挖掘坑 的英文怎麼說

中文拼音 [juékēng]
挖掘坑 英文
excavation pit
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : 動詞(刨; 挖) dig
  • 挖掘 : excavate; unearth; dig; tap; grub; hoe; grave
  1. Go down the sand pit and dig for the bones of stegosaurus

    快到大沙劍龍的骨頭吧。
  2. He digs a pit and hollows it out, then he falls into the hole that he has made

    15他,又深了,竟掉在自己所的陷阱里。
  3. He has dug a pit and hollowed it out, and has fallen into the hole which he made

    詩7 : 15他、又深了、竟掉在自己所的阱里。
  4. They did all kinds of men s work by preference, including well - sinking, hedging, ditching, and excavating, without any sense of fatigue

    她們寧肯干男人乾的活兒,包括井,修剪樹籬,開溝渠,刨,而且不感到勞累。
  5. The project " king s castle excauation " was split into 3 parts with 3 different excavation sites. the excavations log began on 2003 8 11 and ends on 2003 12 03. below is a portion of the logbook detailing the major discoveries

    這是王城再現計畫共分三個探,考古工作日誌由2003 / 8 / 11記錄到2003 / 12 / 03止,列出幾個重點事件日誌讓民眾了解過程。
  6. Whether there is any chance for the carcasses of pigs which died of foot - and - mouth disease to spread the disease if they are not properly treated before being buried in the pits dug by pig farmers in their farms ; and

    (二)把患有口蹄病的豬屍未經處理埋葬在由豬農在農場洞,是否有機會將病菌傳播;及
  7. He who digs a hole and scoops it out falls into the pit he has made

    15他,又深了,竟掉在自己所的阱里。
  8. He made a pit, and digged it, and is fallen into the ditch which he made

    15他,又深了,竟掉在自己所的阱里。
  9. Ensure that proper access is provided before entering any excavation and note the position of this access

    在進入挖掘坑之前,確認有適當地進出通道並牢記其位置。
  10. Guide to trench excavations shoring support and drainage measures

    有關壕工程的支撐設備及排水措施指引
  11. The heathen are sunk down in the pit that they made : in the net which they hid is their own foot taken

    列國陷入自己中,他們的腳在自己暗設的網里纏住了。
  12. Researching on the technology if reverse order is to study strains if pits, structural systems if basement, environmental surwey and underpinnings. on account of emphasizing developing methods if checking strength if pick - ets, modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites, which leads an active effect ; synthetic application if rankintheory, spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay, the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it. duringh the temporary survey and the environmental warship, bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation. based on systematic illustrating the reverse order, problems about application and development of reverse order and suggestions also are expressed

    鑒于國內外的研究把重點放在大力發展工程樁的實驗室承載力監測方法與設備、如何使土方開機械現代化及對周圍建築的臨測方法上,本文提出了現場利用聲波層析成像技術監測鋼砼樁內部質量的方法與程序,並得出了聲波層析成像技術是砼樁的動態質量檢測的有效手段,這對指導施有積極、現實意義;提出了綜合運用朗肯土壓力理論、基空間和時間效應影響理論來分析逆作法施工過程中基邊坡土體應力及應變的變化情況,指出粘土地區也應考慮時間效應,並且進一步分析了基邊坡土體的塑性區形成和發展,找出邊坡最不利的區域,以確定地下室土體的的方式和順序,指出憑主觀臆斷與經驗來施工是不可取的;在分析、經較逆作法與大開順作法的地下室結構體系受力情況及施工順序的不同,提出了節點處理技術;分析了逆作法施工期間樁的沉降變化原因及由此而產生的差異,並探討了解決的方法;本文還提出了環境振動對土體邊坡穩定產生影響的觀點,並分析了在環境振動影響下,土體的應力狀態及土休失穩破壞概率,並且還運用彈性力學知識和數學分析的方法定量地分析了地下混凝土墻受力狀態,指出了被監測墻體的最大應力、應變位置。
  13. Dredging of an immersed tube tunnel trench to - 30mpd alongside the existing gravity structure seawalls would undermine the seawalls, the bases of which are around - 5mpd

    現有的重力式結構海堤的地基在主水平基準面以下約5米,沿海堤沉管隧道道至主水平基準面以下30米會削弱這些海堤。
  14. Dredging of a series of seabed pits within either the east of sha chau facility or south brothers boundaries

    在沙洲東部或磨刀洲南部設施范圍內一系列的海床
  15. The project involves trench excavation, construction of cable trough, cable laying, backfilling and reinstatement works and landscaping works

    工程包括、興建混凝土電纜槽、電纜鋪設、回填和修復工程、和景觀美化工程。
  16. The purpose of the assessment was to thoroughly evaluate both the south brothers and east of sha chau facilities in terms of the acceptability of predicted impacts to water quality, marine ecology, fisheries, hazard to health, noise and cultural heritage from dredging, backfilling and capping of the pits, as well as the residual impacts and those from concurrent activities

    這評估的目的是深入評估磨刀洲南部及沙洲東部設施,就回填及封蓋泥對水質海洋生態漁業健康危害噪音及文化遺產可能造成的影響,並對剩餘影響及同期進行其他相關活動時的影響,作出全面評估。
  17. An open excavation or pit from which stone is obtained by digging, cutting, or blasting

    採石場通過、切割或爆破巖石來獲取石料的露天道或洞
  18. Since these substances exist in a form that cannot be released in open air unless being exposed to an environment over 700 degree celsius, the contaminated sediments are dredged and disposed of at east sha chau contaminated mud pit in the usual manner

    由於這些物質以固定形態存在,除非暴露于攝氏700度以上的環境,否則不會被釋放到空氣中,因此我們以慣常方式受污染的泥沙,並把這些泥沙棄置在東沙洲污泥卸置內。
  19. Based on the above, the multi - pit purpose - dredged contained aquatic disposal facility at east of sha chau is recommended for detailed design and implementation

    基於上述原因,顧問建議對位於沙洲東部的多式目的性
分享友人