挖土斷面 的英文怎麼說

中文拼音 [duànmiàn]
挖土斷面 英文
cut section
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ動詞1 (分成段) break; snap 2 (斷絕;隔斷) break off; cut off; stop 3 (戒除) give up; abstai...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • 斷面 : section; fracture surface; plane of fracture
  1. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開,除趾板與其下游1 / 9底寬范圍以及壩腳除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.層破碎帶處理,趾板部位採用混凝塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為板堆石壩的設計和研究提供參考與借鑒
  2. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692施工支護體應力監測的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開方法、支護體結構的應力量測方法及測試手段;分析了支護體初期支護工字鋼拱應力、錨桿軸力、噴射混凝內應力、臨時工字鋼支撐應力、二次襯砌鋼筋應力等測試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  3. In order to facilitate selection of tbms in a project based on engineering geology and hydrogeology conditions, project characteristics and environmental constraints, it is necessary to understand the operation mechanisms of different tbms and classify them accordingly

    本文介紹了各種類型的全隧道掘進機的運行機理,並根據最終開隧道,掌子的支護類型及巖體的破碎機理對全隧道掘進機進行分類。
  4. To discuss the feasibility of applying this technique into the practice of engineering, this paper references the real project of the running tunnel from great showplace to scientific house in shenzhen metro, uses the geotechnical centrifuge of southwest jiaotong university, then researches the settlement of the ground and the influence on the pipeline underground in stratum with abundant water by the technique of undraining spin - spay pile, at last draws a conclusion about the principle of the ground settlement with the construction method of excavating soil rich in water without dewatering at shenzhen metro

    為了探討離心模型試驗技術這一研究手段在地下工程中應用的可行性,結合地質、水文、結構較為復雜的深圳地鐵大科區間暗施工sk3 + 355的具體實例,應用我校新近建成的100gt工離心試驗機,採用離心模型試驗技術對在富水地層應用水平旋噴樁工藝進行控制降水施工對地表沉降變形及地下管線的影響進行了研究。
  5. With the rapid development of economy, large area of bare grounds, which are also called the man - made damaged surfaces, appeared in the process of large - scale construction and mining

    隨著我國經濟建設的不發展,大規模的基礎建設及工礦業生產過程對地表巖體的開移動已形成了大量的裸露,即地表人工創
  6. Aiming at crack problems in important hydraulic concrete structures, the cause, evolution rule and abnormality diagnosis of the crack are studied in this dissertation by using advanced theories and mathematics and mechanics, such as rough set theory, data mining, neural network, wavelet analysis, chaos theory, and so on, combining with prototype observation data. the main contents are as follows. ( 1 ) mining of cause of crack is proposed by using logic diagnosis, rough set theory, and data mining technique

    本文針對重大水工混凝結構運行期的裂縫問題,應用粗集理論、數據掘、神經網路、小波分析、混沌理論、突變理論等前沿數學方法及裂力學等力學方法,以及數值模擬等數值模擬方法和邏輯診方法,結合實測資料,對運行期裂縫的成因、演變規律以及轉異診等方進行了系統的研究。
  7. This thesis pass through the laser delimitation instrument and the geological radar instrument means, to tunnel initial stages support and secondary structure. at past the research of tunnel lining thickness depend on opening dig figure, don " t consider the effect of tunnel lining inner figure. adopting the integrate method of the laser delimitation instrument and the geological radar could most exact reflect the change rule of tunnel lining thickness, but also could do lots unbroken examination, have very important for summing - up the rule of tunnel lining thickness change, and have very amplitude extend value

    本文通過激光限界儀和地質雷達綜合方法,對新建高速公路隧道初期支護和二次襯砌混凝內輪廓和厚度進行了檢測,對襯砌厚度的分佈規律以往的研究中,多以開和襯砌的輪廓變化為依據,並未考慮襯砌內輪廓的影響,而採用激光輪廓限界儀和地質雷達綜合方法能較為準確的反應襯砌厚度的變化規律,並且能夠無破損的做大量的檢測工作,為總結混凝厚度的規律有很大作用,並有極大的推廣價值。
  8. A crack analysis of concrete road with excavation of deep foundation pit

    深基坑開引起鄰近混凝裂分析
分享友人