挖土作業 的英文怎麼說

中文拼音 [zuò]
挖土作業 英文
spade work
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞1 (行業) line of business; trade; industry 2 (職業) occupation; profession; employment; ...
  1. According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks

    根據多元化發展戰略,集團公司的務范圍除水電工程總承包外,還將務擴展到各類木工程、市政工程、海事工程的設計、施工、機械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成石方開15000萬立方米、混凝澆注1500萬立方米、發電機組安裝1000萬千瓦、鋼結構製安裝15萬噸的綜合施工能力。
  2. The contributions in this monograph may be valuable for the scientists and engineers engaged in spatial data mining, computer science, geomatics, geographical information system ( gis ), remote sensing ( rs ), global positioning system ( gps ), data analysis, artificial intellengence, cognitive science, spatial resources planning, land science, hazads prevention and cure, management science and engineering, decision making, and so on, and can also be used as a reference book for undergraduate students and graduate students

    本書可供空間數據掘、計算機科學、地球空間信息科學、地理信息系統( gis ) 、遙感( rs ) 、全球定位系統( gps ) 、數據分析、人工智慧、認知科學、空間資源規劃、地科學、災害防治、管理科學與工程和決策支持等領域的研究人員和開發人員使用,亦可為高等學校相關專的本科生、研究生教學用書和參考用書。
  3. Each netizen expert, the building that i live is 8 buildings, 1, 2 buildings are office business place, first floor place belongs to an unit to add floor, bearing in first floor aluminium is worn into travel burrow on column bridge, answer construct an office room, most lower level serves as a garage, and the earthy layer that also dug 1 meter toward subterranean reopen, is this excuse me influential to our building

    各位網友專家,我所居住的樓房為8層建築, 1 、 2樓為辦公營場所,一樓所屬單位為了增加樓層,便在一樓承重柱樑上進行打洞穿鋼精,答建一層辦公場所,最下層為車庫,而且也往地下再開了1米的層,請問這對我們的建築物有影響嗎?
  4. We are supplier of second hand cranes & forklifts, with our professional knownledge and years experience we have a clear understanding of the machine ' s characteristics & uses, we can provide our clients with a thorough introduction. not only we can help them to choose the most efficient machinery equipment for their engineering project, and also provide the reasonable & economical prices. if you have any special interests or needs, please contact us as soon as possible

    我們是重機械如:機,鏟機,堆高機及吊車等的中古買賣,憑著我們的專知識及多年的經驗,我們能清楚的?解機械的性質及功能,幫顧客詳實的說明及介紹,讓顧客選擇到對工程最有用途的機械設備,並且我們還可以提供最優惠,經濟的價格,如果您有興趣或需要,請盡速與我們連絡。
  5. Article 47 no sand collection, stone query, earth digging or waste dumping, explosive operations and other activities that would threaten the safety of roads, road bridges, road tunnels and road ferries is allowed within the perimeter of 200 meters of large and medium - sized road bridges or ferries and within a perimeter of 100 meters above road tunnels or outside the mouths of road tunnels and within a certain distance on both sides of the roads

    第四十七條在大中型公路橋梁和渡口周圍二百米、公路隧道上方和洞口外一百米范圍內,以及在公路兩側一定距離內,不得砂、採石、取、傾倒廢棄物,不得進行爆破及其他危及公路、公路橋梁、公路隧道、公路渡口安全的活動。
  6. Py160c grader is mainly used for land levelling, ditching, slop scraping, bulldozing, ripping, snowremoving in large areas of highway, airport, farmland etc, it is mecessary equipment for farmland improving

    Py160c型平地機主要用於公路,機場,農田等大面積平整和溝,刮坡,推、鬆、除雪等及農田改良所必須的工程機械設備。
  7. The epa raised concerns over the impact of dredging on the marine environment and of risks to indigenous fauna , in particular the flatback turtle

    對海洋環境的影響,以及對本物種,尤其是平背海龜面臨的風險,澳大利亞環境保護管理局( epa )表示擔憂。
  8. The epa raised concerns over the impact of dredging on the marine environment and of risks to [ color = red ] indigenous fauna [ / color ], in particular the flatback turtle

    對海洋環境的影響,以及對本物種,尤其是平背海龜面臨的風險,澳大利亞環境保護管理局( epa )表示擔憂。
  9. Meanwhile, it does not need a extra time to be carried out. it can continuously work during the excavation of trenches, so whole work cycle can be reduced. anchors and layers of shot concrete have replaced the traditional steel frames and piles, including concrete piles, steel piles, and they can largely economize construction materials, such as steel and concrete, reduce the amount of soil that would be excavated out, and improve work conditions

    錨桿施工機械及設備空間小,可為各種地形及場地使用,同時,它不獨占工期,而隨基坑開同步、流水進行,節約工期;用錨桿及噴射硅面層代替傳統的鋼支撐和樁(硅樁、鋼板樁) ,能夠大量節省鋼材、硅等建材,減少方開量且能改善施工條件;其次錨桿的預加應力可以通過抗拔實驗來獲得。
分享友人