent production factors which can be acquired in the market of production factors and whose cost and price are locked. ( 3 ) total production costs include not only the costs of labor and capital investments, but also the costs of technology and other production factors

    首先,在對傳統生產函數模型進行考察析的基礎上,對傳統生產函數進行了重新義: ( 1 )將生產投入的要素歸結為勞動、資本、技術和其它生產要素; ( 2 )技術是生產廠可以從生產要素市場上獲得的、具有一成本和價格的獨立的生產要素; ( 3 )生產總成本中,不僅括勞動和資本的投入成本,也括技術和其它生產要素的成本,因而,技術的增長也是有成本、有代價的。
  4. ( c ) the subcontracting of any part of the works for which the subcontractor is named in the contract

    合同中已被對工程的任何一部進行
  5. We have estimated the technical efficiency of each bank in 1985 - 2001, exploiting the two different approaches respectively, while the total loan, other investment and profit are specified as outputs, labor, net fixed asset and business expanse as inputs. then the technical efficiency is decomposed into pure technical efficiency and scale efficiency

    本文選用貸款、其它投資和利潤作為產出標,員工人數、固資產凈值和營業及管理費用作為投入標,別運用數據析和隨機前沿方法對1985 - 2001年我國主要的業銀行技術效率值進行估算,並將技術效率解為純技術效率和規模效率。
  6. 16 " tests on completion " means the tests specified in the contract or otherwise agreed by the engineer and the contractor which are to be made by the contractor before the works or any section or part thereof are taken over by the employer

    16竣工檢驗合同規的或由工程師與承另行的檢驗,這些檢驗是由承在僱主對工程或其任何部區段接收之前進行的。
  7. The issue will be divided into two portions for allocation in the primary market. the bigger portion, with a minimum size of hk 400 million, will be restricted for competitive bidding by the recognised dealers under the existing tendering mechanism administered by the hkma for exchange fund paper and specified instruments including nip notes

    是次發行的債券會在第一市場為兩部配,較大的部為數最少達億港元,是供金管局管理的外匯基金票據及債券和工具括在債券發行計劃下發行的債券的現有投標機制下的認可交易出價競投。
  8. Nominated sub - contracting system

    指定分包商制度
  9. Nominated subcontracting system

    指定分包商制度
  10. Nominated sub - contracting s

    指定分包商制度
  11. Nominated sub - contract

    指定分包商
  12. In column 2, nsc and dsc denotes nominated sub - contract arrangement and domestic sub - contract arrangement respectively for the associated building services works

    第二欄內的nsc及dsc指定分包商及承建自選的進行有關的屋宇裝備工程。
  13. Most public transport requires exact change and that s why we recommend that you get an octopus card. this electronic stored - value card is just like money and is accepted on most public transport including buses, minibuses, trains, ferries, the peak tram, and some taxis. it s even accepted at convenience stores and some fast food restaurants

    八達通卡是一張可多次使用的電子儲值卡,適用於香港多種交通工具上直接支付車資,括地鐵九廣鐵路巴士專線小巴渡輪山頂纜車和部計程車等,亦可用於便利店購物和在餐廳消費,是遊客暢游香港的必備好幫手。
  14. The word " work " means the engineering, design ( including, but not limited to, primary design, extended preliminary design and preparation of detailed design and construction drawings ), construction ( including, but not limited to, early work, site setting out, earth back filling works, sub - structure works, civil works, above - ground works, installation and testing ) and construction management services to be performed by the development manager and subcontractors pursuant to the provisions of this contract and a written authorization, and as modified from time to time in accordance with the provisions of this contract, and includes all designs, drawings, plans, means, methods, techniques, sequences and procedures and, unless expressed to the contrary in this contract, all materials, tools, utilities, labor, equipment services, licenses, permits, tests, warranties, guarantees, transportation and other items and facilities of every kind necessary for the complete performance of this contract

