挖方工程 的英文怎麼說
中文拼音 [wāfānggōngchéng]
挖方工程
英文
cutting works-
This paper recurred to the basic theory of rough set of data mining and under the direction of the frame of intelligent decision, the main theories include i ) the different methods of data mining on the base of rough set are used to deal with typical decision system namely consistent decision system and inconsistent decision system in order to carry through data reduction and rule distilment ; ii ) in the environment of dynamic increment database, the methods of data reduction to deal with the original data and increment data are discussed in the consistent and inconsistent decision system ; iii ) the method of data mining of rough set is analysized to treat with the attributes with priority ; iv ) on the base of basic rough set theory, the data analysis methods of amalgamation of rough set theory ; v ) and also the pre - disposal method to database is analysize
本文從系統工程進行決策分析的角度出發,藉助數據挖掘技術中粗糙集的基本理論,在智能決策框架的指導下,研究了基於數據挖掘的智能決策理論及方法。主要理論包括:如何利用粗糙集對典型的決策系統即相容性決策系統和不相容性決策系統運用不同的數據挖掘方法進行有效的數據約減和規則提取;在增量動態的數據庫環境下討論了在典型決策系統中對原始數據和增量數據進行數據約減的方法;分析了帶有優先權屬性的粗糙集數據挖掘方法;以基本粗糙集為基礎探討了粗糙集擴展模型的數據分析方法;研究了粗糙集數據預處理方法。To reduce earthwork costs, the volume of the fills should be equal to the volume of the cuts.
為了降低土方工程的費用,填方量應等於挖方量。Based on the relative independence of mathematical cover and physical grid, and considering the action of truely existent various equilibrant force in system for system balance, a method of simulation for excavation unloading using numerical manifold method in geotechnical engineering is proposed
摘要基於數值流形方法數學覆蓋與物理網格的相對獨立性,考慮任一時刻體系中真實存在的各平衡力項對體系平衡的作用,提出用數值流形方法模擬巖土工程開挖卸荷的方法。Granular materials is the object or medium actuated by lots of engineering machinery and bulk solids handling machinery. digging and breakdown of the granular structure is a major actuating mode or objective in granular engineering
散體材料是許多工程機械與散貨裝卸機械的工作對象與工作介質,散體結構的挖掘與破壞是散體工程中的一個主要工作方式與目的。On the basis of the concept and analysis method of slope geological structure, four typical slope geological structures are selected by some investigations on more than one hundred high rock slopes in the motorway project. these structures are thick sandstone stratum, stratum including weak coal, stratum made of red or brown plastic clay and soft rock mass and stratum made of remnants rock mass. the practical slope geological structures are compact basis of geological mechanical model for the analysis of relaxation zone in high rock slope projects
在介紹了坡體結構概念並提出建立坡體結構方法的基礎上,根據對京珠高速公路粵境北段路塹高邊坡工程中百余處巖石高邊坡的調查總結,選擇了其中較為具有代表意義的厚層砂巖、煤系地層、紅土地層及殘坡積層路塹高邊坡共4類巖石高邊坡作為研究對象,為對巖石高邊坡開挖鬆弛區的分析打下了堅實的實際地質力學模型基礎。According to the multi - areas development strategy, the corporation has expanded its business to engineering and construction of all kinds of civil works, municipal and public works, marine works, dredging and reclamation works as well as manufacture and installation of hydraulic steelworks and electro - mechanical equipment, with the major annual capacity of 150 million m3 in earth and rock works, 15 million m3 in concrete production and placement, 10, 000 mw in installation of generating units, and 150, 000 tons in manufacture and erection of hydraulic steelworks
根據多元化發展戰略,集團公司的業務范圍除水電工程總承包外,還將業務擴展到各類土木工程、市政工程、海事工程的設計、施工、機械設備和金屬結構製造安裝等,核心競爭力進一步得到擴展和增強,形成了年完成土石方開挖15000萬立方米、混凝土澆注1500萬立方米、發電機組安裝1000萬千瓦、鋼結構製作安裝15萬噸的綜合施工能力。In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future
本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個水平剖線和4個垂直剖線等不同情況,從以下幾個方面具體分析研究了計算斷面的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷面的主應力矢量圖、位移分布圖( ux 、 uy )以及應力等值線色譜圖( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同水平與垂直剖線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同水平或垂直剖線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。Abstract : this paper introduces the scheme, deep cut of foundation pit to bury pipe, which is adopted for wenjiayan seawall in qiantang rever. compared with the scheme of withstanding pipe, this scheme has the advantage of saving investment, simple construction and time + - saving. it is convenient to check the anti - seep installation between water pipe and seawall
