挖井工 的英文怎麼說

中文拼音 [jǐnggōng]
挖井工 英文
well digger
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  1. Open raise implies that building work is limited to the raise catwalk and the basis of a simple platform on which drilling personnel stand.

    開放式天,是指那些開過程中只需設置天升降梯道及供鉆站立的簡單基礎平臺的天
  2. This revolution was primarily a dry farming operation with springs and shallow hand-dug wells supplying domestic needs.

    這次革命主要是旱田耕作而以泉水和人提供生活用水。
  3. This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme

    此程序可以模擬單抽水時計算區域各點水位降深隨時間的變化,研究水流運動規律;求解任意邊界條件下的定流量抽水問題,預測潛水位,指導施進度,評價降水方案的合理性。
  4. By direct shear for and normal triaxial shear tests of non - saturated desert sand, the parper studied the effect of water content and dry density on the strength of the non - saturated desert sand, and set up the code of this sand. based on the plane strain test of non - saturated desert sand slope, the paper analysed the destruction way of the excavaion side during the construction by means of adding water, and brough forward a formule that calculates the allowable of excavation and pile hole

    通過非飽和沙漠砂直剪試驗和常規三軸剪切試驗,研究了含水量和干密度對非飽和砂強度的影響,建立了這種砂的強度準則。通過非飽和沙漠砂邊坡室內平面應變試驗,分析了沙漠場浸法施中就基坑壁的破壞方式,推導出了基坑和樁孔容許開深度的計算公式。
  5. The technique and application of the cast - in - site bored pile post - grouting construction

    薄壁沉法在孔樁基礎施中的應用
  6. Construction technique of sand brick sinking pile in deep water

    深水河中磚沉孔樁施技術
  7. Shaft excavation and lining construction in shisanling pumped storage power station

    十三陵抽水蓄能電站豎及襯砌施
  8. A rock - boring tool used in mining for sinking shafts

    機一種在采礦中用來掘礦時在石頭上打孔的
  9. Secondly, the paper analyzed the behavior of isotropic and orthogonal anisotropic materials " cws on the basis of above theory and software. regularities of cws " deformation inner force and shared load and earth pressure in excavating stage and driving stage were gained. regularities influenced by material features top beam excavating depth sidewall depth properties of soil layers rear backing and location of load were also obtained, especially rules of display degree exerted by circular and vertical loads were also obtained

    通過分析,得到了形成階段及頂進階段圓形的變位、結構內力、分載及土壓的分佈規律及材料性質、頂冠梁及圍檁、開深度、壁插深、土層性質、后靠背、頂載作用位置等因素對結構受力性狀的影響規律,特別是得到了在受力時結構環向與豎向承載作用發揮程度的規律。
  10. New technique of control digging shaft

    控制筒過量超的新
  11. Enmax equipment has been used in these industries throughout the world : horizontal directional drilling, petroleum, micro - tunneling, petrol - chemical, dredging, environmental, mining, municipalities and pit remediation

    這些設備在世界范圍內已經在非開水平定向鉆、油田、微型隧道、石油化、淤泥處理、環保、礦山、市政和廢漿池土壤恢復等業領域得以利用。
  12. A thorough quality control should be made in base construction. sixteen poles in longqiao iron mine poured into the wells can all satisfy designment requirement of engineering

    摘要在樁基施過程中進行全面的質量控制,龍橋鐵礦豎塔16根人孔擴底灌注樁程質量全部滿足設計要求。
  13. This method, without any new well logging technique, only mines the information quantitatively and does some meaningful work o n the quantitative interpretation of the temperature logs, which makes most of the existing resources and have good applicability and practical value

    該方法在不附加任何新測藝的情況下,充分地利用了現場實際生產中已有的大量溫度計測資料,進行信息定量掘,在溫度測信息的定量解釋上做出了有意義的結果,很好地利用了現有資源,具有較好的應用前景和實際應用價值。
  14. The obvious effects have been made in the adjustment of injection to - producing and water blocking by applying comprehensively the log information of degree of saturation and profile - log and tracer survey information to tap the zone of enrichment of remaining oil potential, analyze the direction of injected water streamline and guide the measures for tapping potential in tuo 7 fault block

    摘要總結了坨七斷塊綜合應用飽和度測資料、吸水剖面資料、水注示蹤劑資料,發掘剩餘油潛力富集帶、分析注水流線方向,指導油措施潛、注采調整和堵水調剖作所取得的明顯效果。
  15. The sliding resistance mechanism of deformable earth bodies by means of well point drainage lies in lowering the underground water level to reduce the water content of the earth bodies and raise the shear strength, improve the stability of the deformable earth bodies and increase their sliding resistance

    摘要點降水常用於地下水位高出開建基面許多或含水豐富的土體基坑程中,點降水在土質變形體中的抗滑作用機理在於,通過點降水,降低地下水位,使土體的含水量減少,提高其抗剪強度及變形體的穩定性,增加其抗滑力。
  16. The thesis introduces the biot ' s three - dimension consolidation theory based on absolute linear - elastic theory ; the thesis designs the pit dewatering scheme of hand - dug piles support of shenyang subway ' s shenyang station construction ; the thesis uses finite element program to simulate the influence on around environments caused by pit dewatering, and finds the change laws of earth mass inner stress and the effect parameters on the surface deformation on the basis of reasonable hypothesis and the analysis of ground water exploitation progress. combined with stochastic medium theory, the thesis introduces dewatering subsidence coefficient, sets up the predicting model of the surface deformation caused by dewatering, and develops the computing program ; by application of program on a single well of underwater exploitation, it is proved that the program is feasible, so the prediction of the surface deformation caused by underwater exploitation is realized

    本文介紹了基於線彈性本構關系的biot理論;設計了擬建沈陽地鐵沈陽站點人孔樁支護施的基坑降水方案;利用有限元程序,模擬了基坑降水對周圍環境的影響;在合理假設的基礎上,分析了地下水開采過程中,地層應力的變化規律,找到了影響地面變形的參數;與隨機介質理論相結合,通過引入采水下沉系數建立了地下水開采引起地面變形的預計計算模型,並編制了電算化程序;通過某單開采實例驗證了該方法的可行性,實現了地下水開采引起地面變形的預計。
分享友人