挖填作用 的英文怎麼說
中文拼音 [wātiánzuòyòng]
挖填作用
英文
scour and fill-
The same backfilling materials should be used unless otherwise agreed with the electricity supplier. if in doubt, the contractor must seek advice from clp or hec on the specific requirements for backfilling of excavation including the thickness of the bedding layer, type of materials to be used and method of compaction, etc
承建商如有任何疑問,必須就完成挖掘后進行回填工作的特定規格,包括墊層厚度、使用物料的種類及壓縮方法等資料,徵詢中華電力有限公司(中電)或香港電燈有限公司(港燈)的意見。This is why a special tunnelling machine capable of excavating through both soft ground as well as hard rock was used. without this machine, the tunnelling would have to be done by cut - and - cover method, causing major traffic and environmental disruption. with this tbm, all these impacts can be avoided
故此選用這臺既可在軟土又可在硬石層運作的隧道鉆挖機,避免以明挖隨填的方法開鑿隧道,免卻對交通及環境造成嚴重影響。Simulation and analysis are made for the various excavation schemes for the drift cut - and - fill stoping production in xiaotianjing mine district of heqing manganese ( group ) co. by 3 - d fem and the optimized excavation scheme has played a great role in assuring a safety mine production
應用三維有限單元法對鶴慶錳業集團公司小天井礦區上向進路分層乾式充填采礦過程進行了不同開挖方案的模擬分析,所優選的開挖方案對礦山安全生產起到較大作用,模擬結果與生產實際基本一致。As one type of dredging equipment, a cutter suction dredger can dredge material and fill land by continually cutting soil and transporting slurry to the disposal area
絞吸式挖泥船作為一種疏浚設備,單船作業可疏浚和吹填。它能連續地挖掘和輸送泥漿,因而具有廣泛的適用性和經濟性。Workmanship on building sites - code of practice for excavation and filling
建築工地操作工藝.第1部分:挖掘和填塞實用規程Variation of the soil suction of unsaturated soil slope under alternative action of infiltration and evaporation is studied taking a filled road slope and an excavated one as examples
將公路填方和挖方路基邊坡作為典型算例,研究了入滲、蒸發交替作用下非飽和土邊坡內吸力的變化。With the aid of his pickaxe, dant s, after the manner of a labor - saving pioneer, dug a mine between the upper rock and the one that supported it, filled it with powder, then made a match by rolling his handkerchief in saltpetre. he lighted it and retired
唐太斯拿起鶴嘴鋤,在大圓石和那塊頂住它的大石頭之間挖了一個如同工兵開路時想節省人力的坑沿,裏面填滿火藥,然後用他的手帕卷了一點硝石作導火線,點燃導火線,趕快退開。In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation
用有限元法模擬分析涵洞基坑開挖時,採用分層、分步模擬開挖過程的方法,即將計算域內單元分層「挖去」 ,使開挖表面成為無應力表面的方法,分析土體在卸載狀態時的應力場和位移場隨開挖深度的變化規律;在洞體施工后,回填土體時,據開挖完成時的應力場、位移場,通過逐級增加計算域內的單元數目,施加每級新增加單元的自重荷載,利用有限元法模擬基坑及上覆土體分層填築的施工過程,這不僅反映土體處于再加載應力狀態時,填土受力及變形的一般規律,而且這種將地基? ?涵洞? ?土體作為一個統一整體進行模擬的方法,量化了三者之間的相互作用關系。For the area of tianjin port which is short of sandy material, cement solidified soil, used as a new type of fill material, can not only help reduce the long distance transportation of sand fill, save energy and cut down engineering cost, but also make full use of the mucky clay dredged from basins and waterways
摘要採用水泥固化土作為新的充填材料,對于缺少砂土的天津港地區,不僅可以減少砂料長途運輸,節省能源,降低工程造價,而且可以充分利用港池和航道開挖的淤泥質粘土。Filling of landpond or excavation of land or diversion of stream for any column 1 use specified in the schedule of uses, or any usedevelopment always permitted under the covering notes
填土填塘或挖土或導流以作《土地用途表》所載任何第一欄用途或根據《注釋》的說明頁經常準許的任何用途發展All cut material will be used within the works site as fill material
所有挖掘物料將會作為堆填物料使用。15 all waste materials, excluding river and pond sediment, shall be segregated into categories covering : excavated material or construction waste suitable for reuse on - site, reclamation or fill, construction waste for disposal at public dump or landfill, chemical waste, and general refuse
除河流及塘底的沉積物之外,所有廢物應予分類,可包括:適合原地再用、用作填海或填料的挖掘物料或建築廢料;棄置於公眾傾卸場或堆填區的建築廢料;化學廢物;以及一般垃圾。Structural analysis using ansys was also performed to extract the influence of geometric design of subgrades on the responses of pavement structures, especially in cut - fill transitional section over longitudinal profiles and in cross sections. the determination of pavement materials as a result of traffic accumulation, environmental influence, and / or poor construction quality was investigated through the analysis of critical responses
結合實際交通軸載,全面分析了超載車輛對路面破壞的影響,同時還針對路基斷面型式、填挖過渡,施工質量、環境作用、材料退化等因素對路面關鍵響應的影響進行了分析。11 transport of dredged materials ( not used as filling materials for the projects ) shall be by water tight trucks / vessels to the marine barging points or designated marine disposal grounds
應使用有防水設備保護的貨車/船舶把挖掘出的物料(工程項目未有用作填料者)運往海上載駁點或指定的海上卸泥場。Using the finite element method ( fem ), the simulation and analysis on this construction process were carried on, and the different stress state of soil at different construction period was rendered. and the influence of different stress paths ( foundation excavation - unloading & excavation filling - reloading ) on the stress and the displacement was also reflected and researched. the law of non - linear constitutes of soil was presented in the simulation and analysis
模擬分析再現了土體的非線性本構關系,得到了基坑開挖時土體變形和應力變化的一般規律;在基坑及上覆土體回填時,通過分層填築的有限元模擬和地基、涵洞、土體三者相互作用的有限元分析,得到施工結束太原理工大學碩士學位論文時的位移場和應力場,同時求得涵洞的結構內力。He has contributed significantly towards experimental research in a wide range of practical problems including slope stability, reinforced fill, retaining walls and excavation support systems, submarine pipelines, piling and ground treatment processes. his contributions in retaining walls and reinforced soils earned him the sir benjamin baker silver medal awarded by the uk institution of civil engineers
他對實驗研究作出極大的貢獻,研究課題實用性高而且廣泛,包括邊坡穩定、加固填土、護土墻和深基開挖支撐系統、海底管道、樁基礎和地基處理。在護土墻及加固填土方面的研究使他贏得英國土木工程師學會的sirbenjaminbakersilvermedal 。Through the adoption of currently acceptable dredging, backfilling and capping rates, the construction and operation of either the east of sha chau or the south brothers facilities will not result in exceedances of the water quality objectives at specific sensitive receivers
透過採用現時通用的挖掘回填及封蓋速率,沙洲東部或磨刀洲南部設施在施工及運作期間,在個別敏感受體地點將不會出現超出水質指標的情況分享友人