文摘:本文通過錢塘江聞家堰海塘深基坑開挖埋管,替代原設計頂管方案,具有工程投資省、施工簡單、工期短,且便於檢查取水管與海塘之間防滲措施This article canvass the status quo of the archive ' s automatization administration and the develop status of data mining, and discusses how to combine the data mining technology with the archive work from data cleaning means, data mining arithmetic, and data storage etc. and this article put forword a data mining syst em design idea. this article ' s structure is : first, in allusion to the archive data status quo, the pretreatment work of archive data that include data quality evaluation, data cleaning and data commut - ation process is bringed forword ; second, in the process of realizating data mining, the article discusses conception description, association rule, class three familiar means of applicating data mining, also put inforword the concrete arithmetic and the program design chart, and discusses the range and the foreground of all kinds of arithmetic when they are applicated in the archive ; third, the base of so you say, this article also discusses the importance of the archice applicate data storage and the means of realizing it ; last, the article discusses seval important problem of realizing an archive data mining system from data, diversity, arithmetic multiformity, mining result variety and the data pretreatment visibility, mining object descriptive visibility, mining process visibility, mining result visibil ity, user demand description and problem defining etc aspect. the article ' s core is how to import data mining technology in the archive work
本文評述了檔案自動化管理現狀和數據挖掘技術的發展狀況,從數據清洗方法、數據挖掘演算法、數據倉庫的建立等方面論述了如何將數據挖掘技術與檔案工作相結合的具體思路,並提出了一個數據挖掘系統的設計思想。文章首先,針對檔案數據的現狀,提出了應對檔案數據進行預處理工作,包括數據質量評估、數據清理、數據變換和歸約等過程;其次,在具體實現數據挖掘過程中,本文結合檔案數據的特點探討了概念描述、關聯規則、分類等三種常見挖掘形式的實現方法,提出了具體的實現演算法和程序設計框圖,並論述了各種演算法在檔案工作中的應用范圍及前景;第三,在上述基礎上,又論述數據倉庫在檔案數據挖掘中的重要性並提出了實現一個檔案數據倉庫的方法;最後,從處理數據的多樣性、演算法的多樣性、挖掘結果的多樣性、數據預處理可視化、挖掘對象描述的可視化、挖掘過程可視化、結果顯示可視化、用戶需求的描述及問題定義等幾方面討論了實現一個檔案數據挖掘系統的幾個重點問題。全文以探討如何將數據挖掘技術引入到具體的檔案工作實踐中為核心。If provided with high pressure pump and water gun, it can make up a hydraulic mechanized earth work unit, used for ground leveling, dredging in rivers and pools, digging, excavation and transportation in small hydraulic engineering, as well as the air defense and underground project in cities
若與高壓水泵,水槍配合,組成水力機械化土方工程機組,就可用作于土地平整,河道與池塘的疏浚、鑿開等小型水力工程的挖方與輸方,以及城市的防空工程,地下工程。In soft foundation strength, filling soil, excavating project it becomes more and more widely used
加筋土廣泛地應用於地基加固,填方工程,挖方削坡工程等。Analysis of slope stability is one of the most important problems in geotechnical engineering. the stability of all kinds of natural slope, higeway, airport, refuse dump, dam, fill, excavation need to be analysed
在土木工程中,邊坡穩定分析十分重要,如各種各樣的天然邊坡、高速公路、機場、填埋場、土石壩工程、各種填方、挖方工程等等都需要進行穩定分析。1 no excavation shall be carried out where rare tree species acmena acuminatissima and the protected tree tutcheria championii are located, as shown in figure 2 of this environmental permit
挖掘工程不得於稀有樹木品種俏蒲桃和受保護樹木石筆木的地方(見環境許可證的圖2 )進行。The major activities involved during the construction stage of the project are cut and fill earthworks, slope works, earth retaining walls, irrigation buffer lake, detention ponds and tanks, sand bunkers and golf course capping and turfing
2 . 3 . 1在工程項目的施工期內,主要的工程活動包括挖填土方工程斜坡工程護土墻灌溉緩沖湖靜水塘缸沙坑及高爾夫球場的加蓋草皮鋪設。The enterprise schaefer wilhelm gmbh is well - known and engaged not only in mannheim, but also in the specialized industries of its sphere of activity, with imports, importer, spare part service and at the same time with rush service, dumpers and earth - moving machinery a competent partner
Schaefer wilhelm gmbh是一家現代化的、可靠的專門產品供應商,這家供應商從事挖掘機,翻斗車,快速服務,備用品服務,總進口商,進口貨、輸入物,進口商,工業機械,緊湊型挖掘機,履帶式裝載機,爬行車焊縫,牧羊人,服務維修,土方工程機械,運輸技術的製造、銷售。No laying of cables across ho chung valley shall be allowed until the rescue excavation is completed to the satisfaction of the director
待搶修挖掘工程完成並使署長滿意后,方可鋪設貫穿蠔涌谷的電纜。On construction and demolition waste management, mr lo noted that nearly all the 550 000 cubic metres of tunnel spoil from this contract will be reused in the penny bay reclamation project or processed into aggregates at a local quarry
至於建築和拆卸廢料管理方面,盧耀楨指出南灣隧道挖掘工程所產生的五十五萬立方米物料,差不多全部都不會浪費,並會在竹篙灣填海工程項目中循環再用,或在本地石礦場加工製成碎石,以供建築工程使用。Any pond filling works or excavation works within the conservation zones, including " conservation areas ", " coastal protection areas " and " sites of special scientific interest ", in nearly all rural areas in the new territories must obtain the prior approval of the town planning board
在大部份新界鄉郊的自然保育區、海岸保護區及具特殊科學價值地點等自然保育地帶內進行填塘或挖掘工程,均須事先取得城市規劃委員會批準方可進行。One can receive individual offers fast around conveying technology, hoists and at the same time on compact excavator, excavator and earth - moving machinery and beyond that also on mini loader by mail from gehl europe gmbh
Gehl europe gmbh是一家知名的、誠信的生產商和服務商,該公司提供新型的、專門的產品,例如挖掘機,緊湊型挖掘機,起重裝置、升降機,土方工程機械,運輸技術。1 the permit holder shall, not later than 2 weeks before commencement of dredging at the site, submit details on silt curtains to be used, including dimensions, exact locations and method of installation and removal, to the director for approval
許可證持有人須在工地展開挖泥工程至少兩星期前,向署長提交所採用的隔沙網詳情,包括網的大小、準確位置,以及安裝和拆除的方法,待署長批準。分享友人