    「工程」一詞應由開發管理人和根據本合同的規和書面授權書執行的工程、設計(括但不限於初步設計、擴初設計以及深化設計圖和施工圖的準備) 、施工(括但不限於前期工作、現場布局、回填土工程、次結構工程、市政工程、地上工程、安裝和測試)及施工管理服務,該等服務可根據本合同的規被不時修訂,並括所有的設計、圖紙、計劃、手段、方法、技術、工序和程序以及,除非合同中有相反規,所有的材料工具、設施、工人、設備服務、執照、許可證、測試、保證、擔保、交通以及其他為圓滿執行本合同所需要的各種物品和設施。
  15. You agree that dns. com. cn will not be liable to you or any other person for any loss that may occur due to any loss of registration of a domain name, the use of your domain name, access delays of access interruptions to dns. com. cns registration system ; the non - delivery or misdelivery of data between you and dns. com. cn ; events beyond dns. com. cns reasonable control ; the processing of this application ; the processing of any modification to the record associated with your domain name, the failure of you or your agent to pay any fees hereunder ; or the application of the dispute policy

    ( viii )申訴依據的標或服務標志,並且如果存在,別描述每個標對應使用的品或服務(申訴方也可以別描述在提交申訴時,有意在將來用於該標的的其他品和服務) ; ( ix )本政策規,描述發起申訴的理由時應特別括: ( 1 )該域名(多個域名)與申訴方擁有所有權的標或服務標志完全相同或以混淆地類似的情況;以及
  16. After analysising the five factors ( schedule, quality, investment, claim, risk ) which influence the limit point, this paper presents that the clients should decide the time for the construction in accordance with their own characterististics and utilizing benefits, and decide the project quality according to the sum of purchasing costs ( the price of contracts ) and the utilizing costs ( the costs to run and maintain ), and make it most possible to use supervisim optimal design and construction and to reduce claim and risk, which gives the clients a satisfying project with minimal investmentat the same time, this article tells the contractors how to optimize and make decision to minimize the costs in practice on the basis of meeting the requirment of the clients

    析了影響極值點的進度、質量、投資、索賠和風險五大因素之後,提出了業主應結合自身的特點,根據工程使用效益來決工期,根據購置成本(即合同價格)和使用成本(即運行費和維護費)之和來決工程質量水平,並盡可能通過監理來優化設計、優化施工,減少索賠和風險,使業主最終既能得到滿意的工程,又能使總資金投入最小。同時,也出承應如何在滿足業主要求的前提下,進行優化和決策,使實際發生的成本最小。
  17. 6 " subcontractor " means the person named in the agreement and the legal successors in title to this person, but not ( except with the consent of the contractor ) any assignee

    ""合同協議所述人員及其法職務繼承人,但不括其任何受讓人(除非總同意) 。
  18. 8 " subcontractor " means any person named in the contract as a subcontractor, or any person appointed as a subcontractor, for a part of the works ; and the legal successors in title to each of these persons

    8 「合同中明為的所有人員,或為部工程的人員;及所有上述人員的合法繼承人。
  19. This electronic stored - value card is just like money and is accepted on most public transport including buses, minibuses, trains, ferries, the peak tram, and some taxis. it s even accepted at convenience stores and fast food restaurants. to pay a fare, simply place the octopus card on the reader located next to the fare box and the fare gets deducted electronically

    八達通卡是一張可多次使用的電子儲值卡,適用於香港多種交通工具上直接支付車資,括地鐵九廣鐵路巴士專線小巴渡輪山頂纜車和部計程車等,亦可用於便利店購物和在餐廳消費,是遊客暢游香港的必備好幫手。
  20. 3 " subcontractor " means any person named in the contract as a subcontractor for a part of the works or any person to whom a part of the works has been subcontracted with the consent of the engineer and the legal successors in title to such person, but not any assignee of any such person

    3本合同中作為工程某一部的任何當事人,或由工程師同意已將工程的某一部給他的任何當事人以及取得該當事人資格的合法繼承人,但不此當事人的任何受讓人。
分享